Matanuska-Susitna County, Alaska, funds by Interior, Department of
Listing $1,814,099.00 in stimulus funds from Interior, Department of for Matanuska-Susitna
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ALLIED ALASKA ELECTRIC LLC | $341,767 |
Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National
This spending item is part of a $2,541,074 allocation.
See details
|
National Park Service | 8/26/2010 |
MATANUSKA-SUSITNA BOROUGH | $256,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. To imporve migratory fish passage on Wasilla Creek at Grantham Road by building a bridge to replace an undersized culvert. | U.S. Fish and Wildlife Service | 9/03/2009 |
ALASKA ASSOCIATION CONSERVATION DISTRICTS | $220,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The purpose of this grant was to manage small incipient infestations of invasive weeds across Alaska. Targeting small infestations of weeds, before they grow out of control, is known as early detection and rapid-response. EDRR i is the most cost-effective... Show more | U.S. Fish and Wildlife Service | 8/06/2009 |
MATANUSKA-SUSITNA BOROUGH | $120,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. To improve migratory fish passage on Little Su Tributary at Edgerton Road through the replacement of three undersized culverts and habitat restoration. | U.S. Fish and Wildlife Service | 9/03/2009 |
KNIK TRIBAL COUNCIL NONPROFIT CORPORATION | $114,589 | Highway Planning and Construction Indian Reservation Roads Program, funds used in the implementation of preconstruction p,lanning and design of chief wasilla way road. | Indian Affairs (Assistant Secretary) | 4/01/2010 |
KNIK TRIBAL COUNCIL NONPROFIT CORPORATION | $114,589 | Highway Planning and Construction The project will implement Phase I of this two-phased project and will include the following tasks: The purpose of this phase I is to map all the identified constriants within the study area that might impact on chosing potential routes for the Chief Wasi | Indian Affairs (Assistant Secretary) | 4/01/2010 |
KNIK TRIBAL COUNCIL NONPROFIT CORPORATION | $114,589 | Highway Planning and Construction Cheif Wasilla Way Road Design | Indian Affairs (Assistant Secretary) | 4/01/2010 |
KNIK TRIBAL COUNCIL NONPROFIT CORPORATION | $102,892 | ARRA Child Care and Development Block Grant (5) Project Description: Knik Tribe will provide a case manager to coordinate summer youth activities, afterschool programs in order to assist our members who are attending work, school, or training. | Indian Affairs (Assistant Secretary) | 3/02/2010 |
NATURAL RESOURCES, ALASKA DEPARTMENT OF | $100,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Funds the Division of Agriculture, Plant Materials Center to eradicate and evaluate efforts to eradicate spotted knapweed from the state of Alaska. Spotted knapweed is a notorious invasive weed that costs millions of dollars in m management and lost resour... Show more | U.S. Fish and Wildlife Service | 7/13/2009 |
MATANUSKA-SUSITNA BOROUGH | $100,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. To improve migratory fish passage on Cottonwood Creek at Engstrom Road through undersized culvert replacement. | U.S. Fish and Wildlife Service | 9/10/2009 |
KWINHAGAK, NATIVE VILLAGE OF | $86,804 | Highway Planning and Construction Phase 1 Design project to develop, survey, design, environmental, archeological, rights-of-way on the Kanaktok River Road | Indian Affairs (Assistant Secretary) | 5/04/2010 |
GREAT NORTHERN ENGINEERING, LLC | $56,592 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
H CONSTRUCTION LLC | $49,500 | The purpose of this contract is to perform trail maintenance in accordance with the terms and conditions for trail brushing,clearing, and marking on specified trail sections along approximately 24.3 miles of trails. | Bureau of Land Management | 5/27/2010 |
HIGH TIDE ENVIRONMENTAL LLC | $36,777 |
Highway Planning and Construction PROJECT WILL CONSIST OF TOPOGRAPIC SURVEY AND ENVIRIONMENTAL RESEARCH FOR THE PROPOSED AKUTAN HARBOR ACCESS ROAD
This spending item is part of a $72,777 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/01/2010 |