Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Minnehaha County, S.D., funds by Interior, Department of

Listing $3,175,770.83 in stimulus funds from Interior, Department of for Minnehaha

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
GUARANTEE ROOFING & SHEET METAL OF SOUTH DAKOTA, INC. $2,404,914 Cheyenne Eagle Butte School Roof repair. The project consists of repairing and replacing roofing for the Eagle Butte High School in Eagle Butte, South Dakota. The school was built in 1950 and has gone through a number of roof replacements. The previous wo
This spending item is part of a $3,487,582 allocation. See details
Indian Affairs (Assistant Secretary) 3/30/2010
HDR ENGINEERING, INC. $322,411 A&E redesign of existing heating, ventilating, and air conditioning (HVAC) system at EROS Mundt Bldg in Sioux Falls, SD. Geological Survey 5/26/2010
ARCHITECTURAL ROOFING & SHEETMETAL INC $174,580 Design/Build services for removal of an existing ballasted EPDM (Ethylene-Propylene-Diene-Monomer) roof with a fully adhered PVC (Polyvinyl Chloride) roofing system located at EROS Science Center in Sioux Falls, SD. ARRA Project DM0053B
This spending item is part of a $281,687 allocation. See details
Geological Survey 6/03/2010
MACTEC ENGINEERING AND CONSULTING, INC. $107,106 Design/Build services for removal of an existing ballasted EPDM (Ethylene-Propylene-Diene-Monomer) roof with a fully adhered PVC (Polyvinyl Chloride) roofing system located at EROS Science Center in Sioux Falls, SD. ARRA Project DM0053B
This spending item is part of a $281,687 allocation. See details
Geological Survey 6/03/2010
ARCHITECTURAL DESIGN WEST INC $84,773 design and replacement of an existing security booth and road replacement Geological Survey 3/26/2010
HANDER INC $81,986 Staged boiler with asbestos abatement Geological Survey 3/29/2010