Miscellaneous Buildings Construction
Total Committed Value of Federal Contracts
$11.6M
Total Contracts
38
Total Actions
110

Recent Contract Actions

Contracts can have multiple “contract actions”: This is how agencies spend money for a specific purpose, adjust the amount committed or change the contract in a way that doesn’t affect the amount. That last scenario is usually indicated by a $0 action. If there is a contract action for a negative amount, it generally means the contract was adjusted or canceled.

Description Vendor Agency Effective Estimated completion Amount Committed
TO PERFORM MULTIPLE CONSTRUCTION AND RENOVATION JOB ORDERS ON THE MAIN CAMPUS OF THE NATIONAL INSTITUTE OF HEALTH (NIH); BETHESDA, MARYLAND FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $485,909
COVID-19 TIME EXTENSION TURNER CONSTRUCTION COMPANY Department of the Army January 30, 2018 August 10, 2021 $0
TO PERFORM MULTIPLE CONSTRUCTION AND RENOVATION JOB ORDERS ON THE MAIN CAMPUS OF THE NATIONAL INSTITUTE OF HEALTH (NIH); BETHESDA, MARYLAND FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $883,531
COVID-19 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF PROVIDING THE LABOR, EQUIPMENT, AND MATERIALS TO PERFORM THE REVITALIZE PRESSURANTS AND PROPELLANTS SYSTEM PHASE 1 PROJECT AT MARSHALL SPACE FLIGHT CENTER (MSFC) IN HUNTSVILLE, ALABAMA. THE INTENT OF THIS PROJECT IS TO IMPROVE RELIABILITY AND MINIMIZE RISK TO PROGRAMS THAT USE THIS UTILITY. WORK INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND REPLACEMENT OF EXISTING HIGH PRESSURE, HIGH PURITY AIR PIPING SYSTEMS AS WELL AS REMOVAL, REPLACEMENT, AND NEW INSTALLATION OF HIGH PRESSURE NITROGEN PIPING SYSTEMS AT VARIOUS LOCATIONS THROUGHOUT MSFC. WORK ALSO INCLUDES REPLACEMENT OF AGING AND UNRELIABLE VALVES. WRIGHT BROS., LLC National Aeronautics and Space Administration November 29, 2018 June 04, 2021 $101,888
C109626 - RENOVATE COVID-19 SUPPORT LAB BUILDING 10 ROOM 5B02 - RICK ROBEY - PERIOD OF PERFORMANCE: 3/2/21 - 8/12/21 NEW AGE DEVELOPMENT GROUP, LLC National Institutes of Health March 02, 2021 August 12, 2021 $227,042
COVID-19 SITE CLOSURE RESULTED IN RENTAL COSTS DURING CLOSURE AND TO INCORPORATE A REQUEST FOR EQUITABLE ADJUSTMENT. A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $68,195
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, EXTEND PERFORMANCE END DATE NOVOTNY CONSTRUCTION LLC National Park Service August 30, 2019 February 08, 2021 $0
COVID-19 TIME EXTENSION 05/21/20 - 09/30/20. EMPRESA DE CONSTRUCCION Y TRANSPORTE ETERNA, S.A. DE C.V. Department of the Army September 25, 2019 February 27, 2021 $0
COVID-19 (OMB MEMO M-20-22) AWARD OF POTABLE WATER PHASE 2. CIVIL WORKS CONTRACTING LLC National Aeronautics and Space Administration June 10, 2019 March 28, 2022 $123,934
COVID-19 EQUIPMENT DELIVERY DELAYS SES CIVIL AND ENVIRONMENTAL LLC Department of the Army September 23, 2019 October 01, 2020 $0
COVID-19 SITE CLOSURE RESULTED IN AN ADDITIONAL 49 DAYS TO PERIOD OF PERFORMANCE. HIGH PURITY AIR DRYER DESIGN HIGH PRESSURE GAS FACILITY BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $0
WEST POINT POWERHOUSE PROJECT CARES ACT COVID-19 3610 REA KIEWIT INFRASTRUCTURE SOUTH CO. Department of the Army September 16, 2019 April 22, 2021 $7,403
COVID-19 SITE CLOSURE RESULTED IN AN ADDITIONAL 88 DAYS TO PERIOD OF PERFORMANCE AND INCORPORATE A REQUEST FOR EQUITABLE ADJUSTMENT. SANITARY SEWER SYSTEM RECAPITALIZATION DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $784,379
COVID-19 TIME DELAY SES CIVIL AND ENVIRONMENTAL LLC Department of the Army September 01, 2020 April 12, 2021 $0
COVID-19 DELAYS DAVID BOLAND, INC. Department of the Army September 30, 2018 June 16, 2020 $0
COVID-19 DELAYS DAVID BOLAND, INC. Department of the Army September 30, 2018 June 16, 2020 $0
EPG, REPLACE ROOF BLDG 56301 KWR CONSTRUCTION, INC. Department of the Army April 21, 2020 December 18, 2020 $0
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, EXTEND PERFORMANCE END DATE NOVOTNY CONSTRUCTION LLC National Park Service August 30, 2019 February 08, 2021 $0
REFERENCE NO. R00020 FL024 COVID-19 DELAYS SHEFFIELD KORTE TEAM LLC Department of the Army September 29, 2018 November 27, 2020 $0
DECONSTRUCT FACILITIES&STRUCTURES, VARIOUS LOCATIONS AT KENNEDY SPACE CENTER. REQUEST FOR EQUITABLE ADJUSTMENT (REA) #2 COVID-19 DELAY OF 115 DAYS. PERIOD OF PERFORMANCE COMPLETION DATE REMAINS 10/31/2020. ARS ALEUT REMEDIATION LLC National Aeronautics and Space Administration September 26, 2018 October 31, 2020 $37,839
COVID-19 SITE CLOSURE RESULTED IN AN ADDITIONAL 283 DAYS TO PERIOD OF PERFORMANCE AND INCORPORATE A REQUEST FOR EQUITABLE ADJUSTMENT. REFURBISH POTABLE WATER SYSTEM WATER WELLS AND TOWERS AT STENNIS SPACE CENTER, MS ADVON CORPORATION National Aeronautics and Space Administration September 16, 2019 July 30, 2021 -$397,236
SITE-WIDE FIRE AND HAZARD DETECTION SYSTEM AT STENNIS SPACE CENTER, MS SOUTHEAST CHEROKEE CONSTRUCTION, INC. National Aeronautics and Space Administration September 15, 2017 February 01, 2021 $25,655
TO PERFORM MULTIPLE CONSTRUCTION AND RENOVATION JOB ORDERS ON THE MAIN CAMPUS OF THE NATIONAL INSTITUTE OF HEALTH (NIH); BETHESDA, MARYLAND FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $40,105
CATHODIC PROTECTION SYSTEM REHAB TASK ORDER UNDER MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR STENNIS SPACE CENTER, MISSISSIPPI HEALTHEON, INC. National Aeronautics and Space Administration September 08, 2017 November 01, 2020 $13,000
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS) BUILDING 9323 MODIFICATIONS DRACE CONSTRUCTION CORP. National Aeronautics and Space Administration March 27, 2020 April 10, 2020 $8,980
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS PROVIDED FOR THIS TASK ORDER, YOUR BASIC TERMS AND CONDITIONS, DRAWINGS, AND SPECIAL CONDITIONS PROVIDED WITH THIS TASK ORDER. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSIST OF PROVIDING THE LABOR, EQUIPMENT, TOOLS, AND MATERIALS NECESSARY TO COMPLETE THE CONSTRUCTION AND/OR REPAIR AND MODIFY OF ELECTRICAL UTILITY EQUIPMENT AT BUILDING 2311 AND EQUIPMENT UTILITY AND CONTROL FOR LOCK GATES AT BUILDING 2310. THE WORK ALSO INCLUDES THE PROCUREMENT AND INSTALLATION OF EQUIPMENT TO BE PROVIDED NEW BY THE CONTRACTOR AS INDICATED AND REQUIRED FOR THE PROVISION OF FULLY FUNCTION SYSTEMS. THE TYPES OF EQUIPMENT INCLUDE BUT ARE NOT LIMITED TO TRANSFORMERS, MOTOR CONTROL ENTERS, CABLES, SWITCHES, SWITCHBOARD CONTROL SYSTEMS, CONSOLES, LIGHTS, VALVES, NEW DUCTBANK, PIPING, ELECTRICAL CABINETS, CONCRETE, PAVEMENT AND DEMOLITION. MUCH OF THE WORK IS IN CONFINED SPACES. CONTRACTOR SHALL PERFORM ALL PARTIAL CONSTRUCTION AS SUGGESTED ON THE DRAWINGS TO ENSURE DOWN TIMES DOES NOT EXCEED THE TIME FRAME AS INDICATED ON DRAWING E-002. ALL TERMINATION ON MAIN CONTROL BOARD, CONSOLES, AND TESTING SHALL BE PERFORMED BY MANUFACTURER'S TECHNICIANS. "ELECTRICAL REPAIRS TO CANAL LOCK CONTROLS." REPLACE ALL EXISTING LIGHTS AND PARTIAL CONDUIT. HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $11,099
HURRICANE MATTHEW REPAIRS, HANGAR AF. MODIFICATION EXTENDS CONTRACT 34 DAYS TO NOVEMBER 6, 2020 DUE TO COVID 19 IMPACTS AND INSERT FAR CLAUSE 52.204-25. ODYSSEY INTERNATIONAL, INC. National Aeronautics and Space Administration September 21, 2018 August 31, 2020 $0
HIGH PURITY AIR DRYER DESIGN HIGH PRESSURE GAS FACILITY BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $50,486
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS MAY BE EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS P BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $26,610
TO PERFORM MULTIPLE CONSTRUCTION AND RENOVATION JOB ORDERS ON THE MAIN CAMPUS OF THE NATIONAL INSTITUTE OF HEALTH (NIH); BETHESDA, MARYLAND FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $126,394
CONSTRUCTION SERVICES TO INSTALL SHADE STRUCTURES BRAND CONSTRUCTION LLC Department of Veterans Affairs August 21, 2020 December 05, 2020 $16,444
SANITARY SEWER SYSTEM RECAPITALIZATION DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $0
TO PERFORM MULTIPLE CONSTRUCTION AND RENOVATION JOB ORDERS ON THE MAIN CAMPUS OF THE NATIONAL INSTITUTE OF HEALTH (NIH) BETHESDA, MARYLAND FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $782,305
SOFA: CR002 COVID-19, DEFAULT THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE BY 70 CALENDAR DAYS DUE TO THE DELAYS BY THE COVID-19 PANDEMIC WHICH WERE BEYOND THE CONTROL AND WITHOUT THE FAULT OF THE CONTRACTOR DURING THE PERIOD OF 13 MARCH 2020 BB GOVERNMENT SERVICES SRL Department of the Army September 16, 2019 October 28, 2020 $0
INSTALL SOLAR LIGHTS AT M7-1472 PCN 99735. MOD 3: EXTENDS THE CONTRACT 28 DAYS FROM SEPTEMBER 11, 2020 TO OCTOBER 9, 2020, ALLOWING CONTRACTOR TO RECOVER SCHEDULE IMPACTS CAUSED BY COVID-19 DELAYS, AND INSERTS FAR CLAUSE 52.204 INTO CONTRACT. ELECTRIC SOLUTIONS UNLIMITED, LLC National Aeronautics and Space Administration January 21, 2020 October 09, 2020 $0
COVID-19 C109065 - BLDG 33 - ROOM 2E13B - NIAID COVID TISSUE CULTURE ROOM RENOVATION, DESIGN/BUILD SERVICES, DANIEL JANNIELLO MATOS BUILDERS LLC National Institutes of Health September 03, 2020 May 14, 2021 $343,123
PERFORM VARIOUS JOB ORDERS ON THE BETHESDA, MARYLAND NATIONAL INSTITUTE OF HEALTH (NIH) MAIN CAMPUS FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $349,630
COVID-19 TIME EXTENSION 03/21/20 - 07/27/20. SOUTHEAST CHEROKEE CONSTRUCTION, INC. Department of the Army February 22, 2018 November 10, 2020 $0
SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER) CONTRACT - TASK ORDER 2 - PROPELLANTS MAINTENANCE FACILITY, PCN 99121. MOD 15: EXTENDS THE PERIOD OF PERFORMANCE TO 8/23/20 DUE TO COVID-19 IMPACTS AND TROPICAL STORM/HURRICAN ISAIAS SITE PREPARATION. PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration September 26, 2016 August 23, 2020 $0
WEST PARK SITE INFRASTRUCTURE UPGRADES. MOD INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENT DUE COVID-19 RETURN TO SITE, INCREASING TOTAL CONTRACT $23,873. COMPLETION DATE EXTENDED TO NOVEMBER 4, 2020. HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $23,837
REHABILITATION OF THE E-COMPLEX DELUGE WATER SYSTEM AT STENNIS SPACE CENTER, MS DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $50,000
CONSTRUCTION SERVICES TO INSTALL SHADE STRUCTURES BRAND CONSTRUCTION LLC Department of Veterans Affairs August 21, 2020 December 05, 2020 $218,000
HIGH PURITY AIR DRYER DESIGN HIGH PRESSURE GAS FACILITY BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $0
SANITARY SEWER SYSTEM RECAPITALIZATION DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $0
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, ADD FUNDING FOR CHANGE WITH PORTABLE TOILET SCHEDULES, EXTEND PERFORMANCE END DATE NOVOTNY CONSTRUCTION LLC National Park Service August 30, 2019 February 08, 2021 $50
COVID-19 TIME EXTENSION - 9 DAYS GONZALEZ-DE LA GARZA & ASSOCIATES, LLC Department of the Army September 26, 2019 May 04, 2021 $0
RENOVATION OF REPLACEMENT MANUAL FAUCETS TO AUTOMATIC, NIH CAMPUS BETHESDA, MARYLAND. JB CONTRACTING, INC. National Institutes of Health August 05, 2020 February 04, 2021 $893,325
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS MAY BE EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS P BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $0
LOGISTICS ROOF (K6-1547) ROOF REPLACEMENT, PCN: 99096. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED FROM 7/31/2020 TO 8/31/2020 TO COMPLETE CONTRACT CLOSE OUT DUE TO NO ACCESS TO KENNEDY SPACE CENTER AS A RESULT OF COVID 19. ODYSSEY INTERNATIONAL, INC. National Aeronautics and Space Administration September 21, 2018 August 31, 2020 $0
WEST PARK SITE INFRASTRUCTURE UPGRADES. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE COMPLETION DATE 15 DAYS TO AUGUST 15, 2020 TO EVALUATE DENIED ACCESS TO KSC IMPACTS CURRENTLY IN REVIEW. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $0
REVITALIZE KENNEDY SPACE CENTER'S WATER AND WASTE WATER SYSTEMS, PHASE 6. MODIFICATION PROVIDES AN EQUITABLE ADJUSTMENT FOR IMPACTS RESULTING FROM RESTRICTED ACCESS DUE TO COVID 19. COMPLETION DATE EXTENDED TO 10/14/20 AND AN INCREASE OF $17,498 BARBER KLEIN - FORESIGHT JV, LLC National Aeronautics and Space Administration November 09, 2017 October 14, 2020 $17,498
REPLACE OBSOLETE FIRE ALARM CONTROL PANELS (FACP), VARIOUS LOCATIONS, KENNEDY SPACE CENTER, FL, PCN: 99207. MODIFICATION EXTENDS CONTRACT COMPLETION DATE TO MAY 8, 2021 AS A RESULT OF THE RESTRICTED ACCESS COVID-19 SITUATION. A&H - AMBICA JV, LLC National Aeronautics and Space Administration September 28, 2018 May 08, 2021 $0
SITE-WIDE FIRE AND HAZARD DETECTION SYSTEM AT STENNIS SPACE CENTER, MS SOUTHEAST CHEROKEE CONSTRUCTION, INC. National Aeronautics and Space Administration September 15, 2017 February 01, 2021 $0
REMOVE AND REPLACE ROOFS AT BUILDINGS 30S AND 32HB AT JOHNSON SPACE CENTER PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
THE PURPOSE OF THIS PROCUREMENT IS TO REPLACE THE ROOF ON BUILDING 4561, PER FWR 4397198. VEC VALLEY ELECTRIC INC National Aeronautics and Space Administration September 27, 2018 August 28, 2020 $0
SANITARY SEWER SYSTEM RECAPITALIZATION DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $0
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $188,235
C108133 PERFORM VARIOUS JOB ORDERS ON THE BETHESDA, MARYLAND NATIONAL INSTITUTE OF HEALTH (NIH) MAIN CAMPUS FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $434,771
COVID-19 TIME EXTENSION 06/01/20-06/30/20. SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 TIME EXTENSION 06/01/20-06/29/20 SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
HURRICANE MATTHEW REPAIRS, HANGAR AF. MODIFICATION EXTENDS THE CONTRACT COMPLETION DATE BY 81 DAYS FROM JULY 14, 2020 TO OCTOBER 3, 2020 AS A RESULT OF RESTRICTED ACCESS TO JOHN F. KENNEDY SPACE CENTER (KSC) COVID-19 SITUATION. ODYSSEY INTERNATIONAL, INC. National Aeronautics and Space Administration September 21, 2018 August 31, 2020 $0
DECONSTRUCT FACILITIES&STRUCTURES, VARIOUS LOCATIONS. AS RESULT OF COVID 19 LIMITED ON-SITE ACTIVITIES AT KENNEDY SPACE CENTER, THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED FROM 6/30/2020 TO 8/31/2020. ARS ALEUT REMEDIATION LLC National Aeronautics and Space Administration September 26, 2018 October 31, 2020 $0
B221 REPLACE RING BUS PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
COVID-19 TIME EXTENSION 06/01/20 - 06/14/20. SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS MAY BE EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS P BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC National Aeronautics and Space Administration September 06, 2019 February 05, 2021 $0
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, EXTEND PERFORMANCE END DATE NOVOTNY CONSTRUCTION LLC National Park Service August 30, 2019 February 08, 2021 $0
WEST PARK SITE INFRASTRUCTURE UPGRADES. MODIFICATION EXTENDS COMPLETION DATE TO 7/31/2020 TO EVALUATE KENNEDY SPACE CENTER DENIED ACCESS IMPACTS CURRENTLY PENDING SUBMISSION. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $0
C108133 PERFORM VARIOUS JOB ORDERS ON THE BETHESDA, MARYLAND NATIONAL INSTITUTE OF HEALTH (NIH) MAIN CAMPUS FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $501,604
REMOVE AND REPLACE ROOFS AT BUILDINGS 30S AND 32HB AT JOHNSON SPACE CENTER PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
B221 REPLACE RING BUS PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
CATHODIC PROTECTION SYSTEM REHAB TASK ORDER UNDER MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR STENNIS SPACE CENTER, MISSISSIPPI HEALTHEON, INC. National Aeronautics and Space Administration September 08, 2017 November 01, 2020 $0
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $14,036
COVID-19 TIME EXTENSION 05/01/20 - 05/31/20. EMPRESA DE CONSTRUCCION Y TRANSPORTE ETERNA, S.A. DE C.V. Department of the Army September 25, 2019 February 27, 2021 $0
COVID-19 TIME EXTENSION 05/01/20 - 05/31/20. SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 TIME EXTENSION 05/01/20 - 05/31/20. SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS) BUILDING 9323 MODIFICATIONS DRACE CONSTRUCTION CORP. National Aeronautics and Space Administration March 27, 2020 April 10, 2020 $193,902
COVID-19 TIME EXTENSION 05/01/20 - 05/31/20 SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 TIME EXTENSION 05/01/20 - 05/20/20. EMPRESA DE CONSTRUCCION Y TRANSPORTE ETERNA, S.A. DE C.V. Department of the Army September 25, 2019 February 27, 2021 $0
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS PROVIDED FOR THIS TASK ORDER, YOUR BASIC TERMS AND CONDITIONS, DRAWINGS, AND SPECIAL CONDITIONS PROVIDED WITH THIS TASK ORDER. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSIST OF PROVIDING THE LABOR, EQUIPMENT, TOOLS, AND MATERIALS NECESSARY TO COMPLETE THE CONSTRUCTION AND/OR REPAIR AND MODIFY OF ELECTRICAL UTILITY EQUIPMENT AT BUILDING 2311 AND EQUIPMENT UTILITY AND CONTROL FOR LOCK GATES AT BUILDING 2310. THE WORK ALSO INCLUDES THE PROCUREMENT AND INSTALLATION OF EQUIPMENT TO BE PROVIDED NEW BY THE CONTRACTOR AS INDICATED AND REQUIRED FOR THE PROVISION OF FULLY FUNCTION SYSTEMS. THE TYPES OF EQUIPMENT INCLUDE BUT ARE NOT LIMITED TO TRANSFORMERS, MOTOR CONTROL ENTERS, CABLES, SWITCHES, SWITCHBOARD CONTROL SYSTEMS, CONSOLES, LIGHTS, VALVES, NEW DUCTBANK, PIPING, ELECTRICAL CABINETS, CONCRETE, PAVEMENT AND DEMOLITION. MUCH OF THE WORK IS IN CONFINED SPACES. CONTRACTOR SHALL PERFORM ALL PARTIAL CONSTRUCTION AS SUGGESTED ON THE DRAWINGS TO ENSURE DOWN TIMES DOES NOT EXCEED THE TIME FRAME AS INDICATED ON DRAWING E-002. ALL TERMINATION ON MAIN CONTROL BOARD, CONSOLES, AND TESTING SHALL BE PERFORMED BY MANUFACTURER'S TECHNICIANS. "ELECTRICAL REPAIRS TO CANAL LOCK CONTROLS." REPLACE ALL EXISTING LIGHTS AND PARTIAL CONDUIT. HEALTHEON, INC. National Aeronautics and Space Administration June 19, 2019 August 07, 2020 $0
COVID-19 TIME EXTENSION 03/20/20 - 04/30/20. EMPRESA DE CONSTRUCCION Y TRANSPORTE ETERNA, S.A. DE C.V. Department of the Army September 25, 2019 February 27, 2021 $0
BUILDING 31 REPLACE AIR HANDLING UNITS DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $0
SANITARY SEWER SYSTEM RECAPITALIZATION DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. National Aeronautics and Space Administration July 03, 2018 November 14, 2020 $0
COVID-19 TIME EXTENSION 03/16/20-04/30/20 SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 TIME EXTENSION 03/24/20-04/30/20. SERVICIOS Y OBRAS SEOBRA LTDA Department of the Army September 28, 2017 May 01, 2020 $0
C108133 PERFORM VARIOUS JOB ORDERS ON THE BETHESDA, MARYLAND NATIONAL INSTITUTE OF HEALTH (NIH) MAIN CAMPUS FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $638,705
SITE-WIDE FIRE AND HAZARD DETECTION SYSTEM AT STENNIS SPACE CENTER, MS SOUTHEAST CHEROKEE CONSTRUCTION, INC. National Aeronautics and Space Administration September 15, 2017 February 01, 2021 $0
B221 REPLACE RING BUS THE PURPOSE OF THIS MOD IS TO CHANGE NAICS CODE FROM 236210 TO 237130. PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
COVID-19 TIME EXTENSION 03/24/20-04/30/20 SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 TIME EXTENSION 03/24/20-04/30/20 SERVICIOS Y OBRAS SEOBRA S A S Department of the Army September 28, 2018 October 22, 2020 $0
COVID-19 B2 TEST COMPLEX CLEAN UP DRACE CONSTRUCTION CORP. National Aeronautics and Space Administration March 27, 2020 April 10, 2020 $0
REPAIR SANITARY SEWER SYSTEM AT JSC BARBER KLEIN - FORESIGHT JV, LLC National Aeronautics and Space Administration November 09, 2017 October 14, 2020 $0
REPAIR SANITARY SEWER SYSTEM AT JSC BARBER KLEIN - FORESIGHT JV, LLC National Aeronautics and Space Administration November 09, 2017 October 14, 2020 $0
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, CHANGE ORDER PORTABLE TOILETS NOVOTNY CONSTRUCTION LLC National Park Service August 30, 2019 February 08, 2021 $0
ALTERNATE CARE FACILITY (ACF): CHINLE COMMUNITY CENTER - CHINLE, APACHE COUNTY, ARIZONA A00001 00002 REPLACE EXISTING WATER HEATERS, 00003 ADD 5 ADDITIONAL FIRE EXTINGUISHERS COVID-19 WEIL CONSTRUCTION, INC. Department of the Army April 17, 2020 May 01, 2020 $34,073
C108133 PERFORM VARIOUS JOB ORDERS ON THE BETHESDA, MARYLAND NATIONAL INSTITUTE OF HEALTH (NIH) MAIN CAMPUS FOUR TRIBES CONSTRUCTION SERVICES, LLC National Institutes of Health September 15, 2020 October 24, 2021 $34,533
ALTERNATE CARE FACILITY (ACF): CHINLE COMMUNITY CENTER - CHINLE, APACHE COUNTY, ARIZONA - DEFINITIZATION MODIFICATION COVID-19 WEIL CONSTRUCTION, INC. Department of the Army April 17, 2020 May 01, 2020 -$99,255
ALTERNATE CARE FACILITY (ACF): ATSA BIYAAZH HIGH SCHOOL - SHIPROCK, SAN JUAN COUNTY, NEW MEXICO - DEFINITIZATION MODIFICATION. COVID-19 FOUR WINDS MECHANICAL HTC/AC INC. Department of the Army April 17, 2020 May 01, 2020 -$109,136
ALTERNATE CARE FACILITY (ACF): CHINLE COMMUNITY CENTER-CHINLE, APACHE COUNTY, ARIZONA WEIL CONSTRUCTION, INC. Department of the Army April 17, 2020 May 01, 2020 $2,016,062
ALTERNATE CARE FACILITY (ACF): ATSA BIYAAZH HIGH SCHOOL (SHIPROCK ASSOCIATED SCHOOLS INC.) - SHIPROCK, SAN JUAN COUNTY, NEW MEXICO FOUR WINDS MECHANICAL HTC/AC INC. Department of the Army April 17, 2020 May 01, 2020 $1,683,638
REMOVE AND REPLACE ROOFS AT BUILDINGS 30S AND 32HB AT JOHNSON SPACE CENTER PONTCHARTRAIN PARTNERS, LLC National Aeronautics and Space Administration November 21, 2019 August 21, 2021 $0
‹ Previous 1
About this data
This data comes from the Federal Procurement Data System, which includes all contracts worth $10,000 or more. We look at all contracts that are tagged with the procurement code for COVID-19 or otherwise started in 2020 and contain “COVID-19” in the description. Department of Defense contracting data is subject to a 90-day delay before it appears in the data.