Nayak to Sare Pul-Phase Two (PENDING Coordination)

Planned Start Month

July 2010

Estimated Cost

$1,874,720

Status

Status Unknown

Province

Bamyan

Regional Command

Unknown

Project Description

Road Construction

Project Goals

Background: The roads throughout Bamyan are in poor condition. This road allows for better trafficability of the local populace as well as economic growth for the Afghan people. This is also a road that will connect Bamyan to other Provinces as it goes towards the western border.

Goal: A new road that increase trafficability and decrease travel time to allow the local people to transport their good to various regions and bazaars throughout Bamyan.

 Comments: This project requires the Contractor to construct a 37.58km gravel road that has a 7m roadway width with 1m of gravel shoulders on either side.

Start: Khame Bazargan 42S TD 84154 65932

End: Sare Pul 42S TD 57861 92454

Results

Results unknown.

Updates

No updates provided.