Jefferson County, Ore., funds by Interior, Department of
Listing $6,633,039.25 in stimulus funds from Interior, Department of for Jefferson
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $2,577,383 | Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a | Indian Affairs (Assistant Secretary) | 3/18/2010 |
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $2,165,826 |
Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a
This spending item is part of a $2,577,383 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/18/2010 |
GENERAL INDUSTRIES, INC | $893,579 |
Rehabilitate Water Pumps and Motors at Warm Springs NFH. Replace existing Motor Starters with Variable Frequency Drives. Replacement of the main service switchboard (in place) adn switchoard B&C. Replacement of the generator paralleling/synchronizing g
This spending item is part of a $1,007,771 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/23/2010 |
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $618,559 |
Highway Planning and Construction The Project will provide for construction of Sid Walter Culvert Replacement in accordance with ODOT specification (FP Manual). The total construction length for this project is 0.40 KM on the Warm Springs Indian Reservation, Oregon.
This spending item is part of a $643,879 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/21/2010 |
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $213,501 |
Highway Planning and Construction The Project will provide for construction of West Hills Pedestrian Improvements in accordance with ODOT specification. The total construction length for this project is 1.11 miles on the Warm Springs Indian Reservation, Oregon.
This spending item is part of a $372,404 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/21/2010 |
BURTON CONSTRUCTION, INC. | $114,192 |
Rehabilitate Water Pumps and Motors at Warm Springs NFH. Replace existing Motor Starters with Variable Frequency Drives. Replacement of the main service switchboard (in place) adn switchoard B&C. Replacement of the generator paralleling/synchronizing g
This spending item is part of a $1,007,771 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/23/2010 |
COUNTY OF JEFFERSON | $25,000 | Fish Wildlife Plant Con.Mgmt. | Bureau of Land Management | 3/12/2010 |
COUNTY OF JEFFERSON | $25,000 | Fish, Wildlife and Plant Conservation Resource Management Wild and Scenic River in Jefferson | Bureau of Land Management | 3/12/2010 |