Shasta County, Calif., funds by Interior, Department of
Listing $10,864,833.57 in stimulus funds from Interior, Department of for Shasta
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ERICK AMMON INC | $2,963,563 |
Rehabilitation of the Lowden Ranch Area
This spending item is part of a $3,047,918 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
ERICK AMMON INC | $1,785,018 |
Rehabilitation of the Reading Creek Site
This spending item is part of a $1,848,135 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
WILDLANDS INC | $949,609 | Revegetation Services to stabilize actively eroding areas at the Crystal Creek Quarry, Whiskeytown National Recreation Area, CA | National Park Service | 5/07/2010 |
WILDLANDS INC | $949,609 | Revegetation Services to stabilize actively eroding areas at the Crystal Creek Quarry, Whiskeytown National Recreation Area, CA | National Park Service | 5/07/2010 |
SPARK ELECTRIC CO., INC. | $528,196 | Recovery-Sacramento River Rail Trail Paving | Bureau of Land Management | 3/10/2010 |
PIT RIVER TRIBAL COUNCIL | $467,759 | Road Maintenance_Indian Roads Operation and Administration of the Indian Reservation Roads Program. High Way Planning and Construction Program. | Indian Affairs (Assistant Secretary) | 9/27/2010 |
TULLIS, INC. | $449,720 |
Paving approximately 6.8 miles of trail complete with shoulder backing and striping. One 3 lift of hot asphalt concrete will be placed and compacted to a width of 8' over the entire length of the existing trail. Shoulder backing will be placed adjacent
This spending item is part of a $514,275 allocation.
See details
|
Bureau of Land Management | 3/03/2010 |
TULLIS, INC. | $419,840 |
Keswick Area Rail Trail Paving
This spending item is part of a $767,440 allocation.
See details
|
Bureau of Land Management | 9/10/2010 |
KEVCON, INC. | $349,585 |
Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu
This spending item is part of a $1,289,000 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
KEN'S WATER TENDER INC | $300,475 |
Keswick Area Rail Trail Paving
This spending item is part of a $767,440 allocation.
See details
|
Bureau of Land Management | 9/10/2010 |
KENS WATER TENDER INC | $238,431 | Motion Creek stream Crossing | Bureau of Land Management | 7/23/2010 |
T L PETERSON INC | $143,990 | Lava Beds National Monument Realign Medicine Lake Road Intersection with main park road. Remove section of Gillem's Camp parking area and install concrete curbing, walks, and curb cut with minor asphalt patching. | National Park Service | 5/13/2010 |
GREGORY, THOMAS | $130,031 | Sac River Bend irrigation pipline construction. Install 5400' of 8 irrigation line. | Bureau of Land Management | 6/01/2010 |
CONSERVATION CORPS, CALIFORNIA | $125,000 | Forests and Woodlands Resource Management To provide youth a safe education job experience, prepare them for entering the workforce by exposing them to a variety of work experience, basic skills training and a structured work environment. Lower fire hazard in the Keswick Basin by reducing fuels | Bureau of Land Management | 9/15/2009 |
PIT RIVER TRIBAL COUNCIL | $98,827 | ARRA Roads Maintenance Program | Indian Affairs (Assistant Secretary) | 3/23/2010 |
PIT RIVER TRIBAL COUNCIL | $98,827 | Road Maintenance_Indian Roads Roads and repairs restoration grant/contract. | Indian Affairs (Assistant Secretary) | 3/19/2010 |
EDS Engineering & Land Surveying | $84,355 |
Rehabilitation of the Lowden Ranch Area
This spending item is part of a $3,047,918 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
SPARK ELECTRIC CO., INC. | $64,555 |
Paving approximately 6.8 miles of trail complete with shoulder backing and striping. One 3 lift of hot asphalt concrete will be placed and compacted to a width of 8' over the entire length of the existing trail. Shoulder backing will be placed adjacent
This spending item is part of a $514,275 allocation.
See details
|
Bureau of Land Management | 3/03/2010 |
EDS Engineering & Land Surveying | $63,118 |
Rehabilitation of the Reading Creek Site
This spending item is part of a $1,848,135 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
TULLIS, INC. | $61,484 | Recovery - Sac River Bend Area Paving | Bureau of Land Management | 4/02/2010 |
SUMMITT FORESTS INC | $60,282 | FRENCH GULCH THIN TASK ORDER ON CONTRACT #L07PC90147 | Bureau of Land Management | 8/10/2009 |
SUMMITT FORESTS INC | $60,282 | Interlakes Thinning and Fuels Reduction, Shasta County | Bureau of Land Management | 8/10/2009 |
CONSERVATION CORPS, CALIFORNIA | $60,000 | Conservation Activities by Youth Service Organizations CCC will provide labor to rehabilitate trails and perform roadside clean up in Whiskeytown National Recreation Area | National Park Service | 2/03/2010 |
MUNSON PUMP SERVICES | $50,000 |
Construction of the Red Bluff Pumping Plant and Fish Screen Canal, Siphon and Access Bridge located near Red Bluff Diversion Dam on the Sacramento River, approximately 2 miles southeast of the City of Red Bluff, California in Tehama County. Construction c
This spending item is part of a $22,955,602 allocation.
See details
|
Bureau of Reclamation | 12/21/2009 |
DAYLIGHT VEGETATION MANAGEMENT, LLC | $45,310 | fuels management | Bureau of Land Management | 6/01/2010 |
DAYLIGHT VEGETATION MANAGEMENT, LLC | $42,551 | MECHANICAL FUELS TREATMENT GRINDING | Bureau of Land Management | 5/20/2010 |
HANKIN SPECIALTY ELEVATORS, INC. | $39,556 | INSTALL VERTICAL PLATFORM LIFT AND HAVE IT INSPECTED | Bureau of Reclamation | 6/09/2010 |
KAPEL CONSTRUCTION INC. | $35,000 |
Keswick Area Rail Trail Paving
This spending item is part of a $767,440 allocation.
See details
|
Bureau of Land Management | 9/10/2010 |
AMERGREEN, INC. | $26,883 | The contract is for the procurement of life and safety equipment. The contract requires the delivery of Self-Luminous Exit Signs; 68 Single face, 24 Double face, and 8 custom faced; and 9 Exit door panic hardware kits. | Bureau of Reclamation | 5/13/2010 |
OUTDOOR CREATIONS, INC. | $24,281 | Manufacture and deliver 20 concerete trash cans and 20 concrete picnic tables | Bureau of Land Management | 2/26/2010 |
SHASTA-TEHAMA-TRINITY JOINT COMMUNITY COLLEGE DISTRICT | $20,000 | Fish, Wildlife and Plant Conservation Resource Management Recipient with guidance from the BLM will collect selected plants/seeds for ecological restoration projects. Recipient will provide BLM botanist and biologist with assistance with restoration, seed collections and propagation of important spececies for rest... Show more | Bureau of Land Management | 11/25/2009 |
SHASTA-TEHAMA-TRINITY JOINT COMMUNITY COLLEGE DISTRICT | $20,000 | Fish, Wildlife and Plant Conservation Resource Management Recipient with guidance from the BLM will collect selected plants/seeds for ecological restoration projects. Recipient will provide BLM botanists and biologist with assistance with resrotation. College students will be employeed to propagate e and care for... Show more | Bureau of Land Management | 11/25/2009 |
WARNER ENTERPRISES, INC | $19,338 | STEWARDSHIP CONTRACT INVOLVING FOREST RESTORATION WITH BIOMASS. | Bureau of Land Management | 3/31/2010 |
Laing Construction Inc | $15,980 |
Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu
This spending item is part of a $1,289,000 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
HOWARD CONSTRUCTION | $14,925 | Installed seven (7) ten foot tall garage doors.Old roors removed and disposed of.Install new sheet metal trim and interior locks. | U.S. Fish and Wildlife Service | 8/11/2009 |
OUTDOOR CREATIONS, INC. | $14,787 | Manufacture and deliver 20 picnic tables and 3 firepits | National Park Service | 10/27/2009 |
APPLY-A-LINE INC | $12,125 |
Keswick Area Rail Trail Paving
This spending item is part of a $767,440 allocation.
See details
|
Bureau of Land Management | 9/10/2010 |
OUTDOOR CREATIONS, INC. | $9,123 | Manufacture and deliver 8 custom picnic tables | National Park Service | 11/05/2009 |
JS MECHANICAL, INC. | $6,828 | replace HVAC in lab building Nevada Fish Health in Anderson ,CA | U.S. Fish and Wildlife Service | 8/21/2009 |
ENTERPRISE RENT-A-CAR COMPANY OF SACRAMENTO | $6,676 | rental of two pick up trucks | National Park Service | 6/10/2009 |
HOWARD CONSTRUCTION | $5,558 | Install solar window films and window awnings on two buildings at the Coleman Fish Hatchery/CA-NV Fish Health Center. | U.S. Fish and Wildlife Service | 10/22/2009 |
HOWARD CONSTRUCTION | $3,360 | Installed necessary attic insulation in two buildings of the Coleman Fish Hatchery. | U.S. Fish and Wildlife Service | 10/22/2009 |