« Money as ¯\_(ツ)_/¯

Detailed Record

Shayr Khan Low Water Crossing

Planned Start Month

April 2012

Estimated Cost

$31,611

Status

Canceled / Terminated

Province

Wardak

Regional Command

RC-East

Project Description

No project description provided.

Project Goals

Provide all necessary labor, equipment, transportation, material, and security to construct approximately 18m long, 7m wide, Low Water Crossing (Flat Area Wash) in the Jalrez District of Wardak Province. The project will include all work necessary to complete the low water crossing including any detours to maintain normal traffic flow.

Results

Results unknown.

Updates

28 SEP 12: Uploaded final ODS

03 SEP 12: Uploaded TOA and PM/PPO docs

31 AUG 12: Uploaded termination ADR and MFR

02 AUG 12: Managed the media files to prepare for termination which will be when close current Bulk Funds in Sept.

25 JUL 12: No longer going forward with project. It is incomplete and no longer meets the new requirements for the AOR.

15 MAY 12: Bulk money was used for opening shura. Vendor vetting process is still ongoing. SM.

1 MAY 12- All required documents are uploaded and signed. Final document needed is the Land use agreement that needs to be signed by DG Bohoner. Then we can move forward.

23 FEB 12 (CPT Kenney) - Initial ADR created and documents uploaded.
SOURCES

Illustrations: Sarah Way for ProPublica. Data: Assembled from several different Department of Defense databases by the Special Inspector General for Afghanistan Reconstruction and provided to ProPublica under a Freedom of Information Act Request.