Loudoun County, Va., funds by Interior, Department of
Listing $9,681,417.43 in stimulus funds from Interior, Department of for Loudoun
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SUTRON CORPORATION | $3,684,407 | High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | Geological Survey | 6/05/2009 |
SUTRON CORPORATION | $3,684,407 | High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | Geological Survey | 6/05/2009 |
SUTRON CORPORATION | $844,226 | HIGH DATA RATE GOES DATA COLLECTION PLATFORM EQUIPMENT | Geological Survey | 4/08/2010 |
SUTRON CORPORATION | $650,566 | HIGH DATA RATE GOES DATA COLLECTION PLATFORMS | Geological Survey | 6/29/2010 |
SUTRON CORPORATION | $429,693 | DATA COLLECTION EQUIPMENT | Geological Survey | 3/30/2010 |
FEDERAL CONTRACTORS INC | $199,656 | Upgrade Sanitary Sewer Lift Stations,Turkey Run Park, George Washington Memorial Parkway, Arlington, VA | National Park Service | 5/07/2010 |
SASAKI ASSOCIATES INC | $78,790 | Field investingations of the existing piles of the Lincoln Memorial Reflecting Pool, West Potomac Park, Washington DC, to determin their condition. A written report on completion of field work. | National Park Service | 12/17/2009 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $42,885 |
Provide labor, materials, equipment, and travel necessary to provide comprehensive A&E design services to complete; Vegetation removal; foundation; waterproofing; loading dock modifications; ADA upgrades to include--building entrances; parking, warlways,
This spending item is part of a $152,500 allocation.
See details
|
National Park Service | 9/02/2009 |
RICHCON FEDERAL CONTRACTORS, INC. | $42,781 | Various repairs to facilities around Battlefeild Park Richmond Area Virginia HVAC Electrical, Plumbing, Flooring | National Park Service | 11/12/2009 |
SUTRON CORPORATION | $13,890 | CONSISTS OF SUTRON PART #9210-SL2-2B AND SUTRON PART #8080-0003-1 - XLITE DATALOGGER WITH SATLINK2 GOES TRANSMITTER | Geological Survey | 8/13/2009 |
INTELLIGENT DECISIONS, INC. | $5,320 | Order for 14 24 Monitors | Geological Survey | 4/09/2010 |
INTELLIGENT DECISIONS, INC. | $3,420 | ARRA Award for Monitors | Geological Survey | 4/13/2010 |
INTELLIGENT DECISIONS, INC. | $688 | TAS, FFS# R4AA, PROJ# 97110122, MONITORS | U.S. Fish and Wildlife Service | 8/31/2010 |
INTELLIGENT DECISIONS, INC. | $688 | TAS, FFS# R4AA, PROJ# 97110122, MONITORS | U.S. Fish and Wildlife Service | 8/31/2010 |