Hennepin County, Minn., funds by Interior, Department of
Listing $2,448,031.98 in stimulus funds from Interior, Department of for Hennepin
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
XIOTECH CORPORATION | $549,000 | Purchase of Storage Area Network (SAN) System - Denver, Colorado | National Park Service | 11/17/2009 |
CATERPILLAR INC. | $345,643 | Purchase of 1 x AP655D Caterpillar Asphalt Paver with requested delivery date of 1/31/2010. Caterpillar issued a PO to our Dealer to assist with pre-delivery inspection and delivery of the equipment. Although we have invoiced the Government for the equi | Indian Affairs (Assistant Secretary) | 9/30/2009 |
PRICEWATERHOUSECOOPERS LLP | $212,000 | PwC was engaged to assist the FWS Region 3 regional office with program monitoring related to the Recovery Act. Specific tasks include planning, documentating and testing of internal controls related to financial and acquisition activities in the region. | U.S. Fish and Wildlife Service | 3/09/2010 |
ERICKSON BUILDERS & CO. INC. | $192,636 | Open to all competition | U.S. Fish and Wildlife Service | 9/25/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $140,439 | Contractor shall provide all tools, equipment, materials, labor, supervision and Transportation for Phase 111. FWS Region 3, requires A-E services for the final design of improvements to existing dikes, ditches and roadways within the Agassiz National Wi | U.S. Fish and Wildlife Service | 1/29/2010 |
CATERPILLAR INC. | $118,653 | Purchase of 1 x CB564D Caterpillar Vibratory Asphalt compactor with requested delivery date of 1/31/2010. Caterpillar issued a PO to our Dealer to assist with pre-delivery inspection and delivery of the equipment. Although we have invoiced the Governmen | Indian Affairs (Assistant Secretary) | 9/30/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $115,564 | Site Investigation - Site Investigation includes topographical survey, geotechnical report, and Hydrology/Hydraulics Analysis for eight proposed projects located at the Agassiz National Wildlife Refuge. Contractor shall provide all labor, tools, equipmen | U.S. Fish and Wildlife Service | 10/21/2009 |
RSM MCGLADREY, INC. | $90,396 |
The Broadband Technology Opportunities Program (BTOP) is a new competitive grant program that will enable consumers and businesses in unserved and underserved areas of the United States to access broadband services. Booz Allen Hamilton supports an end-to
This spending item is part of a $75,221,785 allocation.
See details
|
Office of Policy, Management and Budget/Chief Financial Officer | 8/03/2009 |
NATIONAL COUNCIL FOR SCIENCE AND THE ENVIRONMENT, THE | $67,500 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. to introduce culturally-diverse college students to natural resource careers through internships with the U. S. Fish and Wildlife Service in the Midwest Region (also known as Region 3 ofFWS). | U.S. Fish and Wildlife Service | 5/11/2010 |
STANLEY CONSULTANTS, INC. | $67,354 | TAS::14 1610::TAS, FFS PROJECT R3GG. A/E SERVICES, PHASE II AND PHASE III, CHAUTAUQUA LAKE PERIMETER LEVEE REPAIR PROJECT, CHAUTAUQUA NATIONAL WILDLIFE REFUGE, HAVANA, IL. | U.S. Fish and Wildlife Service | 2/11/2010 |
STANLEY CONSULTANTS, INC. | $59,545 | TAS::14 1613::TAS, FFS PROJECT R3BC. A/E SERVICES, PHASE II AND PHASE II, EROSION REPOAIR, GUTTENBURG MOIST SOIL UNIT DIKES, UPPER MISSISSIPPI RIVER MCGREGOR DISTRICT, MCGREGOR, IA. | U.S. Fish and Wildlife Service | 1/30/2010 |
PROGRESSIVE CONSULTING ENGINEERS INC | $58,968 | A/E Services to provide concrete testing, soils testing and to develop plans, specifications, and cost estimates to rehabilitate the Radial Gate Structure according to requirements shown in Phase 1 Report. | U.S. Fish and Wildlife Service | 12/22/2009 |
STRATFORD COMPANIES, THE | $53,153 | Various Textbooks | Indian Affairs (Assistant Secretary) | 4/19/2010 |
PLATO LEARNING | $41,595 | Wingate HS Educational Program | Indian Affairs (Assistant Secretary) | 4/16/2010 |
CONSERVATION CORPS | $40,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Minnesota Conservation Corps received $40,000 through USFWS to remove undesirable woody vegetation in a Hazardous Fuels Reduction project in an oak savannah community on the Minnesota Valley National Wildlife Refuge in Carver, Dakakota, Hennepin, and Scott ... Show more | U.S. Fish and Wildlife Service | 2/01/2010 |
STANLEY CONSULTANTS, INC. | $36,653 |
TAS::14 1610::TAS, FFS PROJECT R3GW. A/E SERVICES. HENNEPIN PHASE II AND PHASE III, GILBERT LAKE OUTLET DITCH CLEANOUT PROJECT LOCATED AT THE TWO RIVERS NWR, BRUSSELS, IL.
This spending item is part of a $53,149 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/10/2010 |
TOYOTA-LIFT OF MINNESOTA INC. | $34,223 | Toyota 7FGKU40 forklift | National Park Service | 2/05/2010 |
SRF CONSULTING GROUP, INC. | $33,642 | Topographical and Geotechnical Investigations for site surveys and borings for new administration/visitor buildings, roads, parking lots and associated facilities for Upper Mississippi National Wildlife & Fish Refuge Onalaska WI and Mingo National Wildlif | U.S. Fish and Wildlife Service | 7/31/2009 |
PENNAZ, TERRY | $31,640 | Provides engineering consultant services for Regional Headquarters on an as-needed basis. This may include engineering design, construction management, review of plans and specifications, preparation of scope of services, and other engineering services. | U.S. Fish and Wildlife Service | 12/22/2009 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Commercial logging service for havardous fuel reduction ay the MN Valley National Wildlife Refuge | U.S. Fish and Wildlife Service | 9/25/2009 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Commercail logging services for the mechanical treatments for hazardous fuel reductions | U.S. Fish and Wildlife Service | 11/25/2009 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Hazardous Fuel Reduction in MN Valley National Wildlife Refuge | U.S. Fish and Wildlife Service | 9/25/2009 |
WEIDT GROUP, INC., THE | $14,875 |
Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation.
See details
|
Bureau of Land Management | 9/22/2009 |
ANDERSON ENGINEERING OF MN LLC | $12,589 |
TAS::14 1610::TAS, FFS PROJECT R3GW. A/E SERVICES. HENNEPIN PHASE II AND PHASE III, GILBERT LAKE OUTLET DITCH CLEANOUT PROJECT LOCATED AT THE TWO RIVERS NWR, BRUSSELS, IL.
This spending item is part of a $53,149 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/10/2010 |
STANLEY CONSULTANTS, INC. | $12,326 | RECOVERY: FFS PROJECT R3GW AND R3GG, TAS::14 1610::TAS. A/E SERVICES, PHASE I FOR CHATAUQUA LAKE PERIMETER LEVEE REPAIR, HAVANA, IL AND GILBERT LAKE OUTLET DITCH CLEANOUT, BRUSSELS, IL. | U.S. Fish and Wildlife Service | 11/16/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $12,279 | National Trails System Projects Site Investigation, Replacement of Water Lines, Marion, IL. Task Order No. 301818Y096 is issued for Architect Engineering services consisting of a site investigation to update an existing water plan and to develop a plan for water lines and distribution | U.S. Fish and Wildlife Service | 6/25/2008 |
PROGRESSIVE CONSULTING ENGINEERS INC | $6,745 | Site visit for Phase 1 A/E design services for Water Management Ditch Rehabilitation project, Aggassiz NWR, Middle River, MN | U.S. Fish and Wildlife Service | 7/23/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $5,286 | Phase 1 Site Visit. A/E Services to perform an initial Phase 1 Site Visit regarding the construction of a new Radial Gate Structure at Squaw Creek NWR. | U.S. Fish and Wildlife Service | 7/17/2009 |
BRAUN INTERTEC CORPORATION | $827 |
Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/06/2010 |