Big Horn County, Wyo., funds by Interior, Department of
Listing $250,207.90 in stimulus funds from Interior, Department of for Big Horn
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PARK CONSTRUCTION COMPANY | $198,379 |
Rebuilding 1.5 miles of Red Gulch Road by; testing the existing soil, engineering an approach to stabilize the top 6 inches of road base, reshaping the road and ditches, mixing the stabilizer into the soil within the travelway and compacting the soil to a
This spending item is part of a $240,202 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/01/2010 |
URS GROUP, INC. | $41,823 |
Rebuilding 1.5 miles of Red Gulch Road by; testing the existing soil, engineering an approach to stabilize the top 6 inches of road base, reshaping the road and ditches, mixing the stabilizer into the soil within the travelway and compacting the soil to a
This spending item is part of a $240,202 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/01/2010 |
SHELL VALLEY CONSULTING ASSOCIATES INC | $10,006 |
The U.S. Department of the Interior, Bureau of Land Management (BLM) requires contractor support services to complete an RMP and EIS/EA for the Rawlins, Pinedale, Kemmerer, Casper, Newcastle and Rock Springs Field Offices. The BLM will use an enviromenta
This spending item is part of a $898,425 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |