Illinois • IL-19 Congressional District
Top 10 Largest Contracts
UNDER ILL 162 (Federal ID: 000S658) | IL / Madison |
$23,503,492
|
LOVERS LN NEAR WCL OF HARRISBURG TO ECL (F... | IL / Saline |
$14,121,445
|
UNDER ILL 162 (Federal ID: 0209019) | IL / Madison |
$2,500,000
|
ILL 16 TO EFFINGHAM CO LINE (Federal ID: 0... | IL / Shelby |
$2,100,201
|
0.4 MI E OF ILL 147 TO POPE CO LINE (Feder... | IL / Johnson |
$1,538,957
|
ILL 146 TO 3.5 MI N (Federal ID: 0132130) | IL / Pope |
$992,628
|
GIBSON ST TO SINGER AVE IN NOKOMIS INCLUDI... | IL / Montgomery |
$943,914
|
0.1 MI E OF BRUBAKER CREEK TRIB TO METCALF... | IL / Marion |
$756,844
|
RESURFACING OF COUNTY HIGHWAY 32 FROM JEFF... | IL / Marion |
$633,060
|
RECONSTRUCTION OF CH 6 FROM GILA TO THE EM... | IL / Jasper |
$299,807
|
Total # Projects: | 33 |
Total # Contracts: | 20 |
Total $ Projects: | $56,024,035 |
Total $ Contracts: | $47,963,180 |
Congressmembers
- Sen. Richard J. Durbin (D) See Campaign Finances
- Rep. John Shimkus (R) See Campaign Finances
- Sen. Roland W. Burris (D) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
IL-01 | $26,594,485 |
IL-02 | $82,090,317 |
IL-03 | $17,070,912 |
IL-04 | $1,538,505 |
IL-05 | $9,862,114 |
IL-06 | $4,678,647 |
IL-07 | $27,016,520 |
IL-08 | $31,100,752 |
IL-09 | $18,533,615 |
IL-10 | $16,584,649 |
IL-11 | $53,872,007 |
IL-12 | $26,922,107 |
IL-13 | $23,664,913 |
IL-14 | $30,739,642 |
IL-15 | $78,826,601 |
IL-16 | $22,973,806 |
IL-17 | $64,647,132 |
IL-18 | $54,466,932 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for IL-19. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
GIBSON ST TO SINGER AVE IN NOKOMIS INCLUDING SPRUCE; MADISON ST TO ILL 16 (Federal ID: 000S646) | ILLINOIS VALLEY PAVING CO | Montgomery | Pavement Improvement | $943,914 |
UNDER ILL 162 (Federal ID: 000S658) | THIEMS CONSTRUCTION CO INC | Madison | Pavement Improvement | $23,503,492 |
BRIDGE REPLACEMENT OF THE STRUCTURE OVER SAND RIDGE ROAD OVER LOST CREEK SOUTH OF FERRIN SECTION 03-10115-00-BR (Federal ID: 0027038) | DEPEW AND OWEN BUILDERS INC | Clinton | Bridge Replacement | $50,000 |
ILL 146 TO 3.5 MI N (Federal ID: 0132130) | SOUTHERN ILLINOIS ASPHALT CO | Pope | Pavement Improvement | $992,628 |
UNDER ILL 162 (Federal ID: 0209019) | SCI ENGINEERING, INC. | Madison | Other | $2,500,000 |
HUMBERT RD (Federal ID: 0310130) | RCS CONSTRUCTION INC | Madison | Pavement Widening | $0 |
0.1 MI E OF BRUBAKER CREEK TRIB TO METCALF RD (Federal ID: 0327043) | HOWELL ASPHALT CO & HOWELL PAV | Marion | Pavement Improvement | $756,844 |
LOVERS LN NEAR WCL OF HARRISBURG TO ECL (Federal ID: 0331048) | GEORGE E JONES EXCAVATING LLC | Saline | New Construction | $14,121,445 |
RECONSTRUCTION OF CH 6 FROM GILA TO THE EMBARRAS RIVER SECTIONS 06-00105-00-FP & 06-00107-00-FP (Federal ID: 0704138) | MT CARMEL STABILIZATION GP INC | Jasper | Pavement Improvement | $299,807 |
ILL 16 TO EFFINGHAM CO LINE (Federal ID: 0766005) | HOWELL ASPHALT CO & HOWELL PAV | Shelby | Pavement Improvement | $2,100,201 |
PRELIMINARY ENGINEERING FOR A STRUCTURE REPLACEMENT OVER LAWS CREEK EAST OF INGRAM IN CLAY COUNTY. SECTION 09-00082-00-BR (Federal ID: 0801230) | RHUTASEL & ASSOC., INC. | Clay | Other | $47,000 |
0.4 MI E OF ILL 147 TO POPE CO LINE (Federal ID: 0885040) | SOUTHERN ILLINOIS ASPHALT CO | Johnson | Pavement Improvement | $1,538,957 |
COUNTY HIGHWAY 3 FROM WILSON ROAD NORTH TO IL 141 SOUTHWEST OF NEW HAVEN (Federal ID: 0888122) | E T SIMONDS CONSTRUCTION CO | Gallatin | Pavement Improvement | $190,041 |
RESURFACING OF COUNTY HIGHWAY 5 FROM US 50 TO IL 151 (Federal ID: 1784105) | HOWELL ASPHALT CO & HOWELL PAV | Clinton | Pavement Improvement | $70,000 |
RESURFACING OF COUNTY HIGHWAY 32 FROM JEFFERSON RD. TO THE I-57 OVERPASS. SECTION 09-00131-00-RS (Federal ID: 1790103) | HOWELL ASPHALT CO & HOWELL PAV | Marion | Pavement Improvement | $633,060 |
LA CONSTRUCTION ENGINEERING FOR RESURFACING OF LINDENTHAL AVE. WITH CURB AND GUTTER REPLACEMENT FROM WASHINGTON TO POPLAR IN HIGHLAND (Federal ID: 5011263) | QUALITY TESTING & ENGINEERING, INC. | Madison | Pavement Improvement | $1,000 |
LA CONSTRUCTION ENGINEERING FOR RESURFACING OF LINDENTHAL AVE. WITH CURB AND GUTTER REPLACEMENT FROM WASHINGTON TO POPLAR IN HIGHLAND (Federal ID: 5011263) | CHRIST BROS ASPHALT INC | Madison | Pavement Improvement | $152,064 |
LA CONSTRUCTION ENGINEERING FOR RESURFACING OF LINDENTHAL AVE. WITH CURB AND GUTTER REPLACEMENT FROM WASHINGTON TO POPLAR IN HIGHLAND (Federal ID: 5011263) | CITY OF HIGLAND | Madison | Pavement Improvement | $1,822 |
PRELIMINARY ENGINEERING FOR THE MILLING AND RESURFACING OF MADISON AVE. IN EDWARDSVILLE. SECTION 09-00099-00-RS (Federal ID: 5011267) | OATES ASSOC., INC. | Madison | Other | $34,000 |
PRELIMINARY ENGINEERING FOR THE RESURFACING OF WEST MAIN STREET (GLEN CARBONN ROAD) IN THE VILLAGE OF GLEN CARBON. SECTION 09-00018-01-RS (Federal ID: 5011276) | THOUVENOT, WADE AND MOERCHEN, INC. | Madison | Other | $26,905 |
LAND ACQUISITION FOR THE CONSTRUCTION OF A BIKE/PED TRAIL TO CONNECT ELDORADO TO HARRISBURG, SECTION 06-00082-00-BT (Federal ID: 00D9096) | No Contractor | Saline | Other | $22,500 |
RESURFACE FAS 711 (CH 25) & CONSTRUCT AGGREGATE SHOULDERS FROM TR 257 NORTH 08-00090-00-RS (Federal ID: 0711108) | No Contractor | Effingham | Pavement Improvement | $361,611 |
RECONSTRUCT WITH A PCC OVERLAY, PATCHING, SIDEWALKS, CULVERTS & RESHAPING OF DITCHES ON FAS 713 (MICHIGAN ST & LOGAN ST) * (Federal ID: 0713111) | No Contractor | Shelby | Pavement Improvement | $487,714 |
RESURFACING SORENTO RD FROM EAST OF NEW DOUGLAS RD TO WEST OF CRANE RD, SECTION 09-00080-01-RS (Federal ID: 0777114) | No Contractor | Bond | Pavement Improvement | $215,000 |
RESURFACE FAS 898 (HARCO RD) FROM OLD IL 13 NORTH TO BRUSHY CREEK CHURCH ROAD IN SALINE COUNTY. (Federal ID: 0898107) | No Contractor | Saline | Pavement Improvement | $286,154 |
RESURFACE FAS 931 (CH 11) FROM CH 10 NORTH TO THE JOHNSON COUNTY LINE 08-00062-02-RS (Federal ID: 0931110) | No Contractor | Massac | Pavement Improvement | $176,112 |
REPLACE STRUCTURE CARRYING FAS 2821 (CH 7) OVER MARTIN CREEK, 1 MILES EAST OF GEFF IN WAYNE COUNTY. (Federal ID: 2821108) | No Contractor | Wayne | Bridge Improvement | $390,931 |
RESURFACING OF OSTLE DR FROM 50 FT EAST OF NEWPORT DR TO WAVERLY DR IN COLLINSVILLE, SECTION 09-00092-00-RS (Federal ID: 5011270) | No Contractor | Madison | Pavement Improvement | $165,000 |
RESURFACING OF FAU 9390, FROM 300 FT S. OF HARVESTYME LN. TO 300 FT NORTH OF CARLA DR IN TROY, SECTION 09-00027-00-RS (Federal ID: 5011292) | No Contractor | Madison | Pavement Improvement | $134,750 |
RESURFACING BROOKSIDE AVE FROM 15TH ST TO 17TH ST IN WAMAC, SECTION 09-00012-00-RS (Federal ID: 5012017) | No Contractor | Clinton | Pavement Improvement | $41,880 |
SIDEWALK REMOVAL AND REPLACEMENT AT VARIOUS LOCATIONS ALONG US 51 BETWEEN MCBRIARTY ST AND PEARCT ST IN CENTRAL CITY, SECTION 09-00009-00-SW (Federal ID: 5012018) | No Contractor | Marion | Safety/Traffic Management | $41,370 |
CONSTRUCT PCC PAVEMENT ON FAU 8381 (VETERANS DR) FROM 4TH ST TO SOUTH OF BLOHM AVE & EXTEND BLOHM AVE WITH PCC * (Federal ID: 5021025) | No Contractor | Effingham | Pavement Improvement | $374,589 |
RESURFACE FAU 9762 (7TH ST.) FROM FILMORE TO EAST OF US 45 & FAU 9757 (19TH ST.) FROM NORTH TO EAST OF US 45 IN METROPOLIS 090-00043-00-RS (Federal ID: 5045008) | No Contractor | Massac | Pavement Improvement | $196,066 |
RESURFACING FAU 8566 (MARION ST.) FROM MAIN TO BLAIR, FAU 8558 (WITTAKER ST.) FROM BORADWAY TO COLLEGE, FAU 8557 (BOONE ST.) FROM RODDY TO AIRPORT RD. & FAU 8562 (AIRPORT RD.) FROM BOONE TO MILLS CART (Federal ID: 5064014) | No Contractor | Marion | Pavement Improvement | $239,230 |
REMOVE EXISTING PAVEMENT & CONSTRUCT A 7" PCC PAVEMENT ON FAU 8422(COLES ST) FROM THE CSX RR OVERPASS TO ST. LOUIS AVE IN VANDALIA (Federal ID: 5068024) | No Contractor | Fayette | Pavement Improvement | $210,978 |