Anchorage County, Alaska, funds by Interior, Department of
Listing $32,324,073.17 in stimulus funds from Interior, Department of for Anchorage
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
MARSH CREEK, LLC | $16,283,983 | Drew Point Well Test # 1 Remediation | Bureau of Land Management | 9/22/2009 |
MARSH CREEK, LLC | $2,833,564 |
Feasibility study,Preliminary Design and Construction of Wind Turbines at King Salmon & Cold Bay.The installation of wind turbines will help reduce the refuge's greenhouse gas emissions and could decrease utility costs.
This spending item is part of a $3,194,985 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
MANOKOTAK VILLAGE COUNCIL | $757,418 | Highway Planning and Construction Design of Project No.E01259A3, Manokotak Road. Approved ARRA TIP Construction Project: Design activities associated with 0.5 miles of surface renovation of an existing gravel road(Second Street, Route 1007, Section 10,Project E01295A3)located in Manokotak | Indian Affairs (Assistant Secretary) | 3/31/2010 |
MANOKOTAK VILLAGE COUNCIL | $757,418 | Highway Planning and Construction Design of Project No.E01259A3, Manokotak Road. Approved ARRA TIP Construction Project: Design activities associated with 0.5 miles of surface renovation of an existing gravel road(Second Street, Route 1007, Section 10,Project E01295A3)located in Manokotak | Indian Affairs (Assistant Secretary) | 3/31/2010 |
NATIVE VILLAGE OF SAVOONGA | $690,982 | Highway Planning and Construction The Native Village of Savoonga had awarded the contract to Rodney P. Kinney & Assoc. for the design of 2 routes. | Indian Affairs (Assistant Secretary) | 4/15/2010 |
COOK INLET TRIBAL COUNCIL, INC. | $653,114 | ARRA Child Care and Development Block Grant Cook Inlet Tribal Council, Inc., Employment & Training Services Department, (as lead agency) will provide child care assistance through a single, integrated participant service delivery system administered under P.L. 102-477. The Child Care Program provid | Indian Affairs (Assistant Secretary) | 6/01/2009 |
MARSH CREEK, LLC | $609,108 | Red Devil Temporary Bridge Install | Bureau of Land Management | 2/01/2010 |
BRISTOL ENGINEERING SERVICES CORPORATION | $592,567 |
Highway Planning and Construction Provide design work for access road and bridge across Klutuk Creek.
This spending item is part of a $688,619 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/02/2010 |
University of Alaska Anchorage | $545,411 |
Rapid Ecoregional Assessment for the Seward Peninsula, Nulato Hills, Kotzebue Lowlands, Alaska Ecoregion
This spending item is part of a $1,249,867 allocation.
See details
|
Bureau of Land Management | 9/16/2010 |
Northern Lights Mechanical | $511,600 |
Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National
This spending item is part of a $2,541,074 allocation.
See details
|
National Park Service | 8/26/2010 |
MARSH CREEK, LLC | $485,581 |
Red Devil, AK - furnish all personnel, equipment, supervision, transportation, supplies, and incidentals to perform: - treatment of existing stockpiled petroleum contaminated soil - conduct a site characterization of the petroleum release at former above
This spending item is part of a $817,243 allocation.
See details
|
Bureau of Land Management | 9/22/2009 |
KINNEY, RODNEY P ASSOCIATES INC | $353,869 |
Highway Planning and Construction Crooked Creek IRR ARRA Grant for the design of Project E02109A2-New Housing Road Development Project to construct a road for the new housing development.
This spending item is part of a $372,935 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/21/2010 |
MARSH CREEK, LLC | $331,662 |
Red Devil, AK - furnish all personnel, equipment, supervision, transportation, supplies, and incidentals to perform: - treatment of existing stockpiled petroleum contaminated soil - conduct a site characterization of the petroleum release at former above
This spending item is part of a $817,243 allocation.
See details
|
Bureau of Land Management | 9/22/2009 |
MICHAEL L. FOSTER & ASSOCIATES, INC. | $308,535 | Replace King Salmon maintenance building | National Park Service | 5/20/2010 |
MICHAEL L. FOSTER & ASSOCIATES, INC. | $308,535 | Replace King Salmon maintenance building | National Park Service | 5/20/2010 |
MICHAEL L. FOSTER & ASSOCIATES, INC. | $298,131 |
Provide on-sight construction management services/field engineering services during the construction of the Front Country Wastewater Treatment system and Rehabilitate Collection System at Denali National Park and Preserve.
This spending item is part of a $387,177 allocation.
See details
|
National Park Service | 4/01/2010 |
GURALP SYSTEMS LTD | $248,900 | BroadBand seismometers for the US Geological Survey. | Geological Survey | 3/30/2010 |
SUPERIOR GROUP, INC., THE | $211,293 |
The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
KINNEY, RODNEY P ASSOCIATES INC | $204,909 |
Highway Planning and Construction Design of Project No. E09259AR/Jilkaat Kwaan Trail
This spending item is part of a $240,781 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/07/2010 |
HDR ENGINEERING, INC. | $194,020 | Manage a subconsultant responsible for providing construction administration for various construction projects at USFWS refuge facilities. | U.S. Fish and Wildlife Service | 4/10/2010 |
COOK INLET TRIBAL COUNCIL, INC. | $189,024 | Native American Employment and Training The Anchorage Youth Services (AYS) and Village Youth Services (VYS) programs are year-round programs that focuses on providing opportunities for income eligible, at-risk Alaska Native/American Indian youth ages 14-21 living within the Municipality of Anc | Indian Affairs (Assistant Secretary) | 6/01/2009 |
TERRITORY NORTH CONSTRUCTORS, LLC | $185,300 | CCSC Bridge Extension | Interior, Department of | 3/30/2010 |
TERRITORY NORTH CONSTRUCTORS, LLC | $185,300 | Remove 85' bridge and replace with a 115' bridge. | Bureau of Land Management | 3/30/2010 |
MARSH CREEK, LLC | $184,226 |
Debris Removal and Disposal Create access for heavy equipment to remove overgrown vegetation surrounding the powderhouse structure before accessing and removing the remaining remnant of the powderhouse structure. Explosive Hazard Mitigation Perform an i
This spending item is part of a $221,858 allocation.
See details
|
Bureau of Land Management | 8/18/2010 |
YOUTH RESTORATION CORPS | $182,650 | Recreation Resource Management The purpose is to build 4 public safety cabins along the Iditarod trail and train rural Alaska youth in skilled trades which will benefit them and employ them in the future | Bureau of Land Management | 5/17/2010 |
MARSH CREEK, LLC | $175,736 |
Feasibility study,Preliminary Design and Construction of Wind Turbines at King Salmon & Cold Bay.The installation of wind turbines will help reduce the refuge's greenhouse gas emissions and could decrease utility costs.
This spending item is part of a $3,194,985 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
ANCHORAGE, MUNICIPALITY OF | $170,239 |
Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The purpose of the Salmon Rearing Habitat Restoration & Protection Project at Lynwood Park & Related Habitat Improvements is to implement approximately -+ mile of streambank restoration in addition to watershed and related ripariaian habitat improvements th... Show more
This spending item is part of a $246,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/05/2009 |
USKH INC. | $164,519 | PR for design work for Ak Harrison Creek Gold-Placer Mining restoration project. Field reviews, Survey & Design. | Bureau of Land Management | 12/04/2009 |
USKH INC. | $154,329 | The scope of design services for this project is limited to: Planning, Design, and Construction Document preparation for development of new facilities at Nome Creek Administrative Site, Nome Creek, Alaska. Scope of Work for each discipline is as follows: | Bureau of Land Management | 9/08/2009 |
BRISTOL ENGINEERING SERVICES CORPORATION | $148,136 |
Highway Planning and Construction This project will reconstruct .6 miles of Tower Road to include a sound barrier.
This spending item is part of a $1,154,833 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/29/2010 |
UNIVERSITY OF ALASKA ANCHORAGE | $134,638 |
Environmental Quality and Protection Resource Management This project will involve a collaborative partnership between the University of Alaska Anchorage and Michigan Technological University (the lead partner) on the documentation of abandoned mine hazards in the Fairbanks District for the Bureau ofof Land Manag... Show more
This spending item is part of a $497,982 allocation.
See details
|
Bureau of Land Management | 4/06/2010 |
PLASCHEM SUPPLY & CONSULTING INC | $134,200 | This award allowed us to retain 3 trained employees for the term of the contract. | Geological Survey | 12/01/2009 |
USKH INC. | $127,688 | USKH Inc. under an IDIQ contract with the BLM was retained to improve the Tangle Lakes Access Road to the Tangle Lakes camp ground located off of the Denali Highway 21 miles west of Paxson ALaska. The road is located next to the Delta River classified a s | Bureau of Land Management | 8/04/2009 |
USKH INC. | $123,000 | Surveying, hydrology analysis, preliminary design, final design, and cost estimating services for the East Twin creek Culvert Crossing in Nome, Alaska. | Bureau of Land Management | 8/04/2009 |
USKH INC. | $123,000 | We are providing the Bureau of Land Management in Fairbanks Alaska with surveying, hydrology analysis, preliminary design, final design, and cost estimating services for the West Twin Creek Culvert Crossing. | Bureau of Land Management | 8/04/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $120,700 | Conservation Activities by Youth Service Organizations This award funded services to seven National Parks in Alaska, from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation service projects. SCA A Interns a... Show more | National Park Service | 9/22/2009 |
PND ENGINEERS, INC. | $107,077 |
Electrical and heating, ventilation, and air conditioning (HVAC) rehabilitation for 3-story converted U.S. Navy dormitory now used for Midway Atoll National Wildlife Refuge Visitors. Recent modifications to scope include installation of heavy duty door cl
This spending item is part of a $1,212,942 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/16/2009 |
CHEMTRACK ALASKA, INC. | $104,846 | Anaktuvuk Pass Wind Turbine Installation | National Park Service | 3/19/2010 |
MARSHALL'S ELECTRIC, INC | $100,000 | install solar panels | Bureau of Land Management | 5/24/2010 |
MARSH CREEK, LLC | $99,750 |
Feasibility study,Preliminary Design and Construction of Wind Turbines at King Salmon & Cold Bay.The installation of wind turbines will help reduce the refuge's greenhouse gas emissions and could decrease utility costs.
This spending item is part of a $3,194,985 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
ENVIRONMENTAL MANAGEMENT INC | $98,635 | Lead paint abatement, surface preparation and painting at BLM Maintenance Shop | Bureau of Land Management | 6/02/2010 |
HOLY CROSS OIL, INC. | $96,039 |
The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
ENGINEERED EQUIPMENT COMPANY OF ALASKA, INC. | $91,541 | Battery, 12VDC, Lead/Acid, AGM | Geological Survey | 3/12/2010 |
ANCHORAGE PARK FOUNDATION | $88,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The purpose of this project is to restore and rehabilitate approximately -+ mile of riparian habitat and to prevent further bank erosion and trail infrastructure impacts caused by bank trampling. Bioengineering restoration techniniques will be used includi... Show more | U.S. Fish and Wildlife Service | 7/30/2009 |
USKH INC. | $77,538 | Design for paving, re-paving by AFS buildings at Fort Wainright in Fairbanks, Alaska. | Bureau of Land Management | 11/12/2009 |
O.E.S., INC. | $77,220 | Abandonded mine site cleanup. | Bureau of Land Management | 6/02/2010 |
ANCHORAGE PARK FOUNDATION | $75,761 |
Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The purpose of the Salmon Rearing Habitat Restoration & Protection Project at Lynwood Park & Related Habitat Improvements is to implement approximately -+ mile of streambank restoration in addition to watershed and related ripariaian habitat improvements th... Show more
This spending item is part of a $246,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/05/2009 |
BETTISWORTH NORTH ARCHITECTS AND PLANNERS INC. | $75,659 |
A-E Title III Construction Administration Services,DENA. Project 'Relocate Emergency Services and LE Operations.
This spending item is part of a $77,845 allocation.
See details
|
National Park Service | 2/11/2010 |
COOK INLET TRIBAL COUNCIL, INC. | $75,000 | Indian Employment Assistance Project Description: The best way to learn a construction trade is through apprenticeship. Apprenticeship combines on-the-job training with formal classroom and hands-on instruction. Apprentices earn while they learn. Partnering with the Alaska Regional | Indian Affairs (Assistant Secretary) | 6/01/2009 |
HDR ENGINEERING, INC. | $71,539 |
Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska
This spending item is part of a $103,492 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/14/2009 |
HDR ENGINEERING, INC. | $71,539 |
Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska
This spending item is part of a $103,492 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/14/2009 |
BRISTOL ENGINEERING SERVICES CORPORATION | $70,580 |
Highway Planning and Construction Provide Design services associated with road contained herein an by terms of the Cotract. Contract Type: Subpart J - Fixed Price, Cotract Term: Date of award through 12/31/2010.
This spending item is part of a $81,816 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/09/2010 |
RIM ARCHITECTS AK LLC | $63,618 |
This project shall consist of the preparation bid ready construction documents for a new maintenance facility in King Salmon Alaska. The design team will create detailed plans and specification including all information necessary for construction of a pr
This spending item is part of a $140,891 allocation.
See details
|
National Park Service | 5/19/2010 |
RIM ARCHITECTS AK LLC | $54,500 |
Katmai National Park and Preserve. This project will provide funding to allow RIM Architects and our design team to provide Construction Administration and Commissioning Services for the construction of the King Salmon Maintenance Building for the NPS.
This spending item is part of a $74,250 allocation.
See details
|
National Park Service | 8/31/2010 |
FLY 4 YOU, INC. | $49,291 | Fixed wing aviation flight services for airborne collection and measurement of volcanic gases at Alaska volcanoes in Cook Inlet and/or observation flights to assess volcanic activity. | Office of Policy, Management and Budget/Chief Financial Officer | 5/17/2010 |
NUTHERS BROTHERS INC | $48,113 |
Provide all labor, materials, equipment and services necessary to complete demolition of existing wood decks and furnish and install six new decks, handrails and stairs, two each on three residences at King Salmon, Alaska; demolition of carpet, pad, resil
This spending item is part of a $424,124 allocation.
See details
|
U.S. Fish and Wildlife Service | 1/11/2010 |
R S A ENGINEERING, INC | $46,475 |
The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
ALASKA STAIRLIFT & ELEVATOR LLC | $44,108 |
Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National
This spending item is part of a $2,541,074 allocation.
See details
|
National Park Service | 8/26/2010 |
EASTSIDE CARPET COMPANY, LLC | $42,718 |
General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i
This spending item is part of a $8,140,651 allocation.
See details
|
National Park Service | 5/12/2010 |
R S A ENGINEERING, INC | $42,128 |
This project shall consist of the preparation bid ready construction documents for a new maintenance facility in King Salmon Alaska. The design team will create detailed plans and specification including all information necessary for construction of a pr
This spending item is part of a $140,891 allocation.
See details
|
National Park Service | 5/19/2010 |
USKH INC. | $41,906 | Design work for improvements to the Lower Birch Creek Wayside on the Steese Highway---amended amount from 30,424.51 to 41,906.40 for comfort station design | Bureau of Land Management | 12/04/2009 |
Ebsc Engineering LLC | $41,900 |
Highway Planning and Construction The Deering IRA Council applied for this ARRA Funding to insall pilot snow fencing along Route DER006.
This spending item is part of a $71,767 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/01/2010 |
GLOBAL SOURCE ONE INT, INC. | $41,148 | Sol # L10PS02547 0010 8 Foot Cherry Tone Landscape Timber, Qty 2500 $ 8,625.00 0020 3/8 x 12 Galvanized Carriage Bolts, Qty 600 $ 1,800.00 0030 3/8 Galvanized Lock Washer, Qty 600 $ 174.00 0040 3/8 Galvanized Hex Nut, Qty 600 $ 261.60 0050 3/8 Galva | Bureau of Land Management | 6/02/2010 |
NEW STUYAHOK TRADITIONAL COUNCIL | $39,000 | Highway Planning and Construction Project E01339A1-Design for landfill road to provide safety and environmental services. | Indian Affairs (Assistant Secretary) | 5/17/2010 |
NEW STUYAHOK TRADITIONAL COUNCIL | $39,000 | Highway Planning and Construction Project E01339A1-Design for landfill road to provide Safety and Environmental Services. | Indian Affairs (Assistant Secretary) | 5/17/2010 |
MARSH CREEK, LLC | $37,633 |
Debris Removal and Disposal Create access for heavy equipment to remove overgrown vegetation surrounding the powderhouse structure before accessing and removing the remaining remnant of the powderhouse structure. Explosive Hazard Mitigation Perform an i
This spending item is part of a $221,858 allocation.
See details
|
Bureau of Land Management | 8/18/2010 |
DOWL, LLC | $36,000 |
Highway Planning and Construction PROJECT WILL CONSIST OF TOPOGRAPIC SURVEY AND ENVIRIONMENTAL RESEARCH FOR THE PROPOSED AKUTAN HARBOR ACCESS ROAD
This spending item is part of a $72,777 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/01/2010 |
NATIVE VILLAGE OF AFOGNAK | $35,532 |
Highway Planning and Construction Survey and design of Muskomee Bay Trail access improvement/ Rehabilitation of boat landing dock.
This spending item is part of a $61,532 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/01/2010 |
WHPACIFIC, INC. | $31,952 |
Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska
This spending item is part of a $103,492 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/14/2009 |
WHPACIFIC, INC. | $31,952 |
Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska
This spending item is part of a $103,492 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/14/2009 |
USKH INC. | $30,596 | Design task order for emergency generator design for Anchorage Field Office complex at CTF | Bureau of Land Management | 12/11/2009 |
USKH INC. | $30,420 | Project for deferred maintenance work on two BLM buildings in Kotzebue, Alaska | Bureau of Land Management | 12/04/2009 |
USKH INC. | $29,699 | Design task order for the Campbell Creek Science Center-Biomass upgrade-Garn wood furnace heating system | Bureau of Land Management | 11/12/2009 |
COFFMAN ENGINEERS INC | $29,287 |
Total building commissioning for Denali ESFMB
This spending item is part of a $48,857 allocation.
See details
|
National Park Service | 5/10/2010 |
USKH INC. | $28,010 | Recovery funded Solar Design | Bureau of Land Management | 11/12/2009 |
MJKING& ASSOCIATES | $27,795 |
Rapid Ecoregional Assessment for the Seward Peninsula, Nulato Hills, Kotzebue Lowlands, Alaska Ecoregion
This spending item is part of a $1,249,867 allocation.
See details
|
Bureau of Land Management | 9/16/2010 |
BRISTOL ENGINEERING SERVICES CORPORATION | $26,000 |
Highway Planning and Construction Survey and design of Muskomee Bay Trail access improvement/ Rehabilitation of boat landing dock.
This spending item is part of a $61,532 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/01/2010 |
USKH INC. | $25,830 | The scope of design services for this project is limited to: Design and Construction Document preparation for a bridge extension of the Campbell Tract Facility located in Anchorage, Alaska. Scope of Work for each discipline is as follows: Survey Survey t | Bureau of Land Management | 6/30/2009 |
UNIVERSITY OF ALASKA ANCHORAGE | $24,990 | Fish, Wildlife and Plant Conservation Resource Management This agreement is made for the purpose of providing education and employment to local youths from Nome and Unalakleet, Alaska as stimulus to an economically depressed region, as well as developing invasive plant management plans and stewardshihip ethic for ... Show more | Bureau of Land Management | 3/12/2010 |
DOOR SYSTEMS OF ALASKA INC. | $23,840 |
Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National
This spending item is part of a $2,541,074 allocation.
See details
|
National Park Service | 8/26/2010 |
R S A ENGINEERING, INC | $19,750 |
Katmai National Park and Preserve. This project will provide funding to allow RIM Architects and our design team to provide Construction Administration and Commissioning Services for the construction of the King Salmon Maintenance Building for the NPS.
This spending item is part of a $74,250 allocation.
See details
|
National Park Service | 8/31/2010 |
PIONEER DOOR, INC. | $17,550 |
General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i
This spending item is part of a $8,140,651 allocation.
See details
|
National Park Service | 5/12/2010 |
SPECIALTY SUPPLY INC | $16,828 | provided building materials | National Park Service | 8/05/2009 |
DOWL, LLC | $16,645 |
This project shall consist of the preparation bid ready construction documents for a new maintenance facility in King Salmon Alaska. The design team will create detailed plans and specification including all information necessary for construction of a pr
This spending item is part of a $140,891 allocation.
See details
|
National Park Service | 5/19/2010 |
R S A ENGINEERING, INC | $15,905 |
This project shall consist of the preparation of a Request-for-Proposal (RFP) for Design-Build services for a new maintenance facility in King Salmon Alaska. The Design-Build RFP will consist of schematic design drawings and technical specifications neces
This spending item is part of a $48,984 allocation.
See details
|
National Park Service | 7/27/2009 |
CONSTRUCTION SPECIALTIES OF ALASKA, LLC | $14,187 |
General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i
This spending item is part of a $8,140,651 allocation.
See details
|
National Park Service | 5/12/2010 |
RIM ARCHITECTS AK LLC | $12,375 |
This project shall consist of the preparation of a Request-for-Proposal (RFP) for Design-Build services for a new maintenance facility in King Salmon Alaska. The Design-Build RFP will consist of schematic design drawings and technical specifications neces
This spending item is part of a $48,984 allocation.
See details
|
National Park Service | 7/27/2009 |
REID MIDDLETON, INC. | $12,250 |
This project shall consist of the preparation bid ready construction documents for a new maintenance facility in King Salmon Alaska. The design team will create detailed plans and specification including all information necessary for construction of a pr
This spending item is part of a $140,891 allocation.
See details
|
National Park Service | 5/19/2010 |
UGASHIK TRADITIONAL VILLAGE | $11,236 |
Highway Planning and Construction Provide Design services associated with road contained herein an by terms of the Cotract. Contract Type: Subpart J - Fixed Price, Cotract Term: Date of award through 12/31/2010.
This spending item is part of a $81,816 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/09/2010 |
DOWL, LLC | $10,215 |
ON-SITE FIELD ENGINEERING SERVICES DURING CONSTRUCTION OF THE EMERGENCY SERVICES FIRE MANAGEMENT BUILDING AND C-CAMP UTILITIES, DENALI NATIONAL PARK AND PRESERVE, ALASKA
This spending item is part of a $506,540 allocation.
See details
|
National Park Service | 3/15/2010 |
LEMAY ENGINEERING AND CONSULTING | $9,800 |
Tangle Lakes Access Road Improvements is a road rehabilitation project in the Tangle Lakes historical area of Alaska, close to Paxson, Alaska. Which will include surveying, engineering and construction of gabions, road excavation and landscaping.
This spending item is part of a $428,175 allocation.
See details
|
Bureau of Land Management | 5/18/2010 |
SPECIALTY SUPPLY INC | $9,000 | provided building materials | National Park Service | 7/30/2009 |
H M S INC | $7,828 |
This project shall consist of the preparation of a Request-for-Proposal (RFP) for Design-Build services for a new maintenance facility in King Salmon Alaska. The Design-Build RFP will consist of schematic design drawings and technical specifications neces
This spending item is part of a $48,984 allocation.
See details
|
National Park Service | 7/27/2009 |
DOWL, LLC | $7,365 |
This project shall consist of the preparation of a Request-for-Proposal (RFP) for Design-Build services for a new maintenance facility in King Salmon Alaska. The Design-Build RFP will consist of schematic design drawings and technical specifications neces
This spending item is part of a $48,984 allocation.
See details
|
National Park Service | 7/27/2009 |
ALBRIGHT'S COMMERCIAL FLOORS, INC. | $6,600 |
Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National
This spending item is part of a $2,541,074 allocation.
See details
|
National Park Service | 8/26/2010 |
H M S INC | $6,250 |
This project shall consist of the preparation bid ready construction documents for a new maintenance facility in King Salmon Alaska. The design team will create detailed plans and specification including all information necessary for construction of a pr
This spending item is part of a $140,891 allocation.
See details
|
National Park Service | 5/19/2010 |
M&N MASONRY & CONSTRUCTION | $6,225 | great basin national park bat gate | National Park Service | 12/10/2009 |
DOWL, LLC | $5,511 |
This project shall consist of the preparation of a Request-for-Proposal (RFP) for Design-Build services for a new maintenance facility in King Salmon Alaska. The Design-Build RFP will consist of schematic design drawings and technical specifications neces
This spending item is part of a $48,984 allocation.
See details
|
National Park Service | 7/27/2009 |
SHANNON & WILSON, INC. | $5,000 |
ON-SITE FIELD ENGINEERING SERVICES DURING CONSTRUCTION OF THE EMERGENCY SERVICES FIRE MANAGEMENT BUILDING AND C-CAMP UTILITIES, DENALI NATIONAL PARK AND PRESERVE, ALASKA
This spending item is part of a $506,540 allocation.
See details
|
National Park Service | 3/15/2010 |
H M S INC | $3,914 |
Provide on-sight construction management services/field engineering services during the construction of the Front Country Wastewater Treatment system and Rehabilitate Collection System at Denali National Park and Preserve.
This spending item is part of a $387,177 allocation.
See details
|
National Park Service | 4/01/2010 |
DOWL, LLC | $2,186 |
A-E Title III Construction Administration Services,DENA. Project 'Relocate Emergency Services and LE Operations.
This spending item is part of a $77,845 allocation.
See details
|
National Park Service | 2/11/2010 |