S.491: A bill to reinstate and extend the deadline for commencement of construction of a hydroelectric project involving Clark Canyon Dam.
About This Bill
- Introduced March 2, 2017
- Latest Major Action June 8, 2017
- See the one similar bills introduced in other congresses.
Bill Sponsor
Bill Cosponsors
3 (1 Democrat, 2 Republicans)
Bill Versions
- Reported to Senate - June 8, 2017
- Introduced in Senate - March 2, 2017
Bill Summary
(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Clark Canyon Dam Hydroelectric Project located on the Beaverhead River in Beaverhead County, Montana. Additionally, FERC may reinstate the construction license if it is expired.
(Source: Library of Congress)
What Lawmakers Are Saying About This Bill
Congressional Budget Office Estimate
Bill Actions
Date | Description |
---|---|
June 8, 2017 |
Placed on Senate Legislative Calendar under General Orders. Calendar No. 131.
|
June 8, 2017 |
Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. With written report No. 115-101.
|
March 30, 2017 |
Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.
|
March 2, 2017 |
Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S1579; text of measure as introduced: CR S1580)
|
March 2, 2017 |
Introduced in the Senate by Steve Daines (R-Mont.) |