Sherman County, Ore.
U.S. | Oregon | Sherman | |
---|---|---|---|
Population | 308,745,538 | 3,831,074 | 1,774 |
Total recovery funding | $522,082,377,600 | $6,993,964,142 | $15,361,384 |
Funding per Capita | $1,691 | $1,826 | $8,659 |
Unemployment
7/2008 |
6.2 |
6.2 |
5.6 |
7/2009 |
+3.6
9.8 |
+4.9
11.1 |
+2.1
7.7 |
7/2010 |
-0.2
9.6 |
-0.5
10.6 |
+0.1
7.8 |
7/2011 |
-0.6
9.0 |
-1.2
9.4 |
+0.7
8.5 |
7/2012 |
-0.9
8.1 |
-0.5
8.9 |
-0.5
8.0 |
This site was updated in September 2012. It includes recipient-reported data through the second quarter of 2012, which was released in July 2012.
Important: This interactive database is not kept up-to-date and should be treated as a historical snapshot. As records may have changed since we stopped making updates, researchers and consultants wishing to use the data should check against original sources for accuracy before using any data published here.
Those wishing to download the data can find it at the ProPublica Data Store.
Funding by Federal Agency and Department
Click total to see spending list | ||
---|---|---|
U.S. Army Corps of Engineers | $11,345,280 | |
Army, Department of | $2,411,568 | |
Energy, Department of | $548,000 | |
Agriculture, Department of | $465,769 | |
Education, Department of | $279,308 | |
Transportation, Department of | $191,959 | |
Social Security Administration | $119,500 |
Projects
Stimulus contracts, grants and loans in Sherman County, Ore.
Data last updated on September 2012.
We have CSV files available for download. Sign up here.
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
SLAYDEN CONSTRUCTION GROUP, INC. | $3,840,935 | Contract |
Demo fish weirs, install new weirs, install new fill actuated fill gates, electrical upgrades, install new counting station, misc. metals, walkways and handrails
This spending item is part of a $4,583,419 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
GLEN/MAR CONSTRUCTION, INC. | $2,398,968 | Contract | providing all labor, equipment, materials, parts, and incidentals for the dewatering, and flow deflector construction in bay 20. These activities include but are not limited to: fabrication, installation and removal of the stoplog guides for dewatering th | Army, Department of | 9/29/2009 |
KNIGHT CONST. & SUPPLY, INC. | $2,396,860 | Contract | Recovery Project #122744, John Day Dam Avian Predation Deterrent Array Phase II. Build (6)steel towers to carry over five miles of synthetic lines crossing the spillway area of the dam to successfully deter predatory birds from attacking fish smolt downst | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
SLAYDEN CONSTRUCTION GROUP, INC. | $1,485,886 | Contract |
Construction of a concrete spillway flow deflector at spillway no. 20 at the John Day Dam to reduce the effects of nitrogen narcosis in fish migrating downstream.
This spending item is part of a $2,348,968 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
CP CONSTRUCTION LLC | $941,819 | Contract | Paving and Road Construction | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
GLEN/MAR CONSTRUCTION, INC. | $863,082 | Contract |
Construction of a concrete spillway flow deflector at spillway no. 20 at the John Day Dam to reduce the effects of nitrogen narcosis in fish migrating downstream.
This spending item is part of a $2,348,968 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
I N C A & CH2M HILL JOINT VENTURE | $717,164 | Contract | TAS:96 3134:: TAS Recovery Project #::138171 John Day Lock & Dam North Fishway Ladder Auziliary Water Supply System plans and specifications | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |
GRANITE NORTHWEST, INC. | $618,939 | Contract |
LePage and Plymouth Park Paving at John Day Lock and Dam. Provide an asphalt concrete overlay for Plymouth Park campground and LePage Park campground.
This spending item is part of a $1,064,134 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
SHERMAN, COUNTY OF | $546,000 | Grant |
State Energy Program This award will be used to fund four separate market activities; Public Buildings retrofits, Private Industrial retrofits and Irrigation projects, private Biomass projects and Transportation activities. An estimated 200 energy efficiency and renewable ene
This spending item is part of a $42,182,000 allocation.
See details
|
Energy, Department of | 6/26/2009 |
KONNOWAC, LLC | $406,284 | Contract |
LePage and Plymouth Park Paving at John Day Lock and Dam. Provide an asphalt concrete overlay for Plymouth Park campground and LePage Park campground.
This spending item is part of a $1,064,134 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
SHERMAN COUNTY SCHOOL DISTRICT | $233,515 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund -- for the support of public elementary, secondary, and postsecondary education and, as applicable, early childhood education programs and services.
This spending item is part of a $466,461,533 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 4/28/2009 |
TRANSPORTATION, OREGON DEPARTMENT OF | $191,959 | Grant | Highway Planning and Construction I84: RUFUS-SWANSON CANYON | Transportation, Department of / Federal Highway Administration | 2/16/2010 |
MULTIPLE RECIPIENTS | $156,790 | Loan | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Agriculture, Department of / Rural Housing Service | 7/31/2010 |
MULTIPLE RECIPIENTS | $137,700 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture, Department of / Rural Housing Service | 8/31/2009 |
MULTIPLE RECIPIENTS | $119,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2009 |
SHERMAN COUNTY SCHOOL DISTRICT | $45,793 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $93,735,666 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 4/01/2009 |
RICK'S TRANSFER SERVICE, INC. | $35,400 | Contract | Dive safety inspector John Dayflow deflector | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/25/2009 |
SHERMAN, COUNTY OF | $32,000 | Grant |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Agriculture, Department of / Forest Service | 4/02/2009 |
SHERMAN, COUNTY OF | $32,000 | Grant |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Agriculture, Department of / Forest Service | 4/02/2009 |
SHERMAN, COUNTY OF | $32,000 | Grant |
Recovery Act of 2009: Capital Improvement and Maintenance The Oregon Youth Employment Initiative (OYEI) award has an overall purpose to: preserve and create jobs that promote economic recovery, assist those most impacted by the recession and to invest in environmental protection. The funds will provovide current ... Show more
This spending item is part of a $9,627,090 allocation.
See details
|
Agriculture, Department of / Forest Service | 4/02/2009 |
MULTIPLE RECIPIENTS | $27,063 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 3/31/2010 |
LANPACIFIC, INC. | $25,095 | Contract |
LePage and Plymouth Park Paving at John Day Lock and Dam. Provide an asphalt concrete overlay for Plymouth Park campground and LePage Park campground.
This spending item is part of a $1,064,134 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
CIRCLE R RANCH | $14,776 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 3/11/2010 |
S.D.S. LUMBER CO. | $12,600 | Contract | AS A PART OF CAR DESCRIPTION - TAS::96 3135::TAS RECOVERYPROJECT#::323857::RP# MOB/DEMOB JOHN DAY DAM BULKHEAD PLACEMENT | Army, Department of | 3/05/2010 |
Baer Testing & Consulting, Inc. | $12,282 | Contract |
LePage and Plymouth Park Paving at John Day Lock and Dam. Provide an asphalt concrete overlay for Plymouth Park campground and LePage Park campground.
This spending item is part of a $1,064,134 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
MULTIPLE RECIPIENTS | $9,294 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 2/28/2010 |
MULTIPLE RECIPIENTS | $8,296 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 6/30/2010 |
MULTIPLE RECIPIENTS | $4,865 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 4/30/2010 |
WIND CHASER RANCH INC | $4,505 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/29/2010 |
MULTIPLE RECIPIENTS | $3,300 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 11/30/2010 |
SHERMAN, COUNTY OF | $2,000 | Grant |
Renewable Energy Research and Development ARRA - Solar Market Transformation: Solar America Cities Special Projects
This spending item is part of a $400,000 allocation.
See details
|
Energy, Department of | 1/01/2010 |
MULTIPLE RECIPIENTS | $1,649 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/31/2010 |
A1 Straight Lines Striping Co | $1,534 | Contract |
LePage and Plymouth Park Paving at John Day Lock and Dam. Provide an asphalt concrete overlay for Plymouth Park campground and LePage Park campground.
This spending item is part of a $1,064,134 allocation.
See details
|
U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
HAY CANYON RANCH | $640 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/03/2010 |
DONALD D THOMPSON LIVING TRUST | $466 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 5/03/2010 |
BERGE RANCH | $298 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 9/29/2010 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 12/31/2010 |
MULTIPLE RECIPIENTS | $250 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 9/30/2009 |
MULTIPLE RECIPIENTS | $127 | Direct P | Supplemental Revenue Assistance Program Supplemental Revenue Assistance Payments (SURE) | Agriculture, Department of / Farm Service Agency | 8/31/2010 |
MULTIPLE RECIPIENTS | $0 | Loan | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Agriculture, Department of / Rural Housing Service | 7/31/2010 |