Inyo County, Calif., funds by Interior, Department of
Listing $4,974,967.27 in stimulus funds from Interior, Department of for Inyo
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BISHOP INDIAN TRIBAL COUNCIL | $1,000,000 | Fish and Wildlife Coordination Act Overall purpose of the project is to install a water distribution system to provide a perennial and controlled water supply to a wetland portion of the Tribe?s Conservation Open Space Area (COSA) to restore the beneficial uses of that water for sensitive, | Bureau of Reclamation | 8/30/2010 |
SUNWIZE TECHNOLOGIES, INC. | $801,434 | Installation of solar electric system.Park | National Park Service | 4/07/2010 |
JAYNES CORPORATION | $601,287 |
This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation.
See details
|
National Park Service | 2/18/2010 |
B.C. SCHMIDT CONSTRUCTION, INC. | $498,950 | Due to safety concerns, the Keane Wonder Mine is closed to visitors. Construction services to provide stabilization to the Keane Wonder Mine Aerial Tramway by repaing Towers 8 and 9, the upper terminal and lower terminal. Includes project design, managem | National Park Service | 5/13/2010 |
ANDERSON BURTON CONSTRUCTION, INC. | $488,178 | CONSTRUCT EGRESS OFF OF RAISED REAR PORCHES (CONSTRUCTION OF STAIRS/HANDRAILS AND CUT THROUGH EXISTING RAILING) AND CONSTRUCT EXTENSIONS OF EXISTING ROOFLINES OVER HVAC EQUIPMENT TO MATCH EXISTING ROOFLINES OF FOUR SINGLE FAMILY HOUSES AND FIVE DUPLEX UNI | National Park Service | 3/26/2010 |
BISHOP INDIAN TRIBAL COUNCIL | $391,441 | Highway Planning and Construction Operation and administration of the American Recovery and Reinvestment Act Indian Reservation Roads Program and the Indian Reservation Roads Program. | Indian Affairs (Assistant Secretary) | 9/15/2010 |
BIG PINE PAIUTE TRIBE, THE | $238,301 | Highway Planning and Construction Fixing Roads | Indian Affairs (Assistant Secretary) | 9/15/2010 |
SUNWIZE TECHNOLOGIES, INC. | $208,950 | Installation of solar electric system Park | National Park Service | 3/22/2010 |
MACTEC ENGINEERING AND CONSULTING, INC. | $190,555 |
AE DESIGN SERVICES FOR SCHEMATIC DESIGN DEVELOPMENT AND CONSTRUCTION FOR FURNACE CREEK VISITORS CENTER AT DEATH VALLEY NATIONAL PARK.
This spending item is part of a $291,741 allocation.
See details
|
National Park Service | 8/06/2009 |
BIG PINE PAIUTE TRIBE, THE | $149,826 | Highway Planning and Construction fixing roads | Indian Affairs (Assistant Secretary) | 9/15/2010 |
WULFENSTEIN CONSTRUCTION COMPANY | $82,250 | Manufacture, furnish and deliver 1,000 tons of hot asphalt concrete mix to the Death Valley National Park, Death Valley, California. | National Park Service | 2/08/2010 |
AMEC E&I, INC | $61,400 |
CONDUCT POST CLOSURE BAT SURVEYS AT ABANDONED MINE FEATURES IN DEATH VALLEY NATIONAL PARK, CA.
This spending item is part of a $138,555 allocation.
See details
|
National Park Service | 5/12/2010 |
SANDERS, ERIC J | $59,520 |
Install safety closures in various Death Valley/Keane Wonder Mine areas' abandoned mines to protect visitors and preserve resources.
This spending item is part of a $588,881 allocation.
See details
|
National Park Service | 4/22/2010 |
Whisper Jet Inc | $41,118 |
Install safety closures in various Death Valley/Keane Wonder Mine areas' abandoned mines to protect visitors and preserve resources.
This spending item is part of a $588,881 allocation.
See details
|
National Park Service | 4/22/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $39,525 | Upper Aurora Canyon/Lower Summers Sagebrush Restoration Cut & Pile/Lop & Scatter Vegetation Treatment | Bureau of Land Management | 3/01/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $39,525 | Upper Aurora Canyon Lowers Summer Sagebrush Restoration Cut& Pile/Lop & Scatter | Bureau of Land Management | 3/01/2010 |
BISHOP INDIAN TRIBAL COUNCIL | $38,645 | Road Maintenance_Indian Roads Minor maintenance and repair to roads and bridges on the Bishop Paiute Tribe Reservation | Indian Affairs (Assistant Secretary) | 3/31/2010 |
CXT INCORPORATED | $35,927 | PROVIDE DOUBLE VAULT TOILET BUILDING TO DEATH VALLEY NATIONAL PARK. | National Park Service | 2/22/2010 |
DOYLE, DAN R | $8,136 | Upper Bodie Creek Fence | Bureau of Land Management | 12/23/2009 |