Hall County, Neb., funds by General Services Administration
Listing $1,701,030.75 in stimulus funds from General Services Administration for Hall
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BOYD JONES CONSTRUCTION COMPANY | $704,606 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
Jerry's Sheet Metal, Heating & Cooling, Inc. | $545,033 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
O'Neill Transportation & Equip | $157,104 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
MIDDLETON ELECTRIC INC. | $127,940 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
Allied Construction Services, Inc. | $75,561 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
BAMFORD, INC. | $26,709 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $21,302 |
Updated the design of Heating, Ventilation, and Air Conditioning system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based
This spending item is part of a $45,614 allocation.
See details
|
Public Buildings Service | 12/18/2009 |
Moen Steel Erection, Inc. | $12,932 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
McKinnis Roofing and Sheet Metal, Inc. | $9,815 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
Kucera Construction & Painting | $8,500 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
BUILDING COMMISSIONING, L.L.C. | $8,000 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $2,729 |
Updated the design of HVAC system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based on as-builts from Replace Perimeter H
This spending item is part of a $19,531 allocation.
See details
|
Public Buildings Service | 8/06/2009 |
Don Wasson Co | $800 |
The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist
This spending item is part of a $1,686,332 allocation.
See details
|
Public Buildings Service | 9/24/2009 |