Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MCMILLEN, LLC | $1,464,695 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
Guerdon Enterprises, LLC | $586,046 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
EDEN VALLEY IRRIGATION & DRAINING DISTRICT | $545,120 | Colorado River Basin Salinity Control Program This project was for the Farson/Eden Pipeline Project Phase IIIm M-1 & M-1B Laterals which will result in a total annual reduction of 407 tons of salt. | Bureau of Reclamation | 8/25/2009 |
GREEN RIVER GREENBELT TASK FORCE | $270,000 | Upper Colorado River Basin Fish and Wildlife Mitigation Program. Killdeer Wetlands Restoration Project - To construct a dam to raise the water level in the Green River to reestablish flow to original oxbows and braids and restore an old wetland. | Interior, Department of | 12/01/2009 |
LEWIS & LEWIS, INC. | $242,086 |
Removing an existing wooden bridge, installing a new precast concrete box culvert, and resurfacing the existing road with either gravel or asphalt.
This spending item is part of a $304,106 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/24/2010 |
WEBER DRILLING | $108,664 | Drill new wells for scab Crk. Campground, near Pinedale Wyoming | Bureau of Land Management | 6/09/2010 |
GREEN RIVER GREENBELT TASK FORCE | $95,000 | Fish, Wildlife and Plant Conservation Resource Management Killdeer Wetlands Restoration Construction of dam to divert 5 cfs to flood an old oxbox and braids of the Green River to restore a wetland that existed before the Fontenelle resevoir was created. | Bureau of Land Management | 4/22/2010 |
HIGH COUNTRY CONSTRUCTION, INC. | $95,000 | Supply and Haul 3 foot boulders to Seedskadee NWR | U.S. Fish and Wildlife Service | 8/04/2010 |
RAASS BROTHERS INC. | $84,305 | Contractor shall furnish all supervision, labor, material, equipment, and supplies necessary to complete the construction. The construction will be asphalt paving, removal, and replacement of the concrete sidewalk. | Bureau of Land Management | 11/05/2009 |
URS GROUP, INC. | $62,020 |
Removing an existing wooden bridge, installing a new precast concrete box culvert, and resurfacing the existing road with either gravel or asphalt.
This spending item is part of a $304,106 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/24/2010 |
Thermal West Industrial, Inc. | $57,000 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
NATURE'S ENHANCEMENT INC | $50,667 | Green River Riparian-Cottonwood Restoration - Purchase and Plant Cottonwood Trees | U.S. Fish and Wildlife Service | 4/13/2010 |
BAKER PROJECT CONSULTING, LLC | $50,144 | The U.S. Fish and Wildlife Service, Region 6 requirement is to provide construction inspection services associated with the construction of three modular residences and a modular bunkhouse at Seedskadee NWR. | U.S. Fish and Wildlife Service | 3/15/2010 |
LONGHORN CONSTRUCTION, INC. | $30,882 |
INSTALLATION OF ROAD DRAINAGE SYSTEM
This spending item is part of a $47,045 allocation.
See details
|
Bureau of Land Management | 6/03/2010 |
A. PLEASANT CONSTRUCTION, INC. | $16,163 |
INSTALLATION OF ROAD DRAINAGE SYSTEM
This spending item is part of a $47,045 allocation.
See details
|
Bureau of Land Management | 6/03/2010 |
JFC ENGINEERS & SURVEYORS | $10,700 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $8,600 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The award funds services to the Seedskadee National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation n service projects. Two int... Show more | U.S. Fish and Wildlife Service | 9/22/2009 |
DC Engineering | $6,800 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
JFC ENGINEERS & SURVEYORS | $5,970 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
Thermal West Industrial, Inc. | $2,000 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.