Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
BALLENGER CONSTRUCTION COMPANY $19,643,481 LOWER RIO GRAND FLOOD CONTROL PROJECT - INTERIOR FLOODWAYS. REHABILITAION OF NORTH FLOODWAY 1 AND ARROYO COLORADO 1 AND 2 FROM FM 1015 TO SOUTH RANCH RD. HIDALGO AND CAMERON COUNTIES, TEXAS U.S. and Mexico International Boundary and Water Commission 10/19/2009
LONGHORN EXCAVATORS, INC. $16,118,860 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
G.R. BIRDWELL CONSTRUCTION, L.P. $7,965,121 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II U.S. and Mexico International Boundary and Water Commission 10/28/2009
SER CONSTRUCTION, INCORPORATED $7,163,392 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
SBBI, INC. $7,100,173 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
S & B INFRASTRUCTURE, LTD $5,356,908 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
S & B INFRASTRUCTURE, LTD $5,187,089 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
MCALLEN CONSTRUCTION COMPANY $4,098,059 Provide all plant, labor & material for the construction of the Edinburg Pump Levee and Channel Crossing in Hidalgo County Texas U.S. and Mexico International Boundary and Water Commission 6/17/2010
Eberle Materials, Inc. $2,404,013 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
G.R. BIRDWELL CONSTRUCTION, L.P. $2,352,943 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
L&G ENGINEERING LABORATORY, L.L.C. $2,098,025 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
L&G Engineering Laboratory, L.L.C. $2,098,025 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
S & B INFRASTRUCTURE, LTD $1,272,244 Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,515,509 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2009
O.G. CONSTRUCTION COMPANY, LLC $1,221,620 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
S & B INFRASTRUCTURE, LTD $1,211,650 Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,454,915 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2009
TETRA TECH, INC. $1,169,649 As part of TAS 19-1079-Construction Management Services for the Rehablitation of the North Floodway Levees Phase 1 & 2 and the Arroyo Colorado Floodway Levees Phase 1 & 1 in the Lower Rio Grande Flood Control Project. Tasks to be completed include: 1) Att U.S. and Mexico International Boundary and Water Commission 11/05/2009
359 Incorporated $1,138,195 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
Peed Equipment Company $1,083,092 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
TETRA TECH, INC. $884,304 As part of TAS 19-1079-Construction management/assistance services during the rehabilitation of approximately 41.3 miles of main floodway levees located in the lower Rio Grande Valley, between McAllen and Weslaco, in Hidalgo County, Texas. The main functi U.S. and Mexico International Boundary and Water Commission 10/16/2009
S & B INFRASTRUCTURE, LTD $833,524 Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $926,705 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/20/2009
Eberle Materials, Inc. $824,281 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
TETRA TECH, INC. $813,472 As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation. See details
U.S. and Mexico International Boundary and Water Commission 3/11/2010
PHILLIPS AND JORDAN, INCORPORATED $799,054 Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal
This spending item is part of a $1,060,187 allocation. See details
U.S. and Mexico International Boundary and Water Commission 7/24/2009
S & B INFRASTRUCTURE, LTD $743,465 Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $836,646 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/20/2009
Salinas Engineering Corporation $653,416 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
S & B INFRASTRUCTURE, LTD $638,971 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
URS GROUP, INC. $610,205 RECOVERY - Provide Construction Management/assistance services for Hidalgo Loop Levees, Phases I and II, Hidalgo County, TX. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation. U.S. and Mexico International Boundary and Water Commission 12/01/2009
DOS LAND SURVEYING LLC $606,916 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
DOS LAND SURVEYING LLC $606,916 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
TETRA TECH, INC. $569,430 As part of TAS 19-1079-Construction Management Services for Lateral A to Retamal Dam River Levee plus Retamal Dike-This proposed levee rehabilitation improvement project consists of: 1) Increasing top-of-levee elevations, maintaining minimum side slope, a U.S. and Mexico International Boundary and Water Commission 1/19/2010
RABA-KISTNER CONSULTANTS, INC $466,912 The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa
This spending item is part of a $658,661 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/09/2009
TETRA TECH, INC. $458,689 As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING LEVEE REHABILITATION IMPROVEMENTS OF THE EDINBURG PUMP LEVEE AND CHANNEL CROSSING PROJECT) -The United States Section of the International Boundary and Water Commission (USIBWC) is in the pro U.S. and Mexico International Boundary and Water Commission 7/15/2010
Rods Surveying Inc $438,187 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
Rods Surveying Inc $438,187 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
TRC ENVIRONMENTAL CORPORATION $396,241 Rio Grande Canalization Project River Restoration Implementation Plan U.S. and Mexico International Boundary and Water Commission 5/20/2010
TETRA TECH, INC. $377,351 The proposed work for levee improvements consists of design of a retaining wall along the length of the landside of the levee for approximately 2.9 miles, to reestablish a ten foot maintenance road that adjoins the levee and the United Irriation District
This spending item is part of a $464,551 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/04/2010
TAMEZ-PEARSON CONSTRUCTION INC $363,006 Mission Levee Improvements. (1) Improve levee, install retaining walls and furnish/install automatic flood gate at Bentsen Palm Drive: 1 ea automatic flood gate; 5790 cy soils; 278 cy concrete; 790 sy asphalt paving. (2) Improve levee and install new slui
This spending item is part of a $2,769,269 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/03/2010
HEAVY DUTY PRESSURE WASHING LLC $322,790 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Environmental Allies Gp, Inc. $308,247 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Rgv Alliance Construction Corp $287,944 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
INUIT SERVICES, INC. $261,132 Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal
This spending item is part of a $1,060,187 allocation. See details
U.S. and Mexico International Boundary and Water Commission 7/24/2009
Millennium Engineers Group $258,029 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
TERRACON CONSULTANTS, INC. $254,981 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
J E SAENZ & ASSOCIATES INC $254,723 Civil Redesign of North Floodway North and South Levees from FM 1425 in Hidalgo County, Texas, East 27 Miles to the End of Levee, including Geotechnical Investigation and Surveying Services.
This spending item is part of a $4,071,347 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/16/2010
Floodbreak LLC $224,023 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009
S & B INFRASTRUCTURE, LTD $214,700 Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet
This spending item is part of a $612,066 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/23/2009
Krenmueller Farms $202,500 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
DOS LOGISTICS, INC. $200,528 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
DOS LOGISTICS, INC. $200,528 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
S & B INFRASTRUCTURE, LTD $191,749 The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa
This spending item is part of a $658,661 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/09/2009
ANCHOR GROUP INC, THE $190,954 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
H2o Construction Services, Inc. $178,062 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
S & B INFRASTRUCTURE, LTD $176,327 Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple U.S. and Mexico International Boundary and Water Commission 8/19/2009
S & B INFRASTRUCTURE, LTD $176,327 Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple U.S. and Mexico International Boundary and Water Commission 8/19/2009
TRC ENVIRONMENTAL CORPORATION $174,580 Environmental Assessment and Cultural Resources Survey(s) of the levee rehabilitation project for Arroyo Colorado south levee in Cameron and Hidalgo Counties, TX. U.S. and Mexico International Boundary and Water Commission 1/29/2010
Millennium Engineers Group $172,800 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
TERRACON CONSULTANTS, INC. $168,680 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
REGIONAL CITIES SERVICES $156,035 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
JONES ENVIRONMENTAL DRILLING INC $154,330 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
Jones Environmental Drilling Inc $154,330 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
GNI WATERMAN LLC $152,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Soil-Tech, Inc. $142,195 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009
Valley Trimming Tree Experts $138,031 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Ioc Company, LLC $135,001 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
TSI LABORATORIES, INC. $130,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
VALLEY DATA COLLECTION SPECIALIST INC $129,883 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
Valley Data Collection Specialist Inc $128,666 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/02/2009
TSI LABORATORIES, INC. $128,110 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009
"earthwise Organics, Inc." $126,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
MELDEN & HUNT, INC. $118,481 As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation. See details
U.S. and Mexico International Boundary and Water Commission 3/11/2010
Gbi Partners, L.P. $105,000 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
TEMPS PLUS LLC $100,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
DOS LAND SURVEYING LLC $93,181 Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $926,705 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/20/2009
DOS LAND SURVEYING LLC $93,181 Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
This spending item is part of a $836,646 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/20/2009
S & B INFRASTRUCTURE, LTD $91,941 The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of U.S. and Mexico International Boundary and Water Commission 4/02/2009
S & B INFRASTRUCTURE, LTD $91,721 The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of U.S. and Mexico International Boundary and Water Commission 4/02/2009
EXPRESS SERVICES, INC. $87,435 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
RODS SURVEYING INC $81,226 Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/09/2009
MWH AMERICAS, INC. $77,093 Environmental sampling and testing on the Main Floodway in the Donna Main Canal Area. U.S. and Mexico International Boundary and Water Commission 10/27/2009
Valley Garden Center, Inc. $68,933 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Salinas Engineering Corporation $67,955 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009
Mission Paving Company, Inc. $61,069 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009
URS GROUP, INC. $60,270 Mission Levee construction inspection services for earthen levee.
This spending item is part of a $330,995 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/01/2010
AEC ENGINEERING LLC $47,168 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
S & B INFRASTRUCTURE, LTD $46,266 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
Dos Land Surveying LLC $44,800 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
Eberle Materials, Inc. $40,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Rods Aerial Mapping, LLC $37,960 Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/09/2009
G.R. BIRDWELL CONSTRUCTION, L.P. $35,000 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
MELDEN & HUNT, INC. $32,760 As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
This spending item is part of a $1,842,246 allocation. See details
U.S. and Mexico International Boundary and Water Commission 3/11/2010
S & B INFRASTRUCTURE, LTD $30,311 The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project
This spending item is part of a $33,158 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/17/2009
Garcia & Associates $30,000 Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
This spending item is part of a $24,976,249 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/21/2009
S & B INFRASTRUCTURE, LTD $26,460 Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00
This spending item is part of a $145,646 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/09/2009
L&G ENGINEERING LABORATORY, L.L.C. $25,049 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
DOS LAND SURVEYING LLC $8,320 Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $79,635 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
RODS SURVEYING INC $2,847 The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project
This spending item is part of a $33,158 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/17/2009
Eberle Materials, Inc. $0 Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
This spending item is part of a $18,400,465 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
S & B INFRASTRUCTURE, LTD $0 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
SBBI, INC. $0 Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
This spending item is part of a $7,571,847 allocation. See details
U.S. and Mexico International Boundary and Water Commission 10/28/2009