Hidalgo County, Texas, funds by State, Department of
Listing $107,903,676.73 in stimulus funds from State, Department of for Hidalgo
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BALLENGER CONSTRUCTION COMPANY | $19,643,481 | LOWER RIO GRAND FLOOD CONTROL PROJECT - INTERIOR FLOODWAYS. REHABILITAION OF NORTH FLOODWAY 1 AND ARROYO COLORADO 1 AND 2 FROM FM 1015 TO SOUTH RANCH RD. HIDALGO AND CAMERON COUNTIES, TEXAS | U.S. and Mexico International Boundary and Water Commission | 10/19/2009 |
LONGHORN EXCAVATORS, INC. | $16,118,860 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
G.R. BIRDWELL CONSTRUCTION, L.P. | $7,965,121 | Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II | U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
SER CONSTRUCTION, INCORPORATED | $7,163,392 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
SBBI, INC. | $7,100,173 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
S & B INFRASTRUCTURE, LTD | $5,356,908 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
S & B INFRASTRUCTURE, LTD | $5,187,089 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
MCALLEN CONSTRUCTION COMPANY | $4,098,059 | Provide all plant, labor & material for the construction of the Edinburg Pump Levee and Channel Crossing in Hidalgo County Texas | U.S. and Mexico International Boundary and Water Commission | 6/17/2010 |
Eberle Materials, Inc. | $2,404,013 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
G.R. BIRDWELL CONSTRUCTION, L.P. | $2,352,943 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
L&G ENGINEERING LABORATORY, L.L.C. | $2,098,025 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
L&G Engineering Laboratory, L.L.C. | $2,098,025 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
S & B INFRASTRUCTURE, LTD | $1,272,244 |
Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,515,509 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/17/2009 |
O.G. CONSTRUCTION COMPANY, LLC | $1,221,620 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
S & B INFRASTRUCTURE, LTD | $1,211,650 |
Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,454,915 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/17/2009 |
TETRA TECH, INC. | $1,169,649 | As part of TAS 19-1079-Construction Management Services for the Rehablitation of the North Floodway Levees Phase 1 & 2 and the Arroyo Colorado Floodway Levees Phase 1 & 1 in the Lower Rio Grande Flood Control Project. Tasks to be completed include: 1) Att | U.S. and Mexico International Boundary and Water Commission | 11/05/2009 |
359 Incorporated | $1,138,195 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
Peed Equipment Company | $1,083,092 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
TETRA TECH, INC. | $884,304 | As part of TAS 19-1079-Construction management/assistance services during the rehabilitation of approximately 41.3 miles of main floodway levees located in the lower Rio Grande Valley, between McAllen and Weslaco, in Hidalgo County, Texas. The main functi | U.S. and Mexico International Boundary and Water Commission | 10/16/2009 |
S & B INFRASTRUCTURE, LTD | $833,524 |
Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $926,705 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/20/2009 |
Eberle Materials, Inc. | $824,281 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
TETRA TECH, INC. | $813,472 |
As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 3/11/2010 |
PHILLIPS AND JORDAN, INCORPORATED | $799,054 |
Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal
This spending item is part of a $1,060,187 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 7/24/2009 |
S & B INFRASTRUCTURE, LTD | $743,465 |
Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $836,646 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/20/2009 |
Salinas Engineering Corporation | $653,416 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
S & B INFRASTRUCTURE, LTD | $638,971 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
URS GROUP, INC. | $610,205 | RECOVERY - Provide Construction Management/assistance services for Hidalgo Loop Levees, Phases I and II, Hidalgo County, TX. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation. | U.S. and Mexico International Boundary and Water Commission | 12/01/2009 |
DOS LAND SURVEYING LLC | $606,916 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
DOS LAND SURVEYING LLC | $606,916 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
TETRA TECH, INC. | $569,430 | As part of TAS 19-1079-Construction Management Services for Lateral A to Retamal Dam River Levee plus Retamal Dike-This proposed levee rehabilitation improvement project consists of: 1) Increasing top-of-levee elevations, maintaining minimum side slope, a | U.S. and Mexico International Boundary and Water Commission | 1/19/2010 |
RABA-KISTNER CONSULTANTS, INC | $466,912 |
The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa
This spending item is part of a $658,661 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/09/2009 |
TETRA TECH, INC. | $458,689 | As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING LEVEE REHABILITATION IMPROVEMENTS OF THE EDINBURG PUMP LEVEE AND CHANNEL CROSSING PROJECT) -The United States Section of the International Boundary and Water Commission (USIBWC) is in the pro | U.S. and Mexico International Boundary and Water Commission | 7/15/2010 |
Rods Surveying Inc | $438,187 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
Rods Surveying Inc | $438,187 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
TRC ENVIRONMENTAL CORPORATION | $396,241 | Rio Grande Canalization Project River Restoration Implementation Plan | U.S. and Mexico International Boundary and Water Commission | 5/20/2010 |
TETRA TECH, INC. | $377,351 |
The proposed work for levee improvements consists of design of a retaining wall along the length of the landside of the levee for approximately 2.9 miles, to reestablish a ten foot maintenance road that adjoins the levee and the United Irriation District
This spending item is part of a $464,551 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/04/2010 |
TAMEZ-PEARSON CONSTRUCTION INC | $363,006 |
Mission Levee Improvements. (1) Improve levee, install retaining walls and furnish/install automatic flood gate at Bentsen Palm Drive: 1 ea automatic flood gate; 5790 cy soils; 278 cy concrete; 790 sy asphalt paving. (2) Improve levee and install new slui
This spending item is part of a $2,769,269 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/03/2010 |
HEAVY DUTY PRESSURE WASHING LLC | $322,790 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Environmental Allies Gp, Inc. | $308,247 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Rgv Alliance Construction Corp | $287,944 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
INUIT SERVICES, INC. | $261,132 |
Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal
This spending item is part of a $1,060,187 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 7/24/2009 |
Millennium Engineers Group | $258,029 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
TERRACON CONSULTANTS, INC. | $254,981 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
J E SAENZ & ASSOCIATES INC | $254,723 |
Civil Redesign of North Floodway North and South Levees from FM 1425 in Hidalgo County, Texas, East 27 Miles to the End of Levee, including Geotechnical Investigation and Surveying Services.
This spending item is part of a $4,071,347 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/16/2010 |
Floodbreak LLC | $224,023 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
S & B INFRASTRUCTURE, LTD | $214,700 |
Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet
This spending item is part of a $612,066 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/23/2009 |
Krenmueller Farms | $202,500 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
DOS LOGISTICS, INC. | $200,528 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
DOS LOGISTICS, INC. | $200,528 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
S & B INFRASTRUCTURE, LTD | $191,749 |
The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa
This spending item is part of a $658,661 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/09/2009 |
ANCHOR GROUP INC, THE | $190,954 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
H2o Construction Services, Inc. | $178,062 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
S & B INFRASTRUCTURE, LTD | $176,327 | Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple | U.S. and Mexico International Boundary and Water Commission | 8/19/2009 |
S & B INFRASTRUCTURE, LTD | $176,327 | Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple | U.S. and Mexico International Boundary and Water Commission | 8/19/2009 |
TRC ENVIRONMENTAL CORPORATION | $174,580 | Environmental Assessment and Cultural Resources Survey(s) of the levee rehabilitation project for Arroyo Colorado south levee in Cameron and Hidalgo Counties, TX. | U.S. and Mexico International Boundary and Water Commission | 1/29/2010 |
Millennium Engineers Group | $172,800 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
TERRACON CONSULTANTS, INC. | $168,680 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
REGIONAL CITIES SERVICES | $156,035 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
JONES ENVIRONMENTAL DRILLING INC | $154,330 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
Jones Environmental Drilling Inc | $154,330 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
GNI WATERMAN LLC | $152,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Soil-Tech, Inc. | $142,195 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
Valley Trimming Tree Experts | $138,031 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Ioc Company, LLC | $135,001 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
TSI LABORATORIES, INC. | $130,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
VALLEY DATA COLLECTION SPECIALIST INC | $129,883 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
Valley Data Collection Specialist Inc | $128,666 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
TSI LABORATORIES, INC. | $128,110 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
"earthwise Organics, Inc." | $126,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
MELDEN & HUNT, INC. | $118,481 |
As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 3/11/2010 |
Gbi Partners, L.P. | $105,000 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
TEMPS PLUS LLC | $100,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
DOS LAND SURVEYING LLC | $93,181 |
Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $926,705 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/20/2009 |
DOS LAND SURVEYING LLC | $93,181 |
Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $836,646 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/20/2009 |
S & B INFRASTRUCTURE, LTD | $91,941 | The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of | U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
S & B INFRASTRUCTURE, LTD | $91,721 | The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of | U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
EXPRESS SERVICES, INC. | $87,435 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
RODS SURVEYING INC | $81,226 |
Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/09/2009 |
MWH AMERICAS, INC. | $77,093 | Environmental sampling and testing on the Main Floodway in the Donna Main Canal Area. | U.S. and Mexico International Boundary and Water Commission | 10/27/2009 |
Valley Garden Center, Inc. | $68,933 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Salinas Engineering Corporation | $67,955 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
Mission Paving Company, Inc. | $61,069 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |
URS GROUP, INC. | $60,270 |
Mission Levee construction inspection services for earthen levee.
This spending item is part of a $330,995 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/01/2010 |
AEC ENGINEERING LLC | $47,168 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
S & B INFRASTRUCTURE, LTD | $46,266 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
Dos Land Surveying LLC | $44,800 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
Eberle Materials, Inc. | $40,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Rods Aerial Mapping, LLC | $37,960 |
Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/09/2009 |
G.R. BIRDWELL CONSTRUCTION, L.P. | $35,000 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
MELDEN & HUNT, INC. | $32,760 |
As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 3/11/2010 |
S & B INFRASTRUCTURE, LTD | $30,311 |
The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project
This spending item is part of a $33,158 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/17/2009 |
Garcia & Associates | $30,000 |
Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/21/2009 |
S & B INFRASTRUCTURE, LTD | $26,460 |
Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/09/2009 |
L&G ENGINEERING LABORATORY, L.L.C. | $25,049 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
DOS LAND SURVEYING LLC | $8,320 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
RODS SURVEYING INC | $2,847 |
The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project
This spending item is part of a $33,158 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/17/2009 |
Eberle Materials, Inc. | $0 |
Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
S & B INFRASTRUCTURE, LTD | $0 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
SBBI, INC. | $0 |
Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 10/28/2009 |