Detailed Record
Nad 'Ali Culvert Project
Planned Start Month
July 2011
Estimated Cost
$9,500
Status
Completed
Province
Helmand
Regional Command
RC-SouthWest
Project Description
No project description provided.
Project Goals
The damage to the culvert was caused by driving over the culvert which then crushed the culvert. The damage to the bridge and irrigation ditch was caused when the linebacker overturned on to its side, thus causing damage to the irrigation ditch. The recovery of this vehicle damaged the bridge. Urgent action is required to stop the water from overflowing into the Shamal Storrai village, and also flooding the local farm lands. The people of Shamel Storrai will benefit from the proposed work. The contractor who will be employed will employ 100% Afghans to reconstruct the culvert, ditch, and bridge. The start date and finish date can not be presumed until authority has been given for this task and no other agencies have been contacted to help this project. The upkeep of this task after the work has been finished will be the responsibility of the local people from Shamal Storrai. GIRoA will not contribute to this because this was caused by a US callsign.
Results
Results unknown.
Updates
No updates provided.
SOURCES
Illustrations: Sarah Way for ProPublica. Data: Assembled from several different Department of Defense databases by the Special Inspector General for Afghanistan Reconstruction and provided to ProPublica under a Freedom of Information Act Request.