Eddy County, N.M., funds by Interior, Department of
Listing $1,829,484.46 in stimulus funds from Interior, Department of for Eddy
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
K.D. HUEY COMPANY, LLC | $444,680 | RECOVERY- Seven Rivers Brantley Dam Mitigation | Bureau of Reclamation | 6/08/2010 |
GLOBAL FRONTLINE SOLUTIONS LLC | $299,724 | Grassland Restoration Champion Canyon. Slash, hand pile, and cover juniper. 50 miles west of Artesia, NM. | Bureau of Land Management | 4/14/2010 |
GLOBAL FRONTLINE SOLUTIONS LLC | $228,030 | Grassland Restoration Buckhorn Juniper. Slashing, lop, and scatter of juniper. 50 miles west of Artesia, NM. | Bureau of Land Management | 4/14/2010 |
Mbf Services Inc | $180,385 |
CAVE-116245-Structural Repair and Lead Based Paint Abatement in Elevator Shaft at Carlsbad Caverns National Park, NM. Provide costruction management oversight for structural repoar and lead based paint abatement.
This spending item is part of a $196,974 allocation.
See details
|
National Park Service | 8/26/2010 |
URS GROUP, INC. | $161,948 |
Design and construct solar wildlife water collection system including water well pumps and booster stations, numerous tanks, localized fencing. Over 33 miles of small-diameter (1.5) water line and tanks for multiple systems in various locations.
This spending item is part of a $1,202,335 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/19/2010 |
ANDERSON HALLAS ARCHITECTS, PC | $143,075 |
The elevator system at Carlsbad Caverns exist in two 750-foot vertical shafts, drilled and blasted through limestone rock, into the underground cavern space. The older and smaller shaft houses freight elevators 1and 2. The newer and larger shaft houses
This spending item is part of a $335,202 allocation.
See details
|
National Park Service | 9/07/2010 |
PARAMETRIX, INC. | $139,939 | Survey of 2,240 acres in Eddy and Chavez Counties | Bureau of Land Management | 3/31/2010 |
CENTER OF EXCELLENCE FOR HAZARDOUS MATERIALS MANAGEMENT | $117,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. This Award (Cooperative Agreement) is being implemented in order for the Service and the Cooperator to work together on privately owned lands for the purpose of improving native short-grass sand scrub, sand dunes, and desert grassssland habitats of southeas... Show more | U.S. Fish and Wildlife Service | 7/21/2009 |
ANDREWS AND ANDERSON ARCHITECT PC | $37,520 |
This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park
This spending item is part of a $227,533 allocation.
See details
|
National Park Service | 11/24/2009 |
CROUCH PLUMBING, HEATING, AND AIR CONDITIONING, INC. | $27,450 | Provide and Install HVAC units with 10 year extended warranties on compressors, Carlsbad Caverns National Park, NM | National Park Service | 2/02/2010 |
ANDREWS AND ANDERSON ARCHITECT PC | $18,881 |
This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. This specific Task Order is concerned with developing the Schematic Design drawings t
This spending item is part of a $116,929 allocation.
See details
|
National Park Service | 9/04/2009 |
HDR ENGINEERING, INC. | $16,589 |
CAVE-116245-Structural Repair and Lead Based Paint Abatement in Elevator Shaft at Carlsbad Caverns National Park, NM. Provide costruction management oversight for structural repoar and lead based paint abatement.
This spending item is part of a $196,974 allocation.
See details
|
National Park Service | 8/26/2010 |
ANDERSON HALLAS ARCHITECTS, PC | $14,063 |
This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park
This spending item is part of a $115,067 allocation.
See details
|
National Park Service | 9/03/2010 |
ANDREWS AND ANDERSON ARCHITECT PC | $201 |
Services required to take part in a pre-proposal contractor walkthrough for the Structural Repair and Lead Based Paint Abatement in the Primary Visitor Elevator shafts at Carlsbad Caverns National Park. Consultants from the A/E team were present on site
This spending item is part of a $9,433 allocation.
See details
|
National Park Service | 3/17/2010 |