Stutsman County, N.D.
U.S. | North Dakota | Stutsman | |
---|---|---|---|
Population | 308,745,538 | 672,591 | 21,110 |
Total recovery funding | $522,082,377,600 | $1,628,705,667 | $69,234,152 |
Funding per Capita | $1,691 | $2,422 | $3,280 |
Unemployment
7/2008 |
6.2 |
3.2 |
2.5 |
7/2009 |
+3.6
9.8 |
+0.8
4.0 |
+0.6
3.1 |
7/2010 |
-0.2
9.6 |
-0.5
3.5 |
+0.2
3.3 |
7/2011 |
-0.6
9.0 |
-0.1
3.4 |
+0.0
3.3 |
7/2012 |
-0.9
8.1 |
-0.5
2.9 |
-0.3
3.0 |
This site was updated in September 2012. It includes recipient-reported data through the second quarter of 2012, which was released in July 2012.
Important: This interactive database is not kept up-to-date and should be treated as a historical snapshot. As records may have changed since we stopped making updates, researchers and consultants wishing to use the data should check against original sources for accuracy before using any data published here.
Those wishing to download the data can find it at the ProPublica Data Store.
Funding by Federal Agency and Department
Click total to see spending list | ||
---|---|---|
Agriculture, Department of | $41,455,161 | |
Environmental Protection Agency | $7,435,080 | |
Interior, Department of | $6,044,016 | |
Education, Department of | $5,207,779 | |
Energy, Department of | $4,076,073 | |
Transportation, Department of | $1,577,892 | |
Social Security Administration | $1,104,500 | |
Small Business Administration | $865,000 | |
Health and Human Services, Department of | $597,785 | |
U.S. Army Corps of Engineers | $569,652 | |
Justice, Department of | $239,547 | |
Housing and Urban Development, Department of | $61,667 |
Show more/fewer agencies
Projects
Stimulus contracts, grants and loans in Stutsman County, N.D.
Data last updated on September 2012.
We have CSV files available for download. Sign up here.
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
LUTHERAN CHARITY ASSOCIATION | $8,000,000 | Loan | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Agriculture, Department of / Rural Housing Service | 12/10/2009 |
LUTHERAN CHARITY ASSOCIATION | $8,000,000 | Loan | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Agriculture, Department of / Rural Housing Service | 12/10/2009 |
LUTHERAN CHARITY ASSOCIATION | $8,000,000 | Loan | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Agriculture, Department of / Rural Housing Service | 12/10/2009 |
LUTHERAN CHARITY ASSOCIATION | $7,000,000 | Loan | Community Facilities Loans and Grants Community Facilities Loans and Grants - ARRA | Agriculture, Department of / Rural Housing Service | 12/10/2009 |
STUTSMAN RURAL WATER USERS INC | $4,341,836 | Grant |
Capitalization Grants for Clean Water State Revolving Funds Administration of Clean Water State Revolving Loan Fund (CWSRF) projects using funds provided under the American Recovery and Reinvestment Act (ARRA) of 2009. The following types of projects will be funded with CWSRF ARRA funds: wastewaterer treatment pla... Show more
This spending item is part of a $16,639,100 allocation.
See details
|
Environmental Protection Agency | 5/26/2009 |
COMMUNITY ACTION REGION VI | $3,597,889 | Grant |
Weatherization Assistance for Low-Income Persons Weatherization of low income clients homes in the state of North Dakota. It is planned to weatherized approximately 3267 homes. Weatherization will receive general heat waste measures, insulation measures, diagnostics, windows and doors, Health and d Saf... Show more
This spending item is part of a $25,754,013 allocation.
See details
|
Energy, Department of | 3/31/2009 |
JAMESTOWN, CITY OF INC | $3,093,244 | Grant |
Capitalization Grants for Drinking Water State Revolving Funds Administration of Drinking Water SRF ARRA projects.
This spending item is part of a $22,100,000 allocation.
See details
|
Environmental Protection Agency | 5/18/2009 |
MULTIPLE RECIPIENTS | $2,510,047 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture, Department of / Rural Housing Service | 8/31/2009 |
DAKOTA CENTRAL TELECOM I, INC. | $2,252,250 | Grant | Broadband Initiatives Program A grant to provide broadband services to the remote rural areas of Streeter and Gackle North Dakota. | Agriculture, Department of / Rural Utilities Service | 3/29/2010 |
Jamestown Public School Foundation | $2,233,735 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
KEPLIN-GRACON JV | $1,908,366 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $1,092,750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2009 |
MULTIPLE RECIPIENTS | $895,974 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/31/2010 |
MULTIPLE RECIPIENTS | $834,821 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/30/2010 |
MULTIPLE RECIPIENTS | $772,708 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/30/2010 |
JAMESTOWN, CITY OF INC | $739,131 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grant: Areas with Population equal to or less than 200K | Transportation, Department of / Federal Highway Administration | 5/05/2009 |
JAMESTOWN PUBLIC SCHOOL FOUNDATION | $648,425 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of the IDEA.
This spending item is part of a $26,552,439 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
JAMESTOWN PUBLIC SCHOOL FOUNDATION | $568,696 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
RTS SHEARING, LLC | $550,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 3/23/2009 |
JAMESTOWN, CITY OF INC | $525,665 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 10/16/2009 |
MULTIPLE RECIPIENTS | $488,387 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/31/2010 |
FORMATIONS INC. | $475,245 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
COMMUNITY ACTION REGION VI | $474,051 | Grant |
ARRA - Community Services Block Grant ARRA Supplemental Funding for the Community Services Block Grant (CSBG) Program. The North Dakota Department of Commerce awarded each of the 7 Community Action Agencies in the state their proportional share of the 99% pass-through of the CSBG ARRA grant.
This spending item is part of a $4,573,445 allocation.
See details
|
Health and Human Services, Department of / Administration for Children and Families | 4/10/2009 |
MULTIPLE RECIPIENTS | $466,378 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/30/2010 |
BERGSTROM ELECTRIC, INC. | $423,264 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMES RIVER SPECIAL EDUCATION COOPERATIVE | $391,492 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of the IDEA.
This spending item is part of a $26,552,439 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
JAMESTOWN COLLEGE | $338,112 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of | 5/04/2010 |
LUNSETH PLUMBING AND HEATING CO. | $299,284 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Streyle Masonry Inc | $298,000 | Contract | Add alternative energy feature to the design and construction to include but not limited to a geothermal system. | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2010 |
HUMAN SERVICES, NORTH DAKOTA DEPARTMENT OF | $296,534 | Grant |
State Energy Program The North Dakota State Energy Program (NDSEP) goal is to improve energy efficiency and reduce the rate of energy demand growth. NDSEP promotes energy conservation, works to reduce energy demand growth rates and implements program activities to reduce im
This spending item is part of a $24,585,000 allocation.
See details
|
Energy, Department of | 4/21/2009 |
MULTIPLE RECIPIENTS | $281,356 | Loan | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Agriculture, Department of / Rural Housing Service | 6/30/2010 |
SCHMITZ INC | $259,348 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $244,608 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 7/31/2010 |
TIRMAL LODGING LLC | $243,500 | Loan | 7(a) Loan Guarantees RURAL LENDER ADVANTAGE | Small Business Administration | 4/01/2010 |
SUN SPOT SOLAR, LLC | $224,040 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
BORDER STATES PAVING, INC. | $192,000 | Contract |
Rebuild Crest Road, Pipestem Dam, Jamestown, ND. Reconstruction of existing asphalt roadway.
This spending item is part of a $432,000 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
CS DUBOIS CONSTRUCTION, INC. | $176,800 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Hillerud Construction Inc | $169,213 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
AUDITORS OFFICE, STUTSMAN COUNTY OF | $164,762 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible) | Transportation, Department of / Federal Highway Administration | 4/15/2009 |
JAMESTOWN COLLEGE | $163,633 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of / DOED - Student Financial Assistance Programs | 5/12/2010 |
MULTIPLE RECIPIENTS | $156,465 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 12/31/2010 |
Medina School District 3 | $154,866 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
Pingree Buchanan School District 10 | $152,517 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
JAMESTOWN, CITY OF INC | $149,693 | Grant | Public Safety Partnership and Community Policing Grants The COPS Hiring Recovery Program (CHRP) provides funding directly to law enforcement agencies to hire and/or rehire career law enforcement officers in an effort to create and preserve jobs, and to increase their community policing capacity and c crime preve... Show more | Justice, Department of | 7/01/2009 |
AUDITORS OFFICE, STUTSMAN COUNTY OF | $148,334 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible) | Transportation, Department of / Federal Highway Administration | 4/14/2009 |
NORBY'S OFFICE SERVICES, INC. | $147,867 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
CUSTOM AIRE, INC. | $147,375 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
DAWSON WELDING INC | $139,982 | Contract |
Rebuild Crest Road, Pipestem Dam, Jamestown, ND. Reconstruction of existing asphalt roadway.
This spending item is part of a $432,000 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
Frank Froehle Professional Car | $131,300 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $130,285 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/30/2010 |
EISENBRAUN AND ASSOCIATES, INC. | $129,882 | Contract |
This project consists of furnishing all services, labor, plant, equipment, materials and transportation necessary to acquire, process and deliver digital color imagery and LiDAR data for the Bowman-Haley Lake project area in western North Dakota and the P
This spending item is part of a $614,524 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
T M T INVESTMENTS | $128,935 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/22/2010 |
GASAL BROTHERS PARTNERSHIP | $123,786 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 7/12/2010 |
COMMUNITY ACTION REGION VI | $123,734 | Grant | ARRA - Head Start This award provides for ARRA Cost of Living Adjustment (COLA), and Quality Improvement Funding consistent with the provisions of Section 640(a)(5) of the Head Start Act for the Head Start and/or Early Head Start program. Head Start promotes the school re | Health and Human Services, Department of / Administration for Children and Families | 7/01/2009 |
Lux Concrete | $120,839 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
ENERCEPT, INC. | $110,761 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MONTPELIER SCHOOL DISTRICT | $102,513 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
Lam-Wood Systems, Inc. | $99,748 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
DAKOTA FENCE COMPANY | $97,593 | Contract |
Rebuild Crest Road, Pipestem Dam, Jamestown, ND. Reconstruction of existing asphalt roadway.
This spending item is part of a $432,000 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
MELAND LUMBER & MATERIAL CO. | $97,540 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMESTOWN, CITY OF INC | $89,854 | Grant | Recovery Act - Edward Byrne Memorial Justice Assistance Grant (JAG) Program / Grants To Units Of Local Government The goal of this award is to enhance our department equipment needs, training and technology upgrades resulting in improved officer safety, job performance improvement and keeping up withth technology advancements. They outcome will be improvement in all a... Show more | Justice, Department of | 7/30/2009 |
ANNE CARLSEN CENTER FOR CHILDREN | $85,800 | Grant |
Special Education - Grants for Infants and Families, Recovery Act Assist States in the implementation of a statewide, comprehensive, coordinated, multidisciplinary, interagency system of early intervention services for infants and toddlers with disabilities and their families.
This spending item is part of a $2,398,294 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $80,103 | Contract | General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2010 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $80,103 | Contract | General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2010 |
D & M INDUSTRIES, INC. | $77,651 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
FALCK FARMS | $72,923 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/17/2010 |
HOUSE OF COLOR, INC. | $72,173 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
ECONOMY PLUMBING INC | $71,262 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Medina School District 3 | $71,064 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
L S Drywall | $68,663 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMESTOWN, CITY OF INC | $64,100 | Grant | Energy Efficiency and Conservation Block Grant Program (EECBG) Energy Efficiency and Renewable Energy Block Grant | Energy, Department of | 8/28/2009 |
CENTRAL TERRITORIAL OF THE SALVATION ARMY | $61,667 | Grant |
Homelessness Prevention and Rapid Re-Housing Program (Recovery Act Funded) Funds were awarded to 15 private non-profits to carry out the eligible activities under the HPRP program. These activities include financial assistance, housing relocation and stabilization, data collection, and administratioion.... Show more
This spending item is part of a $2,582,637 allocation.
See details
|
Housing and Urban Development, Department of / Community Planning and Development | 7/13/2009 |
JAMESTOWN PUBLIC SCHOOL FOUNDATION | $61,467 | Grant |
School Improvement Grants, Recovery Act Provide support to eligible schools that demonstrate the greatest need for the funds and the strongest commotment to use the funds to raise substantially the achievement of their students to enable those schools to make adequate yearly progress.
This spending item is part of a $7,631,521 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 12/03/2009 |
BEAR FARMS | $56,626 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/24/2010 |
Bob Bina | $54,497 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
REIMERS JT LLC | $53,624 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/02/2010 |
SCHRADER FARMS INC | $53,529 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/21/2010 |
Humes Landscaping | $53,505 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
REIMERS JOINT VENTURE | $52,019 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/11/2010 |
MULTIPLE RECIPIENTS | $50,774 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/30/2010 |
DARREL ENTZMINGER & SONS | $50,628 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/16/2010 |
T & C READEL FARMS INC | $49,388 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 7/13/2010 |
Pingree, City of | $46,305 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
REIMERS LAND CO | $46,148 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/18/2010 |
K FARMS INC | $46,037 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/02/2010 |
KLEINKNECHT FARMS INC | $46,037 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/02/2010 |
KARGES-FAULCONBRIDGE, INC. | $42,700 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Medina City Hall | $42,445 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
5 T FARMS INC | $42,380 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/20/2010 |
SCHINDLER ELEVATOR CORPORATION | $39,550 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
S & S FARMS INC | $37,836 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/22/2010 |
SJOSTROM AG SERVICE INC | $36,602 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/03/2010 |
TIRMAL LODGING LLC | $36,500 | Loan | 7(a) Loan Guarantees RURAL LENDER ADVANTAGE | Small Business Administration | 4/01/2010 |
TMD FARM INC | $35,978 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/17/2010 |
C G S FARMS PARTNERSHIP | $35,762 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/20/2010 |
CYFARM GENERAL PARTNERSHIP | $35,680 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/08/2010 |
GESS-HYE INC | $35,118 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/10/2010 |
JAMESTOWN COLLEGE | $35,053 | Direct P | Federal Work-Study Program CAMPUS-BASED /FWS | Education, Department of / DOED - Student Financial Assistance Programs | 4/01/2009 |
PINGREE BUCHANAN SCHOOL DISTRICT #10 | $35,027 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
Precision Results Manufacturing Inc. | $35,000 | Loan | America's Recovery Capital Loans ARC GUAR LOANS | Small Business Administration | 12/28/2009 |
MULTIPLE RECIPIENTS | $34,907 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 10/31/2010 |
GRESHIK FARMS | $34,568 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/11/2010 |
Kensal Public School District 19 | $33,994 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services. Education Stabilization funds were used to restore statete support for elementary and secon... Show more
This spending item is part of a $85,644,337 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 9/10/2009 |
JAMESTOWN PUBLIC SCHOOL FOUNDATION | $33,654 | Grant |
Education Technology State Grants, Recovery Act Educational Technology State Grants to States to improve student academic achievement through the innovative use and the effective integration of new and emerging technology with teacher training, curriculum development, and successful research-based ininst... Show more
This spending item is part of a $3,209,375 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 7/24/2009 |
MULTIPLE RECIPIENTS | $33,173 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 10/31/2010 |
FARGO GLASS AND PAINT COMPANY | $30,506 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
FLETCHER FARMS INC | $30,355 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/16/2010 |
CYSEWSKI FARMS INC | $30,181 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/08/2010 |
Frank Froehle Professional Car | $29,548 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
KENSAL PUBLIC SCHOOL DISTRICT # 19 | $28,899 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
MONTPELIER SCHOOL DISTRICT | $28,800 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) The purpose of the EECBG Program is to: reduce fossil fuel emissions, reduce total energy use, and improve energy efficiency. The funds will be used for: 1. An education campaign across the state to educate citizens about the benefits o of energy efficien... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of / Golden Field Office | 9/28/2009 |
PACE PAINTING | $27,400 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MONTPELIER SCHOOL DISTRICT | $26,968 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards
This spending item is part of a $27,437,105 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
R & D FARMS LTD | $26,780 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/18/2010 |
UNITED MEADOWS INC | $24,502 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/11/2010 |
DAKOTA FENCE COMPANY | $22,765 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMESTOWN PUBLIC SCHOOL FOUNDATION | $21,040 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a State's discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $861,549 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
MELAND LUMBER & MATERIAL CO. | $20,897 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
WIDSETH SMITH NOLTING & ASSOCIATES INC. | $20,809 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
REDLIN AND JOHNSON INSULATION INC | $19,112 | Contract |
Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
AVI Systems, Inc. | $18,737 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Certified Wood Products, Inc. | $18,335 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
WAHL FARM INC | $17,284 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/15/2010 |
Dakota Stone Design | $16,501 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
LEGLER FARMS INC | $16,325 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 10/15/2010 |
AMBERWAVES FARM INC | $13,623 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 3/31/2010 |
Northern Woodwork, Inc | $13,249 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMES RIVER SPECIAL EDUCATION COOPERATIVE | $12,703 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a State's discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $861,549 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 2/17/2009 |
MIDWEST TESTING LABORATORY, INC. | $12,000 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
B & L GORMAN | $11,434 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/15/2010 |
WOLF STEEL CONSTRUCTION INC | $10,143 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
YUKON ACRES | $9,978 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/16/2010 |
MODULAR SPACE CORPORATION | $9,425 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
JAMESTOWN COLLEGE | $8,121 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of | 5/06/2009 |
AUDREY BARNES REVOCABLE LIVING TRUST | $7,989 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/21/2010 |
BOOM CONCRETE, INC. | $7,770 | Contract | 1 - UNISEX PRECAST CONCRETE VAULT TOILET | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
MILLER BROS PTR | $6,214 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/15/2010 |
R & D FARMS LTD | $5,884 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 7/07/2010 |
DAUGS BROTHERS FARM | $5,766 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/24/2010 |
MULTIPLE RECIPIENTS | $5,750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2009 |
BOLLINGBERG BROTHERS | $5,452 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/08/2010 |
BRAUN INTERTEC CORPORATION | $5,189 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Missouri Basin Materials, LLC | $4,768 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Kevin Leroy Reuther | $4,451 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Interstate Spray Foam Insulation LLC | $4,373 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
BLACK DIRT INC | $4,214 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/15/2010 |
BLACK DIRT INC | $4,214 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/29/2011 |
Fleck's Furniture & Appliance, Inc. | $3,849 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
BALCO, INC. | $3,570 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MELAND LUMBER & MATERIAL CO. | $3,479 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Command Center, Inc. | $3,000 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
AMBERWAVES FARM INC | $2,981 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 10/21/2010 |
MULTIPLE RECIPIENTS | $2,600 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 3/31/2010 |
JOHN KROPP FAMILY TRUST | $2,451 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/27/2010 |
Dallmann Services Company | $2,425 | Contract |
Rebuild Crest Road, Pipestem Dam, Jamestown, ND. Reconstruction of existing asphalt roadway.
This spending item is part of a $432,000 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
ADVANCED BUSINESS METHODS, INC. | $2,250 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Concord Industries Inc | $2,100 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $2,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 3/31/2010 |
MULTIPLE RECIPIENTS | $1,750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2009 |
INDIGO SIGNWORKS INC | $1,421 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
HOUSE OF COLOR, INC. | $1,216 | Contract |
Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
BERGSTROM ELECTRIC, INC. | $1,200 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
Kansas Lumber Homestore, Inc. | $1,166 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
D.V. Fyre-TEC Inc | $1,119 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $1,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2010 |
MULTIPLE RECIPIENTS | $941 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 1/31/2011 |
GLENROY, INC. | $841 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $750 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2010 |
Dallmann Services Company | $700 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
MULTIPLE RECIPIENTS | $500 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2010 |
Consolidated Service Fleet Management LLC | $491 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
HAWKINS / MARGARET ESTATE | $256 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/03/2010 |
Prairie Supply, Inc. | $209 | Contract |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible)
This spending item is part of a $143,266 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 4/14/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible)
This spending item is part of a $160,737 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 4/15/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grant: Areas with Population equal to or less than 200K
This spending item is part of a $679,198 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 5/05/2009 |
KEPLIN-GRACON JV | $0 | Contract |
Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
TRANSPORTATION, NORTH DAKOTA DEPT OF | $0 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grants
This spending item is part of a $525,665 allocation.
See details
|
Transportation, Department of / Federal Highway Administration | 10/16/2009 |
KEPLIN-GRACON JV | $0 | Contract |
Add alternative energy feature to the design and construction to include but not limited to a geothermal system.
This spending item is part of a $298,000 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2010 |
MULTIPLE RECIPIENTS | $0 | Loan | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Agriculture, Department of / Rural Housing Service | 6/30/2010 |