Alameda County, Calif., funds by Interior, Department of
Listing $8,315,934.51 in stimulus funds from Interior, Department of for Alameda
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
Mountain Cascade, Inc. | $1,295,407 |
Water Reclamation and Reuse Program Cooperative Agreement between the United States Bureau of Reclamation (USBR) and the Santa Clara Valley Water District (SCVWD) to implement the South County Recycled Water Master Plan which is expected to provide multiple benefits, including: increasing t
This spending item is part of a $1,493,000 allocation.
See details
|
Bureau of Reclamation | 8/31/2010 |
STILLWATER ECOSYSTEM, WATERSHED & RIVERINE SCIENCES | $1,284,073 |
AWARD DESCRIPTION: COMPLETE 1) AN ENVIRONMENTAL REVIEW SUBJECT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) OF THE KLAMATH HYDROELECTRICAL SETTLEMENT AGREEMENT (KHSA), INCLUDING THE SECRETARY OF THE INTER
This spending item is part of a $7,621,124 allocation.
See details
|
Bureau of Reclamation | 3/31/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $1,083,054 | IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Geological Survey | 3/31/2010 |
NORTHERN MANAGEMENT SERVICES, INC. | $966,851 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $721,000 | Earthquake Hazards Reduction Program Earthquakes are a hazard in most parts of California. In northern California, the Berkeley Seismological Laboratory (BSL) and the USGS Menlo Park collaborate closely to provide timely and reliable earthquake information to the federal, state, and local go | Geological Survey | 9/15/2009 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $440,000 | Earthquake Hazards Reduction Program In the San Francisco Bay Area, two million people live in a geologically complex, tectonically active region that has experienced several historic earthquakes. Geodetic measurements show that Bay Area deformation is both spatially complex and varies with | Geological Survey | 2/15/2010 |
JEDCO CONSULTING ENGINEERS, INC. | $437,911 |
The work of this contract consists of the general construction of 3,750 LF of a 10 waterline in Bunker Rd, installation of 940 LF of a 6 waterline ate the horse stables, with service to the blimp hangar, valve vault modifications at the Ft. Barry Water t
This spending item is part of a $1,010,249 allocation.
See details
|
National Park Service | 5/12/2010 |
INNOVATIVE CONSTRUCTION SOLUTIONS-NORCAL | $384,117 |
Davis Mill Removal Action
This spending item is part of a $744,100 allocation.
See details
|
Bureau of Land Management | 3/30/2010 |
TETRA TECH EM, INC. | $298,950 |
Davis Mill Removal Action
This spending item is part of a $744,100 allocation.
See details
|
Bureau of Land Management | 3/30/2010 |
TOPCON POSITIONING SYSTEMS, INC. | $210,634 | IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Geological Survey | 4/01/2010 |
KEARNS & WEST INC | $205,000 |
AWARD DESCRIPTION: COMPLETE 1) AN ENVIRONMENTAL REVIEW SUBJECT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) OF THE KLAMATH HYDROELECTRICAL SETTLEMENT AGREEMENT (KHSA), INCLUDING THE SECRETARY OF THE INTER
This spending item is part of a $7,621,124 allocation.
See details
|
Bureau of Reclamation | 3/31/2010 |
RPR ARCHITECTS | $192,133 | Architectural and Engineering Services to replace seismically unsafe shop building at Sacramento NWR CA. Construction Management and Administration added 2/25/2010. | U.S. Fish and Wildlife Service | 9/21/2009 |
Del Secco Diamond Core & Saw, Inc. | $173,825 |
8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP.
This spending item is part of a $17,480,694 allocation.
See details
|
Bureau of Reclamation | 3/27/2010 |
Magnum Drywall, Inc | $83,693 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
Quality Asbestos Control Inc | $56,475 |
ARRA PMIS 148204 Demo 2 Houses- Demolish 2 Abandoned Houses Ft. Barry & Reveg Landscape
This spending item is part of a $142,860 allocation.
See details
|
National Park Service | 5/06/2010 |
EAST COUNTY GLASS & WINDOW INC | $54,458 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
TOPCON POSITIONING SYSTEMS, INC. | $53,928 | IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Geological Survey | 3/31/2010 |
SIEGEL & STRAIN ARCHITECTS | $47,750 |
GOGA 65433 Radio Infrastructure - Construction Phase Services; Building 314, The Presidio, San Francisco
This spending item is part of a $384,274 allocation.
See details
|
National Park Service | 3/25/2010 |
Surface Preparation Solutions, LLC | $45,177 |
22000sf metal building for civil maintenance
This spending item is part of a $6,753,706 allocation.
See details
|
Bureau of Reclamation | 8/03/2010 |
COMBINED EFFORT, INC. | $42,420 | Remove and replace boundary fence at the Salinas National Wildlife Refuge. | U.S. Fish and Wildlife Service | 11/25/2009 |
ALLIED ENVIRONMENTAL INC. | $40,200 |
The Work consists of removing several abandoned structures, building remnants, and other potentially hazardous building features from the Wawona district housing area in Yosemite National Park. Work entails complete removal of all structures, foundations
This spending item is part of a $725,670 allocation.
See details
|
National Park Service | 4/29/2010 |
STILLWATER ECOSYSTEM, WATERSHED & RIVERINE SCIENCES | $35,685 |
Environmental Assessment at Golden Gate National Recreation Area (Alcatraz Island) evaluating installating a submarine cable in SF Bay and putting photovolatic panels on buildings on Alcatraz Island to remove the island from diesel generation as a primary
This spending item is part of a $134,918 allocation.
See details
|
National Park Service | 7/29/2009 |
Cody Electric Inc A Corp | $27,900 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
Lyons Brothers Plumbing | $24,075 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
MARATHON PRODUCTS | $22,390 | Temperature monitoring | Geological Survey | 9/08/2009 |
Sure Fire Protection Company Incorporated | $16,000 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
TOPCON POSITIONING SYSTEMS, INC. | $14,199 | IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | Geological Survey | 4/01/2010 |
DEL TERRA INC | $11,780 | Survey Mayhew landing tract 219 | U.S. Fish and Wildlife Service | 7/13/2009 |
Energy Solutions | $11,078 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
SCA ENVIRONMENTAL, INC | $10,855 |
GOGA 65433 Radio Infrastructure - Construction Phase Services; Building 314, The Presidio, San Francisco
This spending item is part of a $384,274 allocation.
See details
|
National Park Service | 3/25/2010 |
AAA Water Systems, Inc | $9,700 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |
RPR ARCHITECTS | $8,972 | Architectural design services for the Modoc Bunkhouse/ Quarters Replacement. | U.S. Fish and Wildlife Service | 9/24/2009 |
Preston-Holmes, Inc. | $6,245 |
San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur
This spending item is part of a $1,200,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/03/2009 |