Mohave County, Ariz., funds by Interior, Department of
Listing $10,984,253.77 in stimulus funds from Interior, Department of for Mohave
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HUALAPAI TRIBAL COUNCIL | $2,381,052 | Road Maintenance_Indian Roads pothole patching, crack sealing,chipsealing, and striping, and some bridge repair, h680604, h686069t | Indian Affairs (Assistant Secretary) | 3/25/2010 |
HUALAPAI TRIBAL COUNCIL | $2,381,000 | Pothole patching,crack sealing,chip sealing and striping and some bridge repair | Indian Affairs (Assistant Secretary) | 3/01/2010 |
HUALAPAI TRIBAL COUNCIL | $1,974,024 | Highway Planning and Construction pulverize, grade, shape, compact, and pave 6.083 miles of BIA route 1 and 7. Diamnond Bar road from Boundary to Airport, h68a01 | Indian Affairs (Assistant Secretary) | 1/22/2010 |
HUALAPAI TRIBAL COUNCIL | $1,974,024 | Pulverize, grade, shape,compact,and pave 6.083 miles of BIA Routes # 1 & #7 Diamond Bar Road from Boundary to Airport | Indian Affairs (Assistant Secretary) | 1/22/2010 |
DE LOS SANTOS CONSTRUCTION, INC. | $543,260 | Seismic Rehabilitation of building at the Willow Beach National Fish Hachery, in Mohave County, AZ | U.S. Fish and Wildlife Service | 10/13/2009 |
FORT MOJAVE TRIBAL COUNCIL | $391,556 | Road Maintenance_Indian Roads Route Assessment and rout and bridge maintenance - Crack seal, Debris removal, cleaning, repair/replace hand and guard rails , H516040G, H5160421, H5160403, H516049G | Indian Affairs (Assistant Secretary) | 3/25/2010 |
FORT MOJAVE TRIBAL COUNCIL | $391,556 | ARRA Road Project MOIR Road/Bridge R&R Consolidated No.1 | Indian Affairs (Assistant Secretary) | 3/25/2010 |
BRONZE STAR INC. | $186,312 | MDI Desert Tortoise Fence Install | Bureau of Land Management | 6/02/2010 |
LARON, INC. | $158,766 | Inspection and rebuild of two Fairbanks Morse Pumps, Umatilla Project Office | Bureau of Reclamation | 4/08/2010 |
RED J ENVIRONMENTAL CORPORATION | $138,659 | Old Wild Horse and Burro HAZMAT Clean-up | Bureau of Land Management | 2/05/2010 |
RED J ENVIRONMENTAL CORPORATION | $138,659 | Old Wild Horse and Burro Hazmat Clean-up | Bureau of Land Management | 2/05/2010 |
ARCHITECTURAL & ENVIRONMENTAL ASSOCIATES INC | $75,767 | electrical repairs adn solar PV system design and install3ation | U.S. Fish and Wildlife Service | 12/08/2009 |
AIRBORNE VETERANS SERVICES, INC. | $64,000 | INSTALLATION OF 6 SOLAR POWERED LIGHTS AT THE BOAT RAMP | Bureau of Land Management | 4/01/2010 |
AIRBORNE VETERANS SERVICES, INC. | $64,000 | INSTALLATION OF 6 SOLAR POWERED LIGHTS AT THE BOAT RAMP | Bureau of Land Management | 4/01/2010 |
XCAVATION CO., THE, INC. | $29,308 | Porter Mine access Barrier Installation, L10PS01726 Description of Work: Three inclined shafts closed using bat cupolas. Work consists of fabricating and installing cupolas made of steel bars with an inset series of spaces to allow for bat ingress and egr | Bureau of Land Management | 2/17/2010 |
SOLLERS CONSTRUCTION, LLC | $28,875 | WILD HORSE AND BURRO REHABILITATION PHASE II- Sollers Construction will do the demolition and site remedation services of this said project located in Kingman,Arizona in Mohave county. Demolition includes the removal of identified underground infrastructu | Bureau of Land Management | 5/04/2010 |
XCAVATION CO., THE, INC. | $18,606 | Recovery - Great West Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01723. Description of Work: Fabricate and installation of three bat gates and two cupolas. Work consists of fabricating and installing bat gate ma | Bureau of Land Management | 2/18/2010 |
R L MCDONNELL CONSTRUCTION | $13,550 | Replace Sewer Line | U.S. Fish and Wildlife Service | 11/05/2009 |
Jewett Acoustics LLC | $12,200 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
XCAVATION CO., THE, INC. | $11,690 | Recovery - Fire Mountain Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01662. Description of Work: Fabricate and installation of inclined shaft using one cupola. Work consists of fabricating and installing wildlife | Bureau of Land Management | 2/18/2010 |
XCAVATION CO., THE, INC. | $2,470 | GIGI Girl Mine Access Barrier Installation, Solicitation Number: L10PS01665. Description of Work: Installation of one bat gate on an adit. Work consists of: fabricating and installing bat gate made of steel bars with an inset series of spaces to allow for | Bureau of Land Management | 2/17/2010 |
XCAVATION CO., THE, INC. | $2,470 | Recovery - Mary Nevada Mine (Hulapai Mountains) access Barrier Installation, Solicitation Number: L10PS01671. Description of Work: Fabricate and install bat friendly gate mine closure. Work consists of fabricating and installing bat gate made of steel bar | Bureau of Land Management | 2/20/2010 |
XCAVATION CO., THE, INC. | $2,450 | Recovery - Thumb Butte Mine (Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01664. Description of Work: Fabricate and installation of one bat gate. Work consists of fabricating and installing bat gate made of steel bars with an in | Bureau of Land Management | 2/17/2010 |