Illinois • IL-13 Congressional District
Top 10 Largest Contracts
DES PLAINES RIVER, RR CANAL (N ABUTMENT) (... | IL / Cook |
$4,180,998
|
E OF I-355 (VETERAN'S TOLLWAY) TO WARWICK ... | IL / DuPage |
$2,549,164
|
I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-... | IL / Will |
$1,650,012
|
CONSTRUCTION OF A SHARED USE PATH IN NAPER... | IL / DuPage |
$1,623,500
|
VARIOUS LOCATIONS IN KANE COUNTY (Federal ... | IL / Will |
$1,595,801
|
WILL-COOK RD TO W OF US 45 (Federal ID: 03... | IL / Cook |
$1,275,067
|
WILL-COOK RD TO W OF US 45; I-355 TO WILL-... | IL / Cook |
$1,100,000
|
DES PLAINES RIVER, RR CANAL (N ABUTMENT) (... | IL / Cook |
$1,000,000
|
Total # Projects: | 20 |
Total # Contracts: | 8 |
Total $ Projects: | $23,664,913 |
Total $ Contracts: | $14,974,542 |
Congressmembers
- Sen. Richard J. Durbin (D) See Campaign Finances
- Rep. Judy Biggert (R) See Campaign Finances
- Sen. Roland W. Burris (D) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
IL-01 | $26,594,485 |
IL-02 | $82,090,317 |
IL-03 | $17,070,912 |
IL-04 | $1,538,505 |
IL-05 | $9,862,114 |
IL-06 | $4,678,647 |
IL-07 | $27,016,520 |
IL-08 | $31,100,752 |
IL-09 | $18,533,615 |
IL-10 | $16,584,649 |
IL-11 | $53,872,007 |
IL-12 | $26,922,107 |
IL-14 | $30,739,642 |
IL-15 | $78,826,601 |
IL-16 | $22,973,806 |
IL-17 | $64,647,132 |
IL-18 | $54,466,932 |
IL-19 | $56,024,035 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for IL-13. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
VARIOUS LOCATIONS IN KANE COUNTY (Federal ID: 000S653) | IROQUOIS PAVING CORP | Will | Pavement Improvement | $1,595,801 |
WILL-COOK RD TO W OF US 45; I-355 TO WILL-COOK RD (Federal ID: 0209008) | PB AMERICAS, INC | Cook | Other | $1,100,000 |
DES PLAINES RIVER, RR CANAL (N ABUTMENT) (Federal ID: 0209010) | LOCHNER, H. W., INC. | Cook | Other | $1,000,000 |
E OF I-355 (VETERAN'S TOLLWAY) TO WARWICK AVE (Federal ID: 0311037) | CENTRAL BLACKTOP CO INC | DuPage | Pavement Improvement | $2,549,164 |
I-355 (VETERANS MEMORIAL TOLLWAY) TO WILL-COOK RD (Federal ID: 0351019) | JAMES D FIALA PAVING CO INC | Will | Pavement Improvement | $1,650,012 |
WILL-COOK RD TO W OF US 45 (Federal ID: 0351020) | JAMES D FIALA PAVING CO INC | Cook | Pavement Improvement | $1,275,067 |
DES PLAINES RIVER, RR CANAL (N ABUTMENT) (Federal ID: 2612002) | ALBIN CARLSON & CO | Cook | Bridge Improvement | $4,180,998 |
CONSTRUCTION OF A SHARED USE PATH IN NAPERVILLE SECTION 99-00109-01-BT (Federal ID: 8003888) | LEDCOR CONST INC & MERRYMAN | DuPage | Transportation Enhancements | $1,623,500 |
BEAUMONT DR TO RAYMOND DR (Federal ID: 0311039) | No Contractor | DuPage | Pavement Improvement | $2,140,000 |
2.31 MILES OF RESURFACING ON IL 7 FROM IL 53 TO INTERSTATE 355 WITHIN THE CITY OF LOCKPORT IN WILL COUNTY. (Federal ID: 0351021) | No Contractor | Will | Pavement Improvement | $1,615,000 |
RESURFACE FAU 282 (135TH ST) FROM IL ROUTE 53 TO THE CALUMET SAG SHIP CANAL BRIDGE IN ROMEOVILLE IN WILL COUNTY. (Federal ID: 9003361) | No Contractor | Will | Pavement Improvement | $415,000 |
RESURFACE FAU 328 (GAYLORD RD.) FROM THEODORE ST. TO WATERFORD DR. IN CREST HILL 09-00039-00-RS (Federal ID: 9003371) | No Contractor | Will | Pavement Improvement | $211,000 |
CONSTRUCTION ENGINEERING FOR RESURFACE FAU 3771 (151ST ST.) FROM COUGAR RD. TO CEDAR RD. IN THE VILLAGE OF HOMER GLEN 09-00013-00-RS (Federal ID: 9003373) | No Contractor | Will | Pavement Improvement | $366,000 |
INSTALL TRAFFIC SIGNALS & INTERCONNECT AT THE INTERSECTION OF FAU 1591 (127TH ST) & TIMBERLINE DRIVE IN LEMONT IN COOK COUNTY. (Federal ID: 9003377) | No Contractor | Cook | Safety/Traffic Management | $300,000 |
CONSTRUCT SIDEWALK ADJACENT TO FAP 338 (IL 59) & PEDESTRIAN TRAFFIC SIGNALS FROM WEST 119TH ST TO 87TH ST IN NAPERVILLE. (Federal ID: 9003380) | No Contractor | DuPage | Safety/Traffic Management | $900,000 |
RESURFACE FAU 405 (DRAUDEN RD) FROM CATHERINE DRIVE TO 600' SOUTH OF ROCK DRIVE IN PLAINFIELD IN WILL COUNTY. (Federal ID: 9003383) | No Contractor | Will | Pavement Improvement | $210,000 |
RESURFACE FAP 349 (WALLIN DR) FROM IL 126 (LOCKPORT ST) TO 143RD STREET IN PLAINFIELD IN WILL COUNTY. (Federal ID: 9003396) | No Contractor | Will | Pavement Improvement | $280,000 |
RESURFACE, REPLACE CURB & GUTTER, PATCHING, WATERMAIN, SOTRM & SANITARY SEWER REPLACEMENT ON FAU 2678 (GARFIELD ST * (Federal ID: 9003425) | No Contractor | DuPage | Pavement Improvement | $1,539,000 |
RESURFACE FAU 3586 (BOUGHTON RD.) WEST OF ILLINOIS ROUTE 53 TO WEST OF SCHMIDT RD. IN THE VILLAGE OF BOLINGBROOK (Federal ID: 9003436) | No Contractor | Will | Pavement Improvement | $660,000 |
CONSTRUCT SIDEWALK ADJACENT TO FAU 2684 (COUNTY LINE RD) FROM PLAINFIELD RD TO LONGWOOD DR & FROM 91ST ST TO ASHTON DR, BURR RIDGE (Federal ID: 9003515) | No Contractor | DuPage | Safety/Traffic Management | $84,200 |