Minnehaha County, S.D., funds by Interior, Department of
Listing $3,175,770.83 in stimulus funds from Interior, Department of for Minnehaha
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
GUARANTEE ROOFING & SHEET METAL OF SOUTH DAKOTA, INC. | $2,404,914 |
Cheyenne Eagle Butte School Roof repair. The project consists of repairing and replacing roofing for the Eagle Butte High School in Eagle Butte, South Dakota. The school was built in 1950 and has gone through a number of roof replacements. The previous wo
This spending item is part of a $3,487,582 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/30/2010 |
HDR ENGINEERING, INC. | $322,411 | A&E redesign of existing heating, ventilating, and air conditioning (HVAC) system at EROS Mundt Bldg in Sioux Falls, SD. | Geological Survey | 5/26/2010 |
ARCHITECTURAL ROOFING & SHEETMETAL INC | $174,580 |
Design/Build services for removal of an existing ballasted EPDM (Ethylene-Propylene-Diene-Monomer) roof with a fully adhered PVC (Polyvinyl Chloride) roofing system located at EROS Science Center in Sioux Falls, SD. ARRA Project DM0053B
This spending item is part of a $281,687 allocation.
See details
|
Geological Survey | 6/03/2010 |
MACTEC ENGINEERING AND CONSULTING, INC. | $107,106 |
Design/Build services for removal of an existing ballasted EPDM (Ethylene-Propylene-Diene-Monomer) roof with a fully adhered PVC (Polyvinyl Chloride) roofing system located at EROS Science Center in Sioux Falls, SD. ARRA Project DM0053B
This spending item is part of a $281,687 allocation.
See details
|
Geological Survey | 6/03/2010 |
ARCHITECTURAL DESIGN WEST INC | $84,773 | design and replacement of an existing security booth and road replacement | Geological Survey | 3/26/2010 |
HANDER INC | $81,986 | Staged boiler with asbestos abatement | Geological Survey | 3/29/2010 |