« Money as a Friendship Bracelet
Detailed Record
Nayak to Sare Pul-Phase One (PENDING Coordination)
Planned Start Month
July 2010
Estimated Cost
$4,608,235
Status
Status Unknown
Province
Bamyan
Regional Command
Unknown
Project Description
Road Construction
Project Goals
Background: The roads throughout Bamyan are in poor condition. This road allows for better trafficability of the local populace as well as economic growth for the Afghan people. This is also a road that will connect Bamyan to other Provinces as it goes towards the western border. Goal: A new road that increase trafficability and decrease travel time to allow the local people to transport their good to various regions and bazaars throughout Bamyan. Comments: This project requires the Contractor to construct a 39.23km road with a 7m gravel roadway width with 1m gravel shoulders on either side for an overall width of 9m. Start: Nayak 42S UD 14284 45658 End: Khame Bazargan 42S TD 84154 65932
Results
Results unknown.
Updates
No updates provided.
SOURCES
Illustrations: Sarah Way for ProPublica. Data: Assembled from several different Department of Defense databases by the Special Inspector General for Afghanistan Reconstruction and provided to ProPublica under a Freedom of Information Act Request.