Sara village karez irrigation system and water basin improvements
Planned Start Month
April 2011
Estimated Cost
$42,000
Status
Canceled / Terminated
Province
Wardak
Regional Command
RC-East
Project Description
No project description provided.
Project Goals
This project will reconstruct 1 water storage basin with 20cm of clay lining with stone masonry sides. In addition there will be 18 water control head gates installed throughout the entire irrigation system, repair 4 erosion damaged areas, and line 3km of canal with 70cm half round preformed concrete pipe.
Results
Results unknown.
Updates
25 April 2011, New project docs uploaded onto Ghazni Server Unfunded PR&C, Approval ADR, LOJ, Cost Estimate, Cost Meth, SOW, Draft CERP Contract, MOA, LUA and Approval Checklist.
SOURCES
Illustrations: Sarah Way for ProPublica. Data: Assembled from several different Department of Defense databases by the Special Inspector General for Afghanistan Reconstruction and provided to ProPublica under a Freedom of Information Act Request.