Marion County, Ore., funds by Interior, Department of
Listing $2,758,877.60 in stimulus funds from Interior, Department of for Marion
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FIRST CASCADE CORP. | $849,000 | Salem Windows, Skylights and Entrance Replacement at the BLM District Office in Salem, Oregon | Bureau of Land Management | 6/22/2010 |
EMERICK CONSTRUCTION CO INC | $487,666 |
Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/24/2009 |
DOYON PROJECT SERVICES LLC | $384,885 |
Recovery-Wildwood Recreation Site Waterline Replacement, Salem District, Oregon. Replace 5800 lineal feet of water main and 5000 feet of branch lines using open cut trenching and horizontal boring.
This spending item is part of a $529,800 allocation.
See details
|
Bureau of Land Management | 6/25/2010 |
TORNADO SOFT EXCAVATION | $225,101 | Alsea Falls Waterline Replacement, Salem District, Oregon | Bureau of Land Management | 6/17/2010 |
FISH AND WILDLIFE, OREGON DEPARTMENT OF | $196,599 | The US Fish and Wildlife Service (USFWS) Malheur National Wildlife Refuge will contract to design and construct fish screen and passage facilities to reconnect 60 miles of native fish (redband trout) habitat. The Oregon Department of Fish and Wildlife (O | U.S. Fish and Wildlife Service | 10/01/2009 |
FISH AND WILDLIFE, OREGON DEPARTMENT OF | $196,599 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The US Fish and Wildlife Service (USFWS) Malheur National Wildlife Refuge will contract to design and construct fish screen and passage facilities to reconnect 60 miles of native fish (redband trout) habitat. The Oregon Departmenent of Fish and Wildlife (O... Show more | U.S. Fish and Wildlife Service | 10/01/2009 |
EMERICK CONSTRUCTION CO INC | $96,216 |
Lighting upgrades to the main classroom building, auditorium, gymnasium and installation of exterior lighting at Chemawa Indian School.
This spending item is part of a $308,228 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/21/2009 |
MCP COMPUTER PRODUCTS INC. | $81,598 | 1) DELL OPTIPLEX 790 MINI TOWER (#225-0782) - QTY 25 2) DELL LATITUDE E6420 (#225-0368) - QTY 50 | Indian Affairs (Assistant Secretary) | 9/23/2011 |
MARION CONSTRUCTION COMPANY | $78,800 |
Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/24/2009 |
H. D. FOWLER CO., INC. | $73,715 |
Recovery-Wildwood Recreation Site Waterline Replacement, Salem District, Oregon. Replace 5800 lineal feet of water main and 5000 feet of branch lines using open cut trenching and horizontal boring.
This spending item is part of a $529,800 allocation.
See details
|
Bureau of Land Management | 6/25/2010 |
Trenchless Construction Services LLC | $71,200 |
Recovery-Wildwood Recreation Site Waterline Replacement, Salem District, Oregon. Replace 5800 lineal feet of water main and 5000 feet of branch lines using open cut trenching and horizontal boring.
This spending item is part of a $529,800 allocation.
See details
|
Bureau of Land Management | 6/25/2010 |
Bear Electric, Inc. | $9,830 |
The purpose of this project is to install Tier I energy upgrade to various buildings at the Tualatin River NWR> The scope of the work includes: installing new entrance doors, windows and insulation to two residence quarters and installing high efficiency
This spending item is part of a $36,550 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/30/2010 |
Oregon Cascade Plumbing & Heating, Inc. | $7,668 |
Relocate existing house. New 725 S.F. living structure designed as a 'Zero Energy' unit using SIPS. An additional 625 S.F. support space is attached. An air-to-air heat exchanger will be installed on this super-tight house. Includes a Photvolotaic sy
This spending item is part of a $294,528 allocation.
See details
|
National Park Service | 4/30/2010 |