San Bernardino County, Calif., funds by Interior, Department of
Listing $65,029,516.06 in stimulus funds from Interior, Department of for San Bernardino
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FLATIRON WEST, INC. | $8,460,246 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $7,890,000 | Water Reclamation and Reuse Program The design and construction of the Northwest Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program. | Bureau of Reclamation | 12/23/2009 |
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $5,938,454 | Water Reclamation and Reuse Program The design and construction of the Northeast Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program | Bureau of Reclamation | 12/22/2009 |
DDH APPLE VALLEY CONSTRUCTION, INC. | $5,546,653 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
BOWE CONTRACTORS, INC. | $4,906,462 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
Rbf | $4,475,000 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
Rbf | $4,230,425 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
YUCAIPA VALLEY WATER DISTRICT | $4,146,000 | Water Reclamation and Reuse Program Phases I, II and III of the Yucaipa Valley Regional Brineline, a component of the Yucaipa Valley Regional Water Supply Renewal Project. Phase I includes approximately 4.3 miles of 12-inch pipeline, and Phase II includes approximately 4.5 miles of 16-inch | Bureau of Reclamation | 3/29/2010 |
Houalla Enterprises Ltd. | $3,725,070 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
C3 LIMITED LIABILITY COMPANY | $3,214,590 | CONSTRUCT CANAL INLET AND FIRE BREAK AT TOPOCK HAVASU NATIONAL WILDLIFE REFUGE. | U.S. Fish and Wildlife Service | 3/26/2010 |
FLATIRON WEST, INC. | $3,042,073 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
DDH APPLE VALLEY CONSTRUCTION, INC. | $2,308,949 |
Water 2025 Construction of the Oro Grande Wash Recharge Project
This spending item is part of a $3,609,079 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
BOWE CONTRACTORS, INC. | $1,624,781 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
BEST DRILLING AND PUMP, INC. | $1,614,599 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
BEST DRILLING AND PUMP, INC. | $822,070 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
New Image Commercial Flooring Incorporated | $750,206 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
K.J. CAIN COMPANY | $400,353 | Provide all labor and equipment, tranpertation, insurance and tax to recondition 3 mile of Kelso Dunns Rd. | National Park Service | 8/28/2009 |
URS GROUP, INC. | $301,497 | TAS::14 1610::TAS IRRIGATION IMPROVEMENTS. Conceptul and final designs for the irrigation improvements at Topock Marsh on the Havasu National Wildlife Refuge. | U.S. Fish and Wildlife Service | 11/12/2009 |
CONSERVATION CORPS, CALIFORNIA | $247,000 | Conservation Activities by Youth Service Organizations The work entails installing exclusionary fencing and signage to enhance visitor safety. Some limited site cleanup will also be included. | National Park Service | 12/23/2009 |
B C SCHMIDT CONSTRUCTION, INC | $211,684 |
Construction services relating to the mitigation of physical safety min hazards in the CInder COnes National Natural Landmark, Mojava National Preserve. Restore and re contour large and smaller cuts on the souther cone. Restore access to the eastern slo
This spending item is part of a $235,147 allocation.
See details
|
National Park Service | 11/17/2009 |
SYGNOS, INC. | $156,000 |
INSTALL SAFETY CLOSURES AT ABANDONED MINE LOCATIONS TO PROTECT VISITORS AND PRESERVE RESOURCE HABITAT AT THE JOSHUA TREE NATIONAL PARK.
This spending item is part of a $525,000 allocation.
See details
|
National Park Service | 4/02/2010 |
B C SCHMIDT CONSTRUCTION, INC | $95,906 |
Construction services to meet the requirements to render the mine sites safe and the declines, shafts, and adit underground pathways inaccessible to the public by means of utilizing a bat gate design, shaft and decline closure designs with bats present, s
This spending item is part of a $119,369 allocation.
See details
|
National Park Service | 11/17/2009 |
CONSERVATION CORPS, CALIFORNIA | $85,000 | Conservation Activities by Youth Service Organizations Project includes landscaping & grooming around campsites, picnic areas and comfort stations; repair & replace trail, trailhead & campground signs; restore hard surface of ADA compliant trail; repair or replace fire rings/grates, picnic tables andnd BBQ pits... Show more | National Park Service | 4/12/2010 |
Arizona Mine Reclamation L.L.C. | $82,604 |
The overall purpose of the project is to mitigate physical safety hazards presented by the a number of mine features at the Death Valley Mine. The project consists of the stabilization of four deep declines and one shaft and the installation of protective
This spending item is part of a $105,298 allocation.
See details
|
National Park Service | 11/17/2009 |
Wallcrete Industries, Inc. | $82,215 |
Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation.
See details
|
National Park Service | 8/26/2009 |
STROLE'S TRI SERVICE INCORPORATED | $81,059 | Turtle Mountain Wilderness Abandoned Mine Lands. | Bureau of Land Management | 3/29/2010 |
MACTEC ENGINEERING AND CONSULTING, INC. | $77,015 |
Bat Surveys of a series of abandoned mines in Mojave National Preserve, California.
This spending item is part of a $137,139 allocation.
See details
|
National Park Service | 7/15/2009 |
COMPUMERIC ENGINEERING, INC. | $73,524 | BEAR PROOF TRASH CONTAINERS AND DUMPSTERS FOR BIGHORN CANYON RECREATION AREA | National Park Service | 3/05/2010 |
CONSERVATION CORPS, CALIFORNIA | $59,224 | Conservation Activities by Youth Service Organizations Project includes rehabilitation of trail, constructing water diversion and erosion control devices, rehabilitate and repair stone retaining walls, reconstruct switchbacks and reroute sections of trail, trim vegetation, repair and replace trail sisigns Ame... Show more | National Park Service | 3/23/2010 |
CHEMEHUEVI INDIAN TRIBE | $50,983 | Highway Planning and Construction Tribal Project Management and construction activities(pothole patching, crak sealing) on 2.1 miles of Route 2, H51A06 | Indian Affairs (Assistant Secretary) | 8/04/2010 |
HOLISTIC WILDLIFE SERVICES | $47,030 |
Bat Surveys of a series of abandoned mines in Mojave National Preserve, California.
This spending item is part of a $137,139 allocation.
See details
|
National Park Service | 7/15/2009 |
LEARNING PLUS ASSOCIATES | $44,049 | SUPPLIMENTAL CURRICULUM | Indian Affairs (Assistant Secretary) | 7/20/2011 |
CONSERVATION CORPS, CALIFORNIA | $40,000 | Conservation Activities by Youth Service Organizations Project includes rehabilitation of trail, constructing water diversion and erosion control devices, rehabilitate and repair stone retaining walls, reconstruct switchbacks and reroute sections of trail, trim vegetation, repair and replace trail sisigns and d... Show more | National Park Service | 3/23/2010 |
Tk Systems Inc | $37,825 |
22000sf metal building for civil maintenance
This spending item is part of a $6,753,706 allocation.
See details
|
Bureau of Reclamation | 8/03/2010 |
Inland Building Construction Companies Inc. | $31,307 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
ELLIS FENCE CO | $30,537 | Fence Supplies Delivered | National Park Service | 1/12/2010 |
BURLESON CONSULTING, INC. | $23,463 |
Construction services relating to the mitigation of physical safety min hazards in the CInder COnes National Natural Landmark, Mojava National Preserve. Restore and re contour large and smaller cuts on the souther cone. Restore access to the eastern slo
This spending item is part of a $235,147 allocation.
See details
|
National Park Service | 11/17/2009 |
BURLESON CONSULTING, INC. | $23,463 |
Construction services to meet the requirements to render the mine sites safe and the declines, shafts, and adit underground pathways inaccessible to the public by means of utilizing a bat gate design, shaft and decline closure designs with bats present, s
This spending item is part of a $119,369 allocation.
See details
|
National Park Service | 11/17/2009 |
TEL TECH PLUS, INC. | $22,694 |
The overall purpose of the project is to mitigate physical safety hazards presented by the a number of mine features at the Death Valley Mine. The project consists of the stabilization of four deep declines and one shaft and the installation of protective
This spending item is part of a $105,298 allocation.
See details
|
National Park Service | 11/17/2009 |
SWCA, INCORPORATED | $13,094 |
Bat Surveys of a series of abandoned mines in Mojave National Preserve, California.
This spending item is part of a $137,139 allocation.
See details
|
National Park Service | 7/15/2009 |
FORT MOJAVE TRIBAL COUNCIL | $9,781 |
Highway Planning and Construction Tribal Mgt and pre-construction activities (planning, survey, design, archeology, environmental, right-of-way) to develop PS&E documents for the reconstruction of Hulet Road, H51A0200, and to develop PS&E documents for reconstruction of California Village
This spending item is part of a $464,980 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 1/28/2010 |
2R DRILLING, INC. | $6,630 |
ARCHITECTURAL & ENGINEERING DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT SERVICES FOR THE FURNACE CREEK-DEATH VALLEY VISITOR CENTER REHABILITATION PROJECT, LOCATED AT DEATH VALLEY NATIONAL PARK, CA.
This spending item is part of a $809,281 allocation.
See details
|
National Park Service | 1/29/2010 |
MOJAVE WATER AGENCY | $0 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
MOJAVE WATER AGENCY | $0 |
Water 2025 Construction of the Oro Grande Wash Recharge Project
This spending item is part of a $3,609,079 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |