Hall County, Neb., funds by General Services Administration

Listing $1,701,030.75 in stimulus funds from General Services Administration for Hall

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
BOYD JONES CONSTRUCTION COMPANY $704,606 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
Jerry's Sheet Metal, Heating & Cooling, Inc. $545,033 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
O'Neill Transportation & Equip $157,104 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
MIDDLETON ELECTRIC INC. $127,940 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
Allied Construction Services, Inc. $75,561 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
BAMFORD, INC. $26,709 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. $21,302 Updated the design of Heating, Ventilation, and Air Conditioning system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based
This spending item is part of a $45,614 allocation. See details
Public Buildings Service 12/18/2009
Moen Steel Erection, Inc. $12,932 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
McKinnis Roofing and Sheet Metal, Inc. $9,815 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
Kucera Construction & Painting $8,500 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
BUILDING COMMISSIONING, L.L.C. $8,000 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. $2,729 Updated the design of HVAC system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based on as-builts from Replace Perimeter H
This spending item is part of a $19,531 allocation. See details
Public Buildings Service 8/06/2009
Don Wasson Co $800 The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation. See details
Public Buildings Service 9/24/2009