Fresno County, Calif., funds by Interior, Department of
Listing $7,394,064.13 in stimulus funds from Interior, Department of for Fresno
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
WESTLANDS WATER DISTRICT | $3,700,000 | Water 2025 WATER CONSERVATION THROUGH IRRIGATION SYSTEM PURCHASE PROGRAM: Using existing revolving funds, WWD will purchase irrigation systems for qualified farmers growing on drainage impaired lands. The District will loan 50% of the cost (from existing revolving | Bureau of Reclamation | 3/30/2010 |
WESTERN OILFIELDS SUPPLY COMPANY | $2,638,402 | Purchase of Commercial Pumps and Piping Supplies for Drought Relief | Bureau of Reclamation | 6/23/2010 |
BAILEY VALVE, INC. | $430,339 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
BIG SANDY RANCHERIA | $197,732 | Highway Planning and Construction Operation and administration of the ARRA indian reservation roads program | Indian Affairs (Assistant Secretary) | 9/15/2010 |
BAILEY VALVE, INC. | $135,000 |
Water 2025 Construction of the Oro Grande Wash Recharge Project
This spending item is part of a $3,609,079 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
APPLIED EARTHWORKS INC | $70,000 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
COOPER CHASE CONSTRUCTION | $68,000 | Merced WSR Road Rehab | Bureau of Land Management | 9/02/2009 |
COOPER CHASE CONSTRUCTION | $68,000 | Install Culverts at Merced Road Rehab. | Bureau of Land Management | 9/02/2009 |
VOBECKY ENTERPRISES, INCORPORATED | $42,996 | Archer Mine Soil remediation and Structure demoliton | Bureau of Land Management | 1/22/2010 |
APPLIED EARTHWORKS INC | $30,600 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
APPLIED EARTHWORKS INC | $12,996 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |