Fairbanks North Star County, Alaska, funds by Interior, Department of
Listing $13,647,857.69 in stimulus funds from Interior, Department of for Fairbanks North Star
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
COLASKA INC. | $2,528,044 |
EAST WEST TWIN CREEK CROSSING REHABILITATION.
This spending item is part of a $3,083,114 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/27/2010 |
UNIVERSITY OF ALASKA FAIRBANKS | $2,000,000 | Volcano Hazards Program Research and Monitoring. The University of Alaska Fairbanks Geophysical Institute (UAFGI) plays a unique role in the Alaska Volcano Observatory (AVO). UAFGI was a co-founding member of AVO in 1988. UAFGI personnel have visited and worked all monitored Alaskan volcanoes, and hahave ... Show more | Geological Survey | 12/01/2009 |
University of Alaska | $2,000,000 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Improvement of the Volcano and Other Monitoring Systems | Geological Survey | 11/30/2009 |
State of Alaska | $1,500,000 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Alaska Volcano Investigations and Information Dissemination | Geological Survey | 11/20/2009 |
NENANA LUMBER COMPANY, INC. | $747,554 |
NOME CREEK ADMIN SITE IMPROVEMENTS
This spending item is part of a $945,868 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/15/2010 |
FULLFORD ELECTRIC, INC. | $591,335 |
The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
COLASKA INC. | $563,500 |
HARRISON CREEK RECLAMATION
This spending item is part of a $732,817 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/22/2010 |
C3 LIMITED LIABILITY COMPANY | $555,070 |
EAST WEST TWIN CREEK CROSSING REHABILITATION.
This spending item is part of a $3,083,114 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/27/2010 |
UNIVERSITY OF ALASKA FAIRBANKS | $532,959 | Earthquake Hazards Reduction Program This project is intended to improve the capabilities of the Alaska Earthquake Information Center (AEIC) and the Alaska Seismic Network (ASN) as part of the Advanced National Seismic System (ANSS). Upgrading outdated seismic station instrumentation and com | Geological Survey | 9/30/2009 |
COLASKA INC. | $372,028 |
STEESE HIGHWAY COMFORT STATIONS
This spending item is part of a $509,909 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/06/2010 |
DENA' NENA' HENASH | $342,601 | ARRA Child Care and Development Block Grant The project will increase the availability of after school care services in 38 Interior Alaska, village sites and Fairbanks by funding local culture and language instructors who will provide after school activities in their local schools for program eligi | Indian Affairs (Assistant Secretary) | 4/22/2010 |
JAMES MCGLINCHY | $327,703 |
Rehabilitation of various parking lots and associated work at Fort Wainwright
This spending item is part of a $536,394 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/23/2010 |
CH2M HILL CONSTRUCTORS, INC. | $208,691 |
Rehabilitation of various parking lots and associated work at Fort Wainwright
This spending item is part of a $536,394 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/23/2010 |
C3 LIMITED LIABILITY COMPANY | $198,314 |
NOME CREEK ADMIN SITE IMPROVEMENTS
This spending item is part of a $945,868 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/15/2010 |
C3 LIMITED LIABILITY COMPANY | $169,317 |
HARRISON CREEK RECLAMATION
This spending item is part of a $732,817 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/22/2010 |
DENA' NENA' HENASH | $146,597 | Native American Employment and Training Tanana Chiefs Conference Employment & Training Department Department will use the American Recovery and Reinvestment Act (ARRA) Grant Funds to create jobs and promote economic growth. The ARRA Grant Funded youth program serves eligible low-income youth, | Indian Affairs (Assistant Secretary) | 6/14/2009 |
DENA' NENA' HENASH | $146,597 | To provide employment-related services to youth aged 14 - 24. The main focus is to provide quality, short-term work experience in order for participants to gain long-term employment. | Indian Affairs (Assistant Secretary) | 6/01/2009 |
C3 LIMITED LIABILITY COMPANY | $137,881 |
STEESE HIGHWAY COMFORT STATIONS
This spending item is part of a $509,909 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/06/2010 |
SMALLWOOD CREEK, INC. | $97,000 | return 40 acres of retired homestead/farmland back into wetland habitat. This will be accomplished by creating a wetland (Fen) consisting of a stream channel and anumber of intermittent ponds. | U.S. Fish and Wildlife Service | 8/14/2009 |
ALASKA BIRD OBSERVATORY | $82,854 | The Alaska Bird Observatory (ABO) is pleased to submit this proposal to offer our services to assist the Bureau Land Management (BLM) with the inventory of landbirds on the areas identified in the BLM Request for Qualifications (RFQ). The areas listed in | Bureau of Land Management | 4/14/2010 |
MCM ROE INC. | $62,710 |
Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation.
See details
|
National Park Service | 8/26/2009 |
Oreana Rock & Block LLC | $48,568 |
Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation.
See details
|
National Park Service | 8/26/2009 |
REMOTE POWER INC. | $36,790 |
Recovery-Togiak & Kanuti PV_DHW System: Base Bid of $57,508.84, Phase 1, Design: Contractor shall provide all labor, materials, equipment and supervision necessary to design 1)Solar Photovoltaic (PV) or Hot Water (HW) heating systems for a Hangar in Dill
This spending item is part of a $496,619 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/16/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $34,077 | Recreation Resource Management The award funds services to the BLM Alaska Field Office for work located at Fort Egbert National Historic Landmark, provided by the Student Conservation Association's Conservation Crew program, which recruits and places qualified young people for environm | Bureau of Land Management | 4/29/2010 |
BETTISWORTH NORTH ARCHITECTS AND PLANNERS INC. | $29,989 | Recovery DD and CD documents for Demolition of UST's and Remediation of Contaminated Soils, DENA | National Park Service | 8/06/2009 |
POEHLS CONSTRUCTION LLC | $29,950 | AFS Door Operators | Bureau of Land Management | 6/02/2010 |
POWER COMM., INC. | $29,695 | FDO Lighting Replacement at BLM-AK Office, 1150 University Avenue, Fairbanks, Alaska 99709 | Bureau of Land Management | 9/14/2009 |
POWER COMM., INC. | $29,695 | FDO Lighting Replacement at BLM-AK Office, 1150 University Avenue, Fairbanks, Alaska 99709 | Bureau of Land Management | 9/14/2009 |
TEMSCO HELICOPTERS INC | $29,505 | HELICOPTER SUPPORT | Office of Policy, Management and Budget/Chief Financial Officer | 8/04/2010 |
FRONTIER PLUMBING SUPPLY, INC. | $18,674 | INSULATED PIPE AND FITTINGS | National Park Service | 9/16/2009 |
ALASKA RECLAMATION, INC | $14,105 |
Tangle Lakes Access Road Improvements is a road rehabilitation project in the Tangle Lakes historical area of Alaska, close to Paxson, Alaska. Which will include surveying, engineering and construction of gabions, road excavation and landscaping.
This spending item is part of a $428,175 allocation.
See details
|
Bureau of Land Management | 5/18/2010 |
DENALI FENCEWORKS, LLC | $10,355 |
General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i
This spending item is part of a $8,140,651 allocation.
See details
|
National Park Service | 5/12/2010 |
FRONTIER PLUMBING SUPPLY, INC. | $9,372 | SET OF KRAFTMAID HICKORY CABINETS | National Park Service | 12/03/2009 |
FRONTIER PLUMBING SUPPLY, INC. | $7,671 | 9 EACH TRANE UNIT HEATERS | National Park Service | 6/03/2009 |
FRONTIER PLUMBING SUPPLY, INC. | $5,156 | WATER FILTER MATERIAL | National Park Service | 9/17/2009 |
DESIGN ALASKA INC | $3,500 |
Provide on-sight construction management services/field engineering services during the construction of the Front Country Wastewater Treatment system and Rehabilitate Collection System at Denali National Park and Preserve.
This spending item is part of a $387,177 allocation.
See details
|
National Park Service | 4/01/2010 |