Illinois • IL-10 Congressional District
Top 10 Largest Contracts
M L KING DR/22ND ST TO 0.3 MI W OF US 41 (... | IL / Lake |
$3,088,689
|
ILL 120 TO 0.2 MI S OF ILL 137 (Federal ID... | IL / Lake |
$2,682,793
|
CONSTRUCTION ENGINEERING FOR WILMOT ROAD W... | IL / Lake |
$2,292,645
|
E OF ILL 21 (MILWAUKEE AVE) TO W OF I-94 (... | IL / Lake |
$1,145,733
|
DES PLAINES RIVER (Federal ID: 0352010) | IL / Lake |
$606,125
|
CONSTRUCTION ENGINEERING FOR WILMOT ROAD W... | IL / Lake |
$84,960
|
Total # Projects: | 13 |
Total # Contracts: | 6 |
Total $ Projects: | $16,584,649 |
Total $ Contracts: | $9,900,945 |
Congressmembers
- Sen. Richard J. Durbin (D) See Campaign Finances
- Rep. Mark Steven Kirk (R) See Campaign Finances
- Sen. Roland W. Burris (D) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
IL-01 | $26,594,485 |
IL-02 | $82,090,317 |
IL-03 | $17,070,912 |
IL-04 | $1,538,505 |
IL-05 | $9,862,114 |
IL-06 | $4,678,647 |
IL-07 | $27,016,520 |
IL-08 | $31,100,752 |
IL-09 | $18,533,615 |
IL-11 | $53,872,007 |
IL-12 | $26,922,107 |
IL-13 | $23,664,913 |
IL-14 | $30,739,642 |
IL-15 | $78,826,601 |
IL-16 | $22,973,806 |
IL-17 | $64,647,132 |
IL-18 | $54,466,932 |
IL-19 | $56,024,035 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for IL-10. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
E OF ILL 21 (MILWAUKEE AVE) TO W OF I-94 (TRI-STATE TOLLWAY) (Federal ID: 0335012) | CURRAN CONTRACTING CO | Lake | Pavement Improvement | $1,145,733 |
DES PLAINES RIVER (Federal ID: 0352010) | SJOSTROM & SONS INC | Lake | Bridge Improvement | $606,125 |
M L KING DR/22ND ST TO 0.3 MI W OF US 41 (Federal ID: 0352012) | CURRAN CONTRACTING CO | Lake | Pavement Improvement | $3,088,689 |
ILL 120 TO 0.2 MI S OF ILL 137 (Federal ID: 2711016) | CURRAN CONTRACTING CO | Lake | Pavement Improvement | $2,682,793 |
CONSTRUCTION ENGINEERING FOR WILMOT ROAD WIDENING AND RESURFACING, IN DEERFIELD, SECTION 07-00080-00-WR (Federal ID: 8003870) | GEWALT HAMILTON ASSOC., INC. | Lake | Pavement Improvement | $84,960 |
CONSTRUCTION ENGINEERING FOR WILMOT ROAD WIDENING AND RESURFACING, IN DEERFIELD, SECTION 07-00080-00-WR (Federal ID: 8003870) | A LAMP CONC CONTRACTORS INC | Lake | Pavement Improvement | $2,292,645 |
CONSTRUCT PREFABRICATED PEDESTRIAN BRIDGE OVER BUFFALO CREEK & CONSTRUCT SHARED USE PATH BETWEEN DUNDEE RD. AND GLENDALE RD. IN THE VILLAGE OF WHEELING 06-00069-00-BR (Federal ID: 00D1691) | No Contractor | Cook | Transportation Enhancements | $368,060 |
ILL 21 TO STATE MARY'S RD (Federal ID: 1238010) | No Contractor | Lake | Pavement Improvement | $700,000 |
GAGES LANE TO IL 60 (Federal ID: 2706103) | No Contractor | Lake | Pavement Improvement | $1,340,000 |
RESURFACE FAU 1297 (10TH ST / WILMETTE AVE) FROM SHERIDAN RD TO LAKE AVE IN WILMETTE IN COOK COUNTY. (Federal ID: 9003305) | No Contractor | Cook | Pavement Improvement | $360,000 |
VARIOUS REPAIRS TO THE SUPERSTRUCTURE OF THE STRUCTURE CARRYING OLD WILLOW RD OVER THE MIDDLE FORK OF THE NORTH BRANCH OF THE CHICAGO RIVER IN THE VILLAGE OF NORTHFIELD, SECTION 09-00048-00-BR (Federal ID: 9003307) | No Contractor | Cook | Bridge Improvement | $100,000 |
RESURFACE FAU 2744 (GREEN BAY RD) FROM PARK AVE TO SCOTT AVE IN GLENCOE IN COOK COUNTY. (Federal ID: 9003368) | No Contractor | Cook | Pavement Improvement | $608,000 |
RESURFACING OF TOWER RD FROM HIBBARD RD TO SHERIDAN RD WXCLUDING GREN BAY RD AND SHERIDAN RD INTERSECTIONS IN WINNETKA, SECTION 09-00104-00-RS (Federal ID: 9003374) | No Contractor | Cook | Pavement Improvement | $420,000 |
PCC PAVEMENT PATCHING, HMA OVERLAY AND AGGREGATE SHOULDER REHAB, NEW PIPE UNDERDRAINS, SIDEWALK REMOVAL AND REPLACEMENT (Federal ID: 9003420) | No Contractor | Cook | Pavement Improvement | $3,780,000 |