Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Mesa County, Colo., funds by Interior, Department of

Listing $2,388,623.54 in stimulus funds from Interior, Department of for Mesa

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HAMILTON, NORA $313,490 WY Trails Inventory
This spending item is part of a $530,415 allocation. See details
Bureau of Land Management 3/10/2010
Pinnt Roofing & Construction, Inc. $272,952 The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation. See details
Bureau of Land Management 3/31/2010
OLDCASTLE SW GROUP, INC. $201,380 Recovery-Asphalt repairs at McPhee Marina Road and Parking Lot in the San Juan National Forest. Aggregate Surface Course shoulder, grading CDOT CL-6 666 Tons. Patching of Hot Mix Asphalt CDOT (Grading SX)(75)(pg 58-28) at 496 Tons. 2 Hot Mixed Asphalt Ove Indian Affairs (Assistant Secretary) 6/15/2010
Polaris Drilling, Inc. $198,000 Design and construction of approximately 31,640 linear feet (6 miles) of 6 inch stainless steel main water line and various components between the existing Chapin Mesa water tanks and the Park's north boundary in the Montezuma Valley. The new line will be
This spending item is part of a $7,222,347 allocation. See details
National Park Service 2/26/2010
PETTY CONSTRUCTION COMPANY, LLC $192,000 Design and construction of approximately 31,640 linear feet (6 miles) of 6 inch stainless steel main water line and various components between the existing Chapin Mesa water tanks and the Park's north boundary in the Montezuma Valley. The new line will be
This spending item is part of a $7,222,347 allocation. See details
National Park Service 2/26/2010
GREENING YOUTH FOUNDATION, INC $169,135 GYF in partnership with NPS IMR conducted the re-lamping of the following NPS sites, Grand Junction, Gunnison and Black Canyon. The Project was performed utilizing youth students from the Metro-Denver inner-city area. All youth were of color in an effor National Park Service 3/15/2010
RIDGWAY VALLEY ENTERPRISES, INC. $117,863 Grand Junction Air Center Solar Phase 2 Bureau of Land Management 11/24/2009
TUSCA II, INC. $97,668 Remove and dispose of existing wood pole fence and construct a new wood pole fence around Mud Springs Campground. Additional work includes but is not limited to, removal and disposal of existing picnic tables, and furnishing and installing picnic tables. Bureau of Land Management 8/28/2009
TUSCA II, INC. $96,632 Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings.
This spending item is part of a $209,260 allocation. See details
Bureau of Land Management 4/01/2010
COLORADO YOUTH CORPS ASSOCIATION $85,000 Recreation Resource Management To improve trail conditions and provide sustainable recreational opportunities throughout McInnis Canyons NCA. Bureau of Land Management 5/26/2010
WESTWATER ENGINEERING, INC. $75,000 T&E CLEARANCE IN AREA WITH POTENTIAL FOR COMMERCIAL SOLAR ENERGY FACILITY. Bureau of Land Management 4/27/2010
MAYS CONCRETE, INC. $74,695 Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings.
This spending item is part of a $209,260 allocation. See details
Bureau of Land Management 4/01/2010
COLORADO YOUTH CORPS ASSOCIATION $60,000 Recreation Resource Management Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area Bureau of Land Management 7/30/2009
COLORADO YOUTH CORPS ASSOCIATION $55,000 Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area Bureau of Land Management 3/15/2010
COLORADO YOUTH CORPS ASSOCIATION $55,000 Recreation Resource Management Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area Bureau of Land Management 3/15/2010
SUN SPOT SOLAR, LLC $47,120 Whitewater Photovoltiac System. Furnish labor, equipment, supplies and materials to construct a photovoltiac solar system and associated appurtenances. Bureau of Land Management 2/08/2010
NATURAL RESOURCES, COLORADO DEPARTMENT OF $46,859 Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings within the BLM field office area. These openings pose the threat of injury or death to visitors on public land. Bureau of Land Management 3/15/2010
Martin Construction Co, Inc $41,641 Furnish all labor, materials and equipment to design and build of one bank of eight (8) reinforced concrete raceways and the rehabilitation of six (6) rearing ponds. Included with this project will be associated structures, supply piping to new raceways
This spending item is part of a $1,190,267 allocation. See details
U.S. Fish and Wildlife Service 11/30/2009
Timberwolf Welding $31,814 Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings.
This spending item is part of a $209,260 allocation. See details
Bureau of Land Management 4/01/2010
JIM YOUNG ENTERPRISES, LLC $30,973 Recovery Sheep Creek Emergency Road Repair Bureau of Land Management 4/01/2010
H & H ENVIRONMENTAL INC $21,900 Furnish all labor, materials and equipment to design and build of one bank of eight (8) reinforced concrete raceways and the rehabilitation of six (6) rearing ponds. Included with this project will be associated structures, supply piping to new raceways
This spending item is part of a $1,190,267 allocation. See details
U.S. Fish and Wildlife Service 11/30/2009
ARNESEN, GENE $20,000 Develop an implementation plan for trail maintenance for the trails within the McInnis Canyons National Conservation Area (MCNCA) including trails located in Rabbit Valley, Black Ridge Canyons Wilderness and the Front Country. This includes: evaluating a Bureau of Land Management 7/29/2010
RIDGE ELECTRIC LLC $19,900 Recovery Low Gap Solar Project Bureau of Land Management 3/10/2010
WOODS CANYON ARCHEAOLOGICAL CONSULTANTS INC $17,569 Canyons of the Ancients Invasive Weeds Treatment: Archaeological Inventory Dirk Hood and Murphy Parcels is a Class III archaeological inventory of two parcels of public land within the Canyons of the Ancients National Monument with an aggregate total of a Bureau of Land Management 3/17/2010
X FIELD SERVICES LLC $17,440 Watershed resoration Bureau of Land Management 4/02/2010
SUMMITT FORESTS INC $8,888 LOWER HORSEFLY SLASHING TASK ORDER ON CONTRACT #L06PC90336 Bureau of Land Management 8/14/2009
SMITH ENVIRONMENTAL AND ENGINEERING $8,665 Abandoned mine lands Grand Junction field office mine closure and reclamation Class III Inventory Bureau of Land Management 3/30/2010
SMITH ENVIRONMENTAL AND ENGINEERING $5,920 Class III Archaeological Survey conducted on approximately 105 acre survey campground unit within the BLM McInnis Canyons National Conservation Area, located on BS Road west of Glade Park. Bureau of Land Management 7/06/2009
D AND G MARIAN INC. $4,400 Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings.
This spending item is part of a $209,260 allocation. See details
Bureau of Land Management 4/01/2010
HIGH DESERT SURVEYING,LLC $1,720 Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings.
This spending item is part of a $209,260 allocation. See details
Bureau of Land Management 4/01/2010