Bonneville County, Idaho
U.S. | Idaho | Bonneville | |
---|---|---|---|
Population | 308,745,538 | 1,567,582 | 104,592 |
Total recovery funding | $522,082,377,600 | $2,935,931,117 | $526,921,115 |
Funding per Capita | $1,691 | $1,873 | $5,038 |
Unemployment
7/2008 |
6.2 |
4.6 |
3.2 |
7/2009 |
+3.6
9.8 |
+3.2
7.8 |
+2.6
5.8 |
7/2010 |
-0.2
9.6 |
+0.8
8.6 |
+0.8
6.6 |
7/2011 |
-0.6
9.0 |
-0.1
8.5 |
+0.3
6.9 |
7/2012 |
-0.9
8.1 |
-1.6
6.9 |
-1.0
5.9 |
This site was updated in September 2012. It includes recipient-reported data through the second quarter of 2012, which was released in July 2012.
Important: This interactive database is not kept up-to-date and should be treated as a historical snapshot. As records may have changed since we stopped making updates, researchers and consultants wishing to use the data should check against original sources for accuracy before using any data published here.
Those wishing to download the data can find it at the ProPublica Data Store.
Funding by Federal Agency and Department
Click total to see spending list | ||
---|---|---|
Energy, Department of | $457,815,809 | |
Education, Department of | $19,375,845 | |
Agriculture, Department of | $16,948,619 | |
Small Business Administration | $14,284,700 | |
Transportation, Department of | $4,863,610 | |
Social Security Administration | $3,799,500 | |
Housing and Urban Development, Department of | $3,167,838 | |
U.S. Army Corps of Engineers | $2,750,000 | |
Justice, Department of | $1,305,728 | |
Interior, Department of | $1,297,194 | |
Health and Human Services, Department of | $569,657 | |
Employment and Training Administration | $303,703 | |
Department of Veterans Affairs | $238,912 | |
National Aeronautics and Space Administration | $150,000 | |
Commerce, Department of | $50,000 |
Show more/fewer agencies
Projects
Stimulus contracts, grants and loans in Bonneville County, Idaho
Data last updated on September 2012.
We have CSV files available for download. Sign up here.
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Bonneville County has more than 200 stimulus spending items. View the top 200 items by expenditure amount. View the lists by federal department and agency in the top-right corner of this page.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
CH2M WG IDAHO LLC | $182,812,997 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CH2M WG IDAHO LLC | $89,084,314 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CH2M WG IDAHO LLC | $86,092,770 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BECHTEL BWXT IDAHO, LLC | $9,216,910 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $7,499,276 | Contract |
The Idaho National Laboratory (INL) is part of a team of 49 project partners that will deploy 11,210 electric drive vehicle chargers that will be used to recharge 4,700 Nissan Leaf battery electric vehicles in five states: Arizona, California, Oregon, Ten
This spending item is part of a $7,803,440 allocation.
See details
|
Energy, Department of | 9/24/2009 |
NORTH WIND SERVICES, LLC | $7,213,920 | Contract |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
NORTH WIND, INC. | $6,148,162 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
IDAHO FALLS SCHOOL DISTRICT NO. 91 EDUCATION FOUNDATION, INC. | $6,103,588 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act State Fiscal Stabilization Fund - Educational Grants, Recovery Funds for higher education and support of public elementary and secondary education (K-12) programs and services.
This spending item is part of a $201,699,682 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 5/22/2009 |
BONNEVILLE JOINT SCHOOL DISTRICT # 93 | $5,657,245 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act State Fiscal Stabilization Fund - Educational Grants, Recovery Funds for higher education and support of public elementary and secondary education (K-12) programs and services.
This spending item is part of a $201,699,682 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 5/22/2009 |
NORTH WIND, INC. | $4,970,396 | Contract |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
MULTIPLE RECIPIENTS | $4,623,310 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture, Department of / Rural Housing Service | 8/31/2009 |
IDAHO FALLS, CITY OF | $4,252,980 | Grant |
Electricity Delivery and Energy Reliability, Research, Development and Analysis Title: Pacific Northwest Smart Grid Demonstration Purpose: This demonstration will validate new smart grid technologies and inform business cases; provide two-way communication between distributed generation, storage,e, and demand assets and the existin... Show more
This spending item is part of a $88,821,251 allocation.
See details
|
Energy, Department of | 2/01/2010 |
DOYON PROJECT SERVICES LLC | $4,193,718 | Contract |
Design and construct a gravel haul road roughly 13 miles in length on the Idaho National Labortory facility for Department of Energy Operations.
This spending item is part of a $6,235,364 allocation.
See details
|
Energy, Department of | 9/03/2010 |
BONNEVILLE, COUNTY OF | $4,108,400 | Contract | gravel placed on roads and install bridges | Agriculture, Department of / Forest Service | 5/01/2009 |
BONNEVILLE, COUNTY OF | $4,108,400 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance Skyline Road 2 is the one project we now have open. This project consists of road reconstruction and gravel placement on approximately 11 miles of Skyline Road | Agriculture, Department of / Forest Service | 3/17/2009 |
MULTIPLE RECIPIENTS | $3,743,000 | Direct P | Social Security Economic Recovery Act Payments | Social Security Administration | 6/30/2009 |
PORTAGE, INC. | $3,699,711 | Contract |
Project Description & Objectives: The Delta Prime (DP) TSTA facility was used for polonium, actinide and tritium research and production, and for the civilian fusion reactor program. The facility has approximately 16,000 square feet of space. Recovery
This spending item is part of a $14,775,000 allocation.
See details
|
Energy, Department of | 7/22/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $3,550,132 | Contract |
Enhanced Geothermal Systems (EGS) Technology R&D ($1.953M). This scope of work includes four scopes of work. 1) Air-Cooled Condensers in Next-Generation Conversion Systems. The Idaho National Laboratory (INL) will identify and resolve issues that ar
This spending item is part of a $3,780,015 allocation.
See details
|
Energy, Department of | 9/08/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $3,261,069 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
S.M. STOLLER CORPORATION, THE | $3,000,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
SUMMERHILL LIMITED PARTNERSHIP | $2,900,000 | Grant |
Tax Credit Assistance Program (Recovery Act Funded) The Tax Credit Assistance Program (TCAP) will fill financing gaps caused by the reduction of equity investment in the Low Income Housing Tax Credit (LIHTC) program. TCAP will provide gap financing for the construction or rehabilitation of affordablble hous... Show more
This spending item is part of a $10,050,622 allocation.
See details
|
Housing and Urban Development, Department of | 6/26/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $2,800,000 | Contract |
'Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite
This spending item is part of a $79,000,000 allocation.
See details
|
Energy, Department of | 5/27/2009 |
AMMON, CITY OF | $2,750,000 | Grant | Montana, Nevada, New Mexico, Utah, Idaho, & Wyoming Environmental Infrastructure (Section 595) - ARRA USACE Section 595 Oartbersguo, Provide funds for the EIRWWA Eastern Interceptor construction buy stimulating the local spending with supplimental funds through the ARRA program. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
NORTH WIND, INC. | $2,608,917 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND, INC. | $2,600,000 | Contract |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Arrington Construction Company | $2,508,120 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND, INC. | $2,055,293 | Contract | Salt Chuck Mine Mill Area Non-Time Critical Removal Action. Project located at northern-extremity of Kasaan Bay, on Prince of Whales Island, AK. The award is to impliment the selected mine tailings removal action which includes tailings and impacted soil | Agriculture, Department of / Forest Service | 9/03/2010 |
IDAHO FALLS SCHOOL DISTRICT NO. 91 EDUCATION FOUNDATION, INC. | $1,946,061 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of IDEA.
This spending item is part of a $53,247,375 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
BONNEVILLE JOINT SCHOOL DISTRICT # 93 | $1,817,266 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of IDEA.
This spending item is part of a $53,247,375 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $1,604,642 | Contract |
There are two scopes of work for this project. 1) The first scope ($1,060K) intends to develop an original approach to take advantage of two experimental facilities: the neutron irradiation capabilities of the Advanced Test Reactor (ATR) at the Idaho Na
This spending item is part of a $1,742,000 allocation.
See details
|
Energy, Department of | 9/08/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $1,583,290 | Contract |
There are two scopes of work for this project. 1) Water-Gas-Shift Membrane Reactor for High Pressure Hydrogen Production. The objective of this project is to develop hydrogen-selective membranes for an innovative gas separation process based on a water-
This spending item is part of a $2,962,984 allocation.
See details
|
Energy, Department of | 8/04/2009 |
NORTH WIND, INC. | $1,537,364 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
TRANSPORTATION, IDAHO DEPARTMENT OF | $1,463,958 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 9/25/2009 |
IDAHO FALLS SCHOOL DISTRICT NO. 91 EDUCATION FOUNDATION, INC. | $1,208,609 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $34,955,709 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $1,173,258 | Contract |
The High-Energy Battery Test Facility equipment will include 10 primary high-energy test stations; one vibration test station; one central control room; calibration equipment; and electric power, and HVAC upgrades necessary to conduct the battery testing.
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
MULTIPLE RECIPIENTS | $1,114,200 | Loan | Very Low to Moderate Income Housing Loans - Direct SECTION 502 SINGLE FAMILY HSNG DIRECT LN - 2009 ARRA | Agriculture, Department of / Rural Housing Service | 6/30/2009 |
ORMOND BUILDERS, INC. | $1,012,032 | Contract |
The High-Energy Battery Test Facility equipment will include 10 primary high-energy test stations; one vibration test station; one central control room; calibration equipment; and electric power, and HVAC upgrades necessary to conduct the battery testing.
This spending item is part of a $5,000,000 allocation.
See details
|
Energy, Department of | 2/23/2010 |
WASHINGTON TRU SOLUTIONS LLC | $988,390 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WHEELER ELECTRIC, INC. | $975,329 | Contract |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
Elks Creek Partners LLC | $924,100 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 12/20/2010 |
Peak Village | $915,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 12/22/2009 |
TERRANEAR PMC LLC | $862,312 | Contract |
Test Reactor Area 712 Retention Basin Deactiviation and Demolition
This spending item is part of a $1,742,753 allocation.
See details
|
Energy, Department of | 7/30/2010 |
BECHTEL BWXT IDAHO, LLC | $825,622 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
TARGHEE REGIONAL PUBLIC TRANSPORTATION AUTHORITY | $824,274 | Grant |
Formula Grants for Other Than Urbanized Areas Goal is to invest in Public Transportation in Idaho: Idaho's Rural program supports 1 prime recipient and 24 sub-recipients. The prime recipient has 3 statewide projects: develop a performance management system, develop a web-based mobility communication n ... Show more
This spending item is part of a $9,222,783 allocation.
See details
|
Transportation, Department of / Federal Transit Administration | 7/10/2009 |
FN Carlson & Associates, LLC | $812,776 | Contract |
This project will clean-up a variety of radiological contaminated facilities and structures, all a result of non-defense nuclear studies and projects performed at Brookhaven (BNL). Completion of this project supports DOE's major priority of legacy footpr
This spending item is part of a $70,809,616 allocation.
See details
|
Energy, Department of | 4/16/2009 |
TARGHEE REGIONAL PUBLIC TRANSPORTATION AUTHORITY | $783,500 | Grant | Federal Transit_Formula Grants Invest in public transportation by purchasing new vehicles and communication radios. The public bus terminal was up-graded by adding an automatic door opener for the ADA bathroom and additional emergency lighting was added. Due to safety issues with snow | Transportation, Department of / Federal Transit Administration | 6/19/2009 |
BONNEVILLE JOINT SCHOOL DISTRICT # 93 | $753,181 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $34,955,709 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 8/31/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $744,000 | Contract | Funding is provided to complete a Readiness Assessment for potential isotope production and processing capabilities at INL to enable the program to better meet the need for isotopes in short supply. | Energy, Department of | 6/29/2009 |
TRANSPORTATION, IDAHO DEPARTMENT OF | $721,474 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 6/29/2009 |
DAKR ENTERPRISES, LLC | $713,900 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 9/05/2009 |
WALTERS READY-MIX, INC. | $705,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Snake River Supply Inc. | $685,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 5/25/2010 |
ENVIROCON, INC | $649,287 | Contract |
Test Reactor Area 712 Retention Basin Deactiviation and Demolition
This spending item is part of a $1,742,753 allocation.
See details
|
Energy, Department of | 7/30/2010 |
SUNROC CONSTRUCTION CO., INC. | $598,765 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
COMMUNICATION DESIGNS INCORPORATED | $595,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Foothills Dental Care PLLC | $591,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 5/11/2010 |
URS SAFETY MANAGEMENT SOLUTIONS, L.L.C. | $590,300 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PS2 ASSOCIATES, L.L.C. | $579,500 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WALSH ENGINEERING SERVICES, PC | $577,831 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WESTERN STATES EQUIPMENT COMPANY | $559,100 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
EAGLE FEATHER CONSTRUCTION, INC. | $555,906 | Contract | Forest Wide Campground Toilet Replacement - USDA - Forest Service - (Golden, Colorado) - Project Location: Arapaho-Roosevelt National Forest - The intent of the contract is the removal of existing toilets, site grading, gravel pullouts, dumpster pads, new | Agriculture, Department of / Forest Service | 2/26/2010 |
WESTERN CONSTRUCTION, INC. | $555,000 | Contract |
Design and construct a gravel haul road roughly 13 miles in length on the Idaho National Labortory facility for Department of Energy Operations.
This spending item is part of a $6,235,364 allocation.
See details
|
Energy, Department of | 9/03/2010 |
BONNEVILLE, COUNTY OF | $550,000 | Grant |
Recovery Act - Eward Byrne Memorial Justice Assistance Grant (JAG) Program/ Grants to States and Territories The Idaho FY09 Recovery Act Edward Byrne Memorial Justice Assistance Grant (JAG) provides criminal justice funding to state and local jurisdictions, as well as non-profit organizations. JAGAG funds support all areas of the criminal justice system including... Show more
This spending item is part of a $7,141,560 allocation.
See details
|
Justice, Department of | 5/14/2009 |
IDAHO FALLS, CITY OF | $539,100 | Grant | Energy Efficiency and Conservation Block Grant Program (EECBG) The city of Idaho Falls will implement portions of its Energy Conservation Strategy with the EECBG funding: 1) Lighting retrofits of public buildings, 2) created printed materials for energy efficency techniques for historic preservation,n, 3) finish the la... Show more | Energy, Department of | 12/28/2009 |
TRANSPORTATION, IDAHO DEPARTMENT OF | $535,404 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grants | Transportation, Department of / Federal Highway Administration | 2/11/2010 |
YELLOWSTONE BUSINESS PARTNERSHIP | $535,000 | Grant |
Formula Grants for Other Than Urbanized Areas Goal is to invest in Public Transportation in Idaho: Idaho's Rural program supports 1 prime recipient and 24 sub-recipients. The prime recipient has 3 statewide projects: develop a performance management system, develop a web-based mobility communication n ... Show more
This spending item is part of a $9,222,783 allocation.
See details
|
Transportation, Department of / Federal Transit Administration | 7/10/2009 |
WESTERN STATES EQUIPMENT COMPANY | $533,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
IDAHO STATE BOARD OF EDUCATION | $527,132 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of | 5/25/2010 |
BATTELLE ENERGY ALLIANCE, LLC | $524,823 | Contract | There are two scopes of work on this project: 1) These ARRA funds are provided to Enhance and Accelerate Federal Energy Management Program (FEMP) Service Functions to the Federal Government. Idaho National Laboratory (INL) will provide technical assista | Energy, Department of | 9/08/2009 |
WESTERN STATES EQUIPMENT COMPANY | $522,160 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Broadway Arctic Circle LLC | $510,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 9/27/2010 |
Wendy's #6 Restaurant | $499,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 10/19/2009 |
JORDAN E. HIGHAM P.A. | $495,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 6/29/2009 |
Parkwest Dental Care | $486,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 10/27/2010 |
NORTH WIND REMEDIATION SERVICES, LLC | $467,371 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
RETREAT DAY SPA & SALON, LLC | $440,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 2/10/2011 |
CARTUS CORPORATION | $425,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CREATIVE ENGINEERS, INC. | $385,001 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Lee's Enterprises Inc. | $375,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 4/14/2010 |
PROJECT SERVICES GROUP, LLC | $370,000 | Contract | Industrial Safety Support | Energy, Department of | 12/30/2009 |
North Wind Environmental Solutions | $365,873 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
MCCORD ORTHODONTICS P.C. | $363,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 11/06/2009 |
COMMUNICATION DESIGNS INCORPORATED | $357,076 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PATRICK ENGINEERING INC. | $356,933 | Contract |
Design and construct a gravel haul road roughly 13 miles in length on the Idaho National Labortory facility for Department of Energy Operations.
This spending item is part of a $6,235,364 allocation.
See details
|
Energy, Department of | 9/03/2010 |
Marcom, LLC | $353,598 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Piano Gallery | $350,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/05/2009 |
COUNTY OF BONNEVILLE | $336,074 | Grant | Recovery Act - Edward Byrne Memorial Justice Assistance Grant (JAG) Program / Grants To Units Of Local Government Mobile Voice Data & Equipment Project. | Justice, Department of | 5/14/2009 |
BONNEVILLE, COUNTY OF | $336,074 | Grant | Recovery Act - Edward Byrne Memorial Justice Assistance Grant (JAG) Program / Grants To Units Of Local Government Adding or up-grading equipment to aid public safety and communications. Enhance investigative abilities to solve crime. Promontes officer anf community saftey | Justice, Department of | 5/14/2009 |
IDAHO MATERIAL HANDLING, INC. | $334,607 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $325,000 | Contract | This project (ARRA - Dev Integr Engy H2O DDS) is under the DOE/Federal Laboratories for G?Technical Support for Interconnection-Level Electric Infrastructure Planning, RC-BM-2010G? Area of Interest 3: Water/Energy Nexus. The lead laboratory is Sandia Nati | Energy, Department of | 9/02/2010 |
CLEANWORKS INC. | $325,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 12/30/2010 |
Leavitt Women's Health Care Corp P.C. | $324,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 4/21/2010 |
HONNEN EQUIPMENT CO. | $320,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
J. L. HARDY CONSTRUCTION, INC. | $312,225 | Contract | Swan Valley Restoration project on the Palisades Ranger District, Caribou-Targhee National Forest | Agriculture, Department of / Forest Service | 12/30/2009 |
BRUNSON CHIROPRACTIC, P.A. | $300,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/23/2009 |
INFORMATION SYSTEMS LABORATORIES, INC. | $296,402 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
EAGLE FEATHER CONSTRUCTION, INC. | $293,765 | Contract | Milner & Lud Drexler Comfort Station - USDA Forest Service - (Burley Field Office) - Twin Falls County, Idaho - The project consists of demolition and disposal of six vault toilets and the installation of nine new vault toilets at the recreation sites. | Interior, Department of / Bureau of Land Management | 1/25/2010 |
TAYLOR'S CROSSING PUBLIC CHARTER SCHOOL | $289,406 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act State Fiscal Stabilization Fund - Educational Grants, Recovery Funds for higher education and support of public elementary and secondary education (K-12) programs and services.
This spending item is part of a $201,699,682 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 5/22/2009 |
On The Rise Properties LLC | $289,100 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 10/28/2009 |
Elite Dental Care PLLC | $288,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 9/27/2010 |
Eagle Eye Produce Inc | $282,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 12/28/2010 |
MAJOR DRILLING AMERICA, INC. | $274,419 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Specialty Construction Supply LLC | $273,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 1/21/2010 |
Big O Tires | $271,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 5/03/2010 |
Legacy Dental PLLC | $268,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 9/27/2010 |
COMMUNITY COUNCIL OF IDAHO, INC. | $264,326 | Grant | ARRA Health Center Integrated Services Development Initiative[g1] ARRA-Capital Improvement Program. Community Council of Idaho operates a medical health clinic in Idaho Falls, Idaho and two satellite clinics in Blackfoot Idaho and Roberts Idaho. These funds will be used to purchase IT equipment to o help implement our e... Show more | Health and Human Services, Department of / Health Resources and Services Administration | 6/25/2009 |
QAL-TEK ASSOCIATES, L.L.C | $263,100 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 9/05/2009 |
WILLOWCREEK WOODWORKS, INC. | $262,700 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 6/18/2009 |
WESTERN STATES EQUIPMENT COMPANY | $257,396 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
The Black Swan LLC | $252,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 5/05/2010 |
IDAHO STATE BOARD OF EDUCATION | $251,270 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of | 5/12/2010 |
REHABAUTHORITY | $250,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/29/2009 |
WHITE PINE CHARTER SCHOOL | $247,915 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act State Fiscal Stabilization Fund - Educational Grants, Recovery Funds for higher education and support of public elementary and secondary education (K-12) programs and services.
This spending item is part of a $201,699,682 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 5/22/2009 |
CH2M WG IDAHO LLC | $241,560 | Contract |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
Copesetic Hobbies Inc. | $240,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 12/27/2010 |
Advanced Fuel Systems, LLC | $238,912 | Contract |
Upgrade/Replace Dlectrical Systems and Generators
This spending item is part of a $1,614,703 allocation.
See details
|
Department of Veterans Affairs | 3/23/2010 |
IDAHO STATE BOARD OF EDUCATION | $230,490 | Grant |
Program of Competitive Grants for Worker Training and Placement in High Growth and Emerging Industry Sectors Workforce training and placement in high growth and emerging industries.
This spending item is part of a $5,991,184 allocation.
See details
|
Employment and Training Administration | 1/29/2010 |
Innovative Investors, LLC DBA Mountain Val | $213,300 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 3/27/2009 |
North Wind Environmental Solutions | $211,742 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND REMEDIATION SERVICES, LLC | $205,044 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
WALTERS READY-MIX, INC. | $202,909 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $200,000 | Contract | There are two scopes of work for this project. 1) Idaho National Laboratory (INL) will provide direct Technical Assistance to the Energy Efficiency Conservation Block Grant (EECBG) Recovery Act recipients including assisting with developing and planning | Energy, Department of | 6/16/2009 |
Randall Orthodontics PA | $200,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/01/2009 |
MOUNTAIN WEST DERMATOLOGY | $200,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 5/14/2009 |
ADVANCED CO2 SYSTEMS LLC | $200,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 7/16/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $199,196 | Contract |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
EAGLE FEATHER CONSTRUCTION, INC. | $197,229 | Contract | Scab Creek Campground - DOI - Bureau of Land Management - (National Operations Center) - Sublette County, NE of Boulder, Wyoming - The project consists of clearing & grubbing, lineal grading, contructing turnouts and loop roads, and installation of the fo | Interior, Department of / Bureau of Land Management | 11/10/2009 |
CRITICAL INTELLIGENCE INC. | $196,176 | Grant |
Electricity Delivery and Energy Reliability, Research, Development and Analysis The goal of this project is to create a 12-week instructor-led online course that trains energy sector information security employees to detect and respond to targeting from and exploitation by sophisticated threat actorsrs. The training will fill gaps left... Show more
This spending item is part of a $463,176 allocation.
See details
|
Energy, Department of | 8/13/2010 |
A-CORE OF IDAHO INC | $190,534 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
COMMUNICATION DESIGNS INCORPORATED | $190,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
COUNTY OF BONNEVILLE | $177,100 | Grant | Energy Efficiency and Conservation Block Grant Program (EECBG) Recovery Act - Energy Efficiency & Conservation Block Grant Program | Energy, Department of | 9/28/2009 |
Mechanical System Solutions Group, LLC | $169,940 | Contract |
On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W
This spending item is part of a $1,315,784 allocation.
See details
|
Interior, Department of / U.S. Fish and Wildlife Service | 5/30/2009 |
POOLE SOFT WATER AND REFRIGERATION CO., IN | $161,500 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 6/04/2009 |
SHERYCK, LLC | $150,000 | Contract | Development of a Risk Assessment Framework for Detecting, Predicting, and Mitigating Aircraft Material Inspection. | National Aeronautics and Space Administration | 7/01/2010 |
WILLOWCREEK WOODWORKS, INC. | $150,000 | Loan | 7(a) Loan Guarantees PATRIOT EXPRESS | Small Business Administration | 6/19/2009 |
NORTH WIND REMEDIATION SERVICES, LLC | $149,639 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $187,503,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
HLS Hard-Line Solutions Usa, Inc. | $144,910 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CH2M WG IDAHO LLC | $136,998 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $600,418,168 allocation.
See details
|
Energy, Department of | 4/09/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $135,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $114,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND REMEDIATION SERVICES, LLC | $132,377 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Zirker Family Properties LLC and Zirker F | $130,600 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 10/22/2009 |
COMMUNITY COUNCIL OF IDAHO, INC. | $130,511 | Grant | ARRA Health Center Integrated Services Development Initiative[g1] This awards purpose is to Increase Services to our Health Clinic. We operate one health clinic in Idaho Falls Idaho, and two satelite clinics in Blackfoot Idaho and Roberts Idaho. These funds are being used to increase our services t to the Idaho Falls an... Show more | Health and Human Services, Department of / Health Resources and Services Administration | 3/27/2009 |
C.Q. FITNESS LLC. | $127,800 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 10/06/2010 |
EASTERN IDAHO COMMUNITY ACTION PARTNERSHIP, INC. | $124,207 | Grant | ARRA - Head Start Head Start 2009 ARRA COLA Quality Improvement Funding - The award provides for ARRA Cost of Living Adjustment (COLA), and Quality Improvement Funding consistent with the provisions of Section 640(a)(5) of the Head Start Act for the Head Start program. He | Health and Human Services, Department of / Administration for Children and Families | 6/02/2009 |
WALSH ENGINEERING SERVICES, PC | $122,891 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND, INC. | $120,691 | Contract |
Recovery Act Project Hanford Tank Farms Permitting Support at Office of River Protection
This spending item is part of a $900,000 allocation.
See details
|
Energy, Department of | 9/15/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $120,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WHEELER ELECTRIC, INC. | $119,007 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WESTERN STATES EQUIPMENT COMPANY | $113,054 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
OWEN DENTAL PC | $113,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 4/14/2010 |
PRO RENTALS & SALES, INC. | $112,110 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WALTERS READY-MIX, INC. | $111,820 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
EG&G TECHNICAL SERVICES, INC. | $111,485 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
NORTH WIND, INC. | $110,530 | Contract |
Provide support to the DOE-EM ARRA Team in defining, establishing, implementing, and tracking the projects funded by the Recovery Act.
This spending item is part of a $2,286,664 allocation.
See details
|
Energy, Department of | 6/24/2009 |
WHEELER ELECTRIC, INC. | $110,374 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
IDAHO FALLS, CITY OF | $109,234 | Grant | Community Development Block Grant ARRA Entitlement Grants (CDBG-R)(Recovery Act Funded) additional funding to create jobs and improve services. | Housing and Urban Development, Department of | 8/28/2009 |
NORTH WIND, INC. | $107,622 | Contract | Environmental Assessment for Grasshopper and Mormon Cricket Suppression in Wyoming | Interior, Department of / Bureau of Land Management | 3/05/2010 |
Snake River Printing Company | $106,200 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 3/31/2009 |
SUMMITT FORESTS INC | $106,128 | Contract | CROOKED CRAB PRE-COMMERCIAL THINNING | Interior, Department of / Bureau of Land Management | 6/15/2010 |
PHENIX OF IDAHO, INC. | $103,882 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
Evan O Johnson dba Sunnyside Dental Care | $103,500 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 6/22/2009 |
WHEELER ELECTRIC, INC. | $102,890 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
RED, INC. | $100,800 | Contract | Writing, editing and web posting for additional year. | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
AMMON, CITY OF | $100,413 | Grant |
Energy Efficiency and Conservation Block Grant Program (EECBG) THE PURPOSE OF THIS AWARD IS TO IMPLEMENT THE RECIPIENT'S ENERGY EFFICIENCY AND CONSERVATION STRATEGY (EEC&S) IN ORDER TO REDUCE FOSSIL FUEL EMISSIONS; REDUCE TOTAL ENERGY USE OF THE ELIGIBLE ENTITIES; AND IMPROVE ENERGY EFFICIENCY IN THEHE BUILDING SECTOR,... Show more
This spending item is part of a $9,593,500 allocation.
See details
|
Energy, Department of | 9/29/2009 |
Peacepipe Construction & Fabrication In | $100,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 9/15/2009 |
EAGLE ROCK ENGINEERING & LAND SURVEYING P | $100,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 10/19/2009 |
3d Fire Protection, Inc | $99,679 | Contract |
This is a Firm Fixed Price contract for the construction and construction management services of the ARP VII Facility and Ancillary Structures over Pit 10 West at the RWMC, at the Idaho National Laboratory. The tasks being performed in the SDA at the RWM
This spending item is part of a $13,993,703 allocation.
See details
|
Energy, Department of | 7/30/2010 |
MCS LLC | $97,119 | Contract |
The Recovery Act projects undertaken by Washington TRU Solutions LLC, have the following goals: - To accelerate TRU waste characterization and disposal shipments of transuranic (TRU) waste from U.S. Department of Energy (DOE) TRU waste generator/storage s
This spending item is part of a $150,748,018 allocation.
See details
|
Energy, Department of | 4/15/2009 |
COMMUNICATION DESIGNS INCORPORATED | $96,609 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PROJECT SERVICES GROUP, LLC | $92,366 | Contract | Radiological Safety Oversight Support | Energy, Department of | 1/28/2010 |
COMMUNICATION DESIGNS INCORPORATED | $91,400 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
CH2M WG IDAHO LLC | $85,698 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $315,663,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
EASTERN IDAHO SPECIAL SERVICES AGEN | $85,503 | Direct P | Section 8 Housing Assistance Payments Program Special Allocations (Recovery Act Funded) Contract Svs S8 Funds | Housing and Urban Development, Department of / Federal Housing Commissioner | 3/20/2009 |
IDAHO FALLS SCHOOL DISTRICT NO. 91 EDUCATION FOUNDATION, INC. | $85,233 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a StateG??s discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $2,268,765 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
WESTERN STATES EQUIPMENT COMPANY | $84,818 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
IDAHO STATE BOARD OF EDUCATION | $83,940 | Direct P | Federal Pell Grant Program GRANT PROGRAM | Education, Department of | 5/15/2009 |
Help Inc | $83,580 | Grant |
Recovery Act - State Victim Assistance Formula Grant Program Enacted in 1984, the Victims of Crime Act (VOCA) is the central source of federal financial support for direct services to victim of crime. VOCA is administered at the federal level through the U.S. Department of Justice, Office for Victimsms of Crime which... Show more
This spending item is part of a $601,000 allocation.
See details
|
Justice, Department of | 4/24/2009 |
SUMMITT FORESTS INC | $83,062 | Contract | MOOSE PROJECT-SLASHING, HAND PILE AND COVER | Interior, Department of / Bureau of Land Management | 4/01/2010 |
PORTAGE, INC. | $81,379 | Contract |
$37,000,000 was awarded on 7/24/2009 as a result of the American Recovery and Reinvestment Act signed in to law by President Obama in February of 2009. The intent of these funds was to provide jobs and accelerate the decontamination, demolition, character
This spending item is part of a $44,800,000 allocation.
See details
|
Energy, Department of | 7/24/2009 |
3d Fire Protection, Inc | $80,174 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
ALPHATRAC, INC. | $80,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BONNEVILLE INDUSTRIAL SUPPLY CO. | $79,777 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BONNEVILLE JOINT SCHOOL DISTRICT # 93 | $79,594 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a StateG??s discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $2,268,765 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
Rooftop Real Estate Management Inc. | $78,000 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | 10/30/2009 |
ARNOLD MACHINERY COMPANY | $75,600 | Contract |
General Description: Accelerate the processing and disposal of contract-handled (CH) transuranic (TRU) waste and (mixed) low level waste (MLLW/LLW) from the Idaho National Laboratory (INL). Detailed Description: April 13, 2009 through September 30, 2
This spending item is part of a $22,500,000 allocation.
See details
|
Energy, Department of | 4/13/2009 |
LEAVITT WOMEN'S HEALTH CARE CORP, P.C. | $75,000 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 4/27/2009 |
BATTELLE ENERGY ALLIANCE, LLC | $75,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WALSH ENGINEERING SERVICES, PC | $74,000 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
SWAN VALLEY SCHOOL DISTRICT 92 | $73,338 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act State Fiscal Stabilization Fund - Educational Grants, Recovery Funds for higher education and support of public elementary and secondary education (K-12) programs and services.
This spending item is part of a $201,699,682 allocation.
See details
|
Education, Department of / Office of Elementary and Secondary Education | 5/22/2009 |
THORNE & ASSOCIATES | $69,525 | Contract |
The contractor shall, in accordance with the terms of this contract, provide the personnel, materials, supplies, and services and do all things necessary for, or incident to, providing its best efforts to perform the Recovery Act work. The work as identif
This spending item is part of a $272,414,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
THORNE & ASSOCIATES | $67,500 | Contract |
The trenches at 618-10 have long been regarded as some of Hanford's worst waste sites. Using ARRA funds, WCH will characterize the site. Intrusive and non-intrusive techniques will be used, and the subsequent analysis of data will enable the project to
This spending item is part of a $76,754,000 allocation.
See details
|
Energy, Department of | 4/09/2009 |
Paramount Supply Company, Inc. | $66,530 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |
BONNEVILLE INDUSTRIAL SUPPLY CO. | $65,221 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
WHITE PINE CHARTER SCHOOL | $64,813 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of IDEA.
This spending item is part of a $53,247,375 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
TAYLOR'S CROSSING PUBLIC CHARTER SCHOOL | $63,068 | Grant |
Special Education Grants to States, Recovery Act Assist States in providing special education and related services to children with disabilities in accordance with Part B of IDEA.
This spending item is part of a $53,247,375 allocation.
See details
|
Education, Department of / Office of Special Education and Rehabilitative Services | 4/01/2009 |
CH2M WG IDAHO LLC | $62,665 | Contract |
Test Reactor Area 712 Retention Basin Deactiviation and Demolition
This spending item is part of a $1,742,753 allocation.
See details
|
Energy, Department of | 7/30/2010 |
Reliance Testing & Inspection, Inc | $62,640 | Contract |
Design and construct a gravel haul road roughly 13 miles in length on the Idaho National Labortory facility for Department of Energy Operations.
This spending item is part of a $6,235,364 allocation.
See details
|
Energy, Department of | 9/03/2010 |
ALYCE CLEGG PHOTOGRAPHER LLC | $62,200 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | 12/22/2009 |
WESTERN STATES EQUIPMENT COMPANY | $59,157 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $199,947,354 allocation.
See details
|
Energy, Department of | 4/13/2009 |
PRO RENTALS & SALES, INC. | $57,495 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of leg
This spending item is part of a $108,306,297 allocation.
See details
|
Energy, Department of | 4/13/2009 |