Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Contra Costa County, Calif., funds by Interior, Department of

Listing $25,383,238.33 in stimulus funds from Interior, Department of for Contra Costa

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
FLATIRON WEST, INC. $14,025,512 Widen existing canal, construct fish screen structure and new irrigation pump system for local ranchers Bureau of Reclamation 5/06/2010
CONTRA COSTA WATER DISTRICT $8,350,000 Central Valley Project Improvement Act, Title XXXIV he construction of a fish screen will: 1. Minimize the entrainment of fish resources associated with the diversion of water at the Canal Rock Slough intake. 2. Reduce potential predation on target species in the Rock Slough intake. 3. Fulfill legal ... Show more Bureau of Reclamation 9/29/2009
ENTRIX, INC. $883,566 AWARD DESCRIPTION: COMPLETE 1) AN ENVIRONMENTAL REVIEW SUBJECT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) OF THE KLAMATH HYDROELECTRICAL SETTLEMENT AGREEMENT (KHSA), INCLUDING THE SECRETARY OF THE INTER
This spending item is part of a $7,621,124 allocation. See details
Bureau of Reclamation 3/31/2010
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. $810,709 Design and construction of remediation systems for two abandoned mercury mine operations.
This spending item is part of a $1,032,230 allocation. See details
U.S. Fish and Wildlife Service 9/23/2010
DELTA DIABLO SANITATION DISTRICT $690,859 Water Reclamation and Reuse Program Funding for the Antioch Recycled Water Project will be used to expand the water reuse system to establish recycled water service for use as landscape irrigation at municipal parks, medians, and other green spaces along the pipeline alignment. Bureau of Reclamation 4/29/2010
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. $318,853 Design and construction of remediation systems for abandoned mercury mine operations.
This spending item is part of a $462,675 allocation. See details
U.S. Fish and Wildlife Service 9/23/2010
OSCAR NIEMETH TOWING, INC. $97,795 The scope of work is to install auxiliary shoring and debris containment equipment on or around the historic Steam Schooner Wapama and the barge upon which she is located and to remove all objects and materials unrelated to her stabilization from the barg
This spending item is part of a $255,290 allocation. See details
National Park Service 3/11/2010
Redwood Painting Co., Inc. $95,135 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
KEEFE KAPLAN MARITIME, INC. $65,830 Supply and install safety equipment for the research vessel Turning Tide including canister life raft, rails, zodiac, modifying vessel for installation of safety equipment and rot repair. Geological Survey 7/29/2009
ABIDE INTERNATIONAL, INC. $35,236 ADA RESTROOM BUILDOUT
This spending item is part of a $40,164 allocation. See details
National Park Service 12/16/2009
A R VENKATESH $4,815 ARRA - HATCH PT RD DELINEATOR POST/SIGNS Bureau of Land Management 7/20/2009
Lewis M. Merlo, Inc $2,475 ADA RESTROOM BUILDOUT
This spending item is part of a $40,164 allocation. See details
National Park Service 12/16/2009
D.S. Baxley, Inc. $2,453 ADA RESTROOM BUILDOUT
This spending item is part of a $40,164 allocation. See details
National Park Service 12/16/2009