Snohomish County, Wash., funds by Interior, Department of
Listing $4,623,832.28 in stimulus funds from Interior, Department of for Snohomish
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
REECE TRUCKING & EXCAVATING | $1,663,855 |
Highway Planning and Construction Improvement of 27th Avenue NE from 88th Street NE to Marine Drive including roadway widening, sidewalk installation, drainage improvements, the installation of water main and associated valving, installation of sanitary sewer force main, asphalt concrete
This spending item is part of a $1,895,481 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/01/2010 |
REECE TRUCKING & EXCAVATING | $1,536,211 |
Improvement of 27th Avenue NE from 88ty Street NE to Marine Drive including roadway widening, sidewalk installation, drainage improvements, the installation of water main and associated valving, installation of sanitary sewer force main, asphalt concrete
This spending item is part of a $1,895,481 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/01/2010 |
THE TULALIP TRIBES OF WASHINGTON | $359,270 |
Improvement of 27th Avenue NE from 88ty Street NE to Marine Drive including roadway widening, sidewalk installation, drainage improvements, the installation of water main and associated valving, installation of sanitary sewer force main, asphalt concrete
This spending item is part of a $1,895,481 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/01/2010 |
FARMERS ELECTRIC DESIGN AND CONSTRUCTION LLC | $273,427 |
Provide planning, design and construction services in accordance with USFWS Region 1 & 8 General Engineering Requirements, as further defined and expanded upon in the solicitation and its amendments, to repair or replace, as needed, the main electric serv
This spending item is part of a $334,341 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/21/2009 |
Five Star Construction Still Inc | $260,900 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
THE TULALIP TRIBES OF WASHINGTON | $231,626 |
Highway Planning and Construction Improvement of 27th Avenue NE from 88th Street NE to Marine Drive including roadway widening, sidewalk installation, drainage improvements, the installation of water main and associated valving, installation of sanitary sewer force main, asphalt concrete
This spending item is part of a $1,895,481 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/01/2010 |
THE TULALIP TRIBES OF WASHINGTON | $111,330 | ARRA Child Care and Development Block Grant CHILD CARE AND DEVELP0MENT FUND STIMULUS - FOR LOW INCOME FAMILIES - | Indian Affairs (Assistant Secretary) | 9/30/2009 |
THE TULALIP TRIBES OF WASHINGTON | $110,620 | ARRA Child Care and Development Block Grant CHILD CARE AND DEVELP0MENT FUND STIMULUS - FOR LOW INCOME FAMILIES | Indian Affairs (Assistant Secretary) | 9/30/2009 |
PACIFIC GEOMATIC SERVICES, INC. | $32,163 | Provided site topography covering an area approximately 7.1 acres in size lying within the area of an existing fish hatchery. The survey coverage included an Adult Trap and Holding Pond, Juvenile Ponds, utilities and paved areas. Structure details were co | Bureau of Reclamation | 6/18/2009 |
SAUK SUIATTLE INDIAN TRIBAL COUNCIL | $29,780 | Highway Planning and Construction purchase of transit van | Indian Affairs (Assistant Secretary) | 9/22/2010 |
J. NEWELL CORPORATION | $9,208 | Square aluminum fish screens for fish hatchery | U.S. Fish and Wildlife Service | 11/23/2009 |
Innovative Vacuum Services, Inc. | $5,442 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |