Hill County, Mont., funds by Interior, Department of
Listing $33,162,729.00 in stimulus funds from Interior, Department of for Hill
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CHIPPEWA CREE CONSTRUCTION CORP | $27,526,000 | Rocky Boy's/North Central Montana Regional Water System (a) Project Management, Design and Construction of the Intake Superstructure ; (b) Project Management, Design and Construction of the Core Pipeline Segments | Bureau of Reclamation | 9/15/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $1,824,378 | Highway Planning and Construction Consists of all-encompassing street rehabilitation and safety improvement projects of the BIA streets in Rocky Boy's. It will include crack sealing, pothole patching, and chip sealing all paved streets, clean and repair drainage structures, update/install | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $706,465 | Road Maintenance_Indian Roads This Road Repair and Restoration project is located on Route 5 and is 8.5 miles in length. The project consists of a rehabilitation of the paved surface and safety improvements along the entire road corridor. The safety improvement portion of the project | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $593,856 | Highway Planning and Construction This Project is located on Route 2 and is 9.7 miles in length. The project consists of a rehabilitation of the paved surface and safety improvements along the entire road corridor. The safety improvement of the project is phase I and will include removal | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $453,391 | Highway Planning and Construction This project is located on BIA Route 114 starting at the reservation boundary and proceeding south to Bear Paw Ski area. The project consists of a rehabilitation of the paved surface and safety improvements along the entire road corridor. The pavement reh | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $440,000 | Forests and Woodlands Resource Management REMOVAL OF HAZARDOUS FUEL REDUCTION IN THE WUI/NON-WUI SETTING. | Indian Affairs (Assistant Secretary) | 6/01/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $440,000 | Forests and Woodlands Resource Management REMOVAL OF HAZARDOUS FUEL REDUCTION IN THE WUI/NON-WUI SETTING. | Indian Affairs (Assistant Secretary) | 6/01/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $320,035 | Road Maintenance_Indian Roads This project is located on Route 6 and is 10.6 miles in length. The project consists of a rehabilitation of the paved surface and safety improvements along the entire road corridor. The safety improvement portion of the project is phase I and will include | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $226,000 | ARRA - Facilities O&M | Indian Affairs (Assistant Secretary) | 1/21/2010 |
CHIPPEWA CREE TRIBE, THE (INC) | $226,000 | Replacement and Repair of Indian Schools ARRA Facilities O & M | Indian Affairs (Assistant Secretary) | 1/21/2010 |
CHIPPEWA CREE TRIBE, THE (INC) | $226,000 | Replacement and Repair of Indian Schools ARRA - Facilities O & M | Indian Affairs (Assistant Secretary) | 1/21/2010 |
CHIPPEWA CREE TRIBE, THE (INC) | $115,120 | Highway Planning and Construction Estimated project cost is $115,120. This project is the ?on reservation? portion of the Taylor Hill/Mission project and is 2.9 miles in length. It begins at the intersection of Route #1 and Route #2 at Rocky Boy Agency, and proceeds in an easterly direct | Indian Affairs (Assistant Secretary) | 8/14/2009 |
CHIPPEWA CREE TRIBE, THE (INC) | $65,484 | Road Maintenance_Indian Roads Estimated project cost is $65,484. This multi-route Road/Bridge Repair and Restoration project includes route and bridge assessments on each BIA-owned route on the Chippewa Cree IRR system in order to identify those activities required to assure that an | Indian Affairs (Assistant Secretary) | 2/23/2010 |