Denver County, Colo., funds by Interior, Department of
Listing $7,413,928.15 in stimulus funds from Interior, Department of for Denver
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
URS GROUP, INC. | $677,158 |
Canal Inspections for Urbanized Areas - Canal Inspections for Urbanized Areas - onsite inspections to collect data associated with canals in proximity of urbanized areas, analysis of inspection data and follow up inspections as required
This spending item is part of a $3,254,393 allocation.
See details
|
Bureau of Reclamation | 12/29/2009 |
URS GROUP, INC. | $543,239 | TAS::14 1041::TAS RECOVERY ARCHITECT-ENGINEERING SERVICES FOR DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS AND PERMITTING RELATED TO RESTORATION OF EAST CAPE AND HOMESTEAD CANAL PLUGS (AKA DAMS), EVERGLADES NATIONAL PARK, FLORIDA. NPS PMIS # EVER-15 | National Park Service | 8/07/2009 |
URS GROUP, INC. | $490,920 |
Onsite Inspection of Dewatered Urbanized Canals. Bureau of Reclamation Project No. 8.000, TAS::14 0681::TAS
This spending item is part of a $2,257,932 allocation.
See details
|
Bureau of Reclamation | 7/16/2010 |
TETRA TECH, INC. | $422,921 | Title III (Construction Phase Services) for the construction of a wastewater treatment plant at Madison Junction, Yellowstone National Park. | National Park Service | 2/26/2010 |
TETRA TECH, INC. | $422,921 | Title III (Construction Phase Services) for the construction of a wastewater treatment plant at Madison Junction, Yellowstone National Park. | National Park Service | 2/26/2010 |
SHANNON & WILSON, INC. | $408,840 |
Canal Inspections for Urbanized Areas - Canal Inspections for Urbanized Areas - onsite inspections to collect data associated with canals in proximity of urbanized areas, analysis of inspection data and follow up inspections as required
This spending item is part of a $3,254,393 allocation.
See details
|
Bureau of Reclamation | 12/29/2009 |
DHM DESIGN CORPORATION | $398,502 | Stablization of Ellis Island Baggage and Dormitory Building, Ellis Island, New York Hazmat Inspection and Report, Design Development & Construction Document Services. The building is a 3-story 121,000 square foot structure originally building in 1908. | National Park Service | 7/02/2009 |
URS Group, Inc | $387,593 |
Abandoned Rock Mine Surveys in Arizona with NEPA
This spending item is part of a $1,225,308 allocation.
See details
|
National Park Service | 8/24/2009 |
GREENING YOUTH FOUNDATION, INC | $299,557 | Conservation Activities by Youth Service Organizations GYF in partnership with NPS IMR to manage the Recruitment training and implementation of student corps member for the GREEN Project in Arizona and New Mexico National Parks. | National Park Service | 9/15/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $259,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings withing the BLM fiels office area. These openings pose the threat of injury or death to visitors on public land. | Bureau of Land Management | 3/18/2010 |
SHORT AND BRENNAN ARCHITECTS | $232,071 |
Planning, Design, and Engineering services for the Kanab Visitors Center.
This spending item is part of a $571,269 allocation.
See details
|
Bureau of Land Management | 8/31/2009 |
URS GROUP, INC. | $208,217 | Architectural / Engineering (A/E) Construction-Phase services for the Replace Two Failed Plugs (Dams) At Cape Sable Construction Project. The work under this task order is for title III Architect-Engineer services for the Replace Two Failed Plugs (Dams) A | National Park Service | 5/11/2010 |
LANDMARK ENVIRONMENTAL, INC | $192,127 |
The elevator system at Carlsbad Caverns exist in two 750-foot vertical shafts, drilled and blasted through limestone rock, into the underground cavern space. The older and smaller shaft houses freight elevators 1and 2. The newer and larger shaft houses
This spending item is part of a $335,202 allocation.
See details
|
National Park Service | 9/07/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $158,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings within the area of the BLM field office. These openings pose the treat of injury or death to visitors on public land. | Bureau of Land Management | 1/29/2010 |
BRS ARCHITECTURE + DHM DESIGN A JOINT VENTURE | $139,326 | SCOPE OF WORK CHANGES: The contractor shall complete the work noted in the attached document titled and dated: Scope of Services, 06/17/10. Revision to Completed Construction Drawings for TICA Cave Exit Shelter Rockfall Protection | National Park Service | 10/15/2009 |
REGENTS OF THE UNIVERSITY OF COLORADO, THE | $129,571 | Abandoned Mine Hazard Mitigation Cooperative Agreement Number H2306103507 was entered into by and between the Department of the Interior, National Park Service, (NPS), and the University of Colorado Denver for the purpose of G?Development of a Spatial Data Clearinghouse and Interface for | National Park Service | 4/30/2010 |
WAZEE COMPANIES, LLC | $128,642 | This Federal award is for the fabrication of a ring seal gate hoist system. | Bureau of Reclamation | 12/23/2009 |
Lee Mathews Equipment Inc | $126,512 |
This project includes providing all materials, equipment, some minor design, and labor required to completely reconstruct four (4) permanent water pumping stations located on the Green River in Browns Park National Wildlife Refuge, Colorado for use in wet
This spending item is part of a $920,932 allocation.
See details
|
U.S. Fish and Wildlife Service | 1/29/2010 |
MEP ENGINEERING INC | $95,860 |
Contract Administrative Services for HVAC project at Greyhills Academy High School
This spending item is part of a $163,582 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 8/25/2010 |
ANDERSON MASON DALE ARCHITECTS, P.C. | $90,360 |
Farmington Title III Construction RFI responses.
This spending item is part of a $454,811 allocation.
See details
|
Bureau of Land Management | 5/03/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $90,242 | National Park Service awarded Parsons this task to prepare an Environmental Assessment (EA) and Biological Assessment (BA) for Multi-Mines in Death Valley and Environmental Assessment for the Keane Wonder Mine in Death Valley. Parsons will assess closure | National Park Service | 9/18/2009 |
ERO RESOURCES CORPORATION | $88,000 | Perform Class- 3 Cultural inventory, evaluate, and report for the Kash Katewe Tent Rocks National Monument area in New Mexico | Bureau of Land Management | 3/02/2010 |
Lam-Wood Systems, Inc. | $87,402 |
Design build energy efficient headquarters/administrative/visitor building in Audubon NWR, ND.
This spending item is part of a $6,057,444 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/10/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $87,300 | Recreation Resource Management Improve management strategies, focusing on improving annual census techniques while increasing population size and sustainability. | Bureau of Land Management | 4/29/2010 |
LANDMARK ENVIRONMENTAL, INC | $85,747 |
This project will serve to rehabilitate the Many Glacier Hotel in Glacier National Park, MT. The hotel is in an advanced state of deterioration and requires immediate rehabilitation to address critical health and life-safety needs and comply with buildin
This spending item is part of a $251,003 allocation.
See details
|
National Park Service | 6/30/2010 |
YEH AND ASSOCIATES, INC | $79,398 |
Planning, Design, and Engineering services for the Kanab Visitors Center.
This spending item is part of a $571,269 allocation.
See details
|
Bureau of Land Management | 8/31/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $70,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings within the area of the BLM Gunnison field office. These openings pose the threat of injury or death to visitors on public land. | Bureau of Land Management | 12/10/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $60,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings within the area of the BLM Montrose County field office. These openings pose the threat of injury or death to visitors on public land. | Bureau of Land Management | 12/22/2009 |
YEAR ONE, INC | $60,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The overall purpose of the project is to implement weed control, establish a new trail corridor and some fence construction if time allows. Houndstongue will be targeted for eradication while mullein, thistle, and Russian olive wiwill be reduced as much as ... Show more | U.S. Fish and Wildlife Service | 7/27/2009 |
URS GROUP, INC. | $58,626 | Prepare Environmental Site Assessments and provide additional environmental screening data for the LEKT Wastewater system at Olympic National Park in Port Angeles, WA for use by NPS. | National Park Service | 2/22/2010 |
SHORT AND BRENNAN ARCHITECTS | $57,589 |
Construction Administration, construction observation, and LEED Commissioning of the Kanab Office Building, Kanab, UT
This spending item is part of a $338,817 allocation.
See details
|
Bureau of Land Management | 8/27/2010 |
BARKER, RINKER, SEACAT ARCHITECTURE, P.C. | $52,404 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $48,136 | National Park Service awarded Parsons this task order to prepare an environmental assessment (EA) to assess closure options and environmental impacts to mitigate safety and environment hazards at abandoned mine lands in Mojave National Preserve. Work for | National Park Service | 9/18/2009 |
Fitzpatrick Engineering Inc | $46,800 |
Electrical Engineering Quality Assurance Services. Time-frame: Approx January 4, 2010 through 9/30/2012. Work is full-time to part-time as required. The Denver Service Center , Technical 'Branch of the Design and construction division performs quality
This spending item is part of a $94,743 allocation.
See details
|
National Park Service | 1/13/2010 |
ENERMODAL ENGINEERING INC | $44,444 |
Rehabilitate Lincoln Memorial Reflecting Pool and Grounds - Design Services
This spending item is part of a $2,056,053 allocation.
See details
|
National Park Service | 12/23/2009 |
COLORADO PAINT COMPANY II | $43,132 | Waterborne Traffic Paint | Indian Affairs (Assistant Secretary) | 3/15/2010 |
YEH AND ASSOCIATES, INC | $39,156 | Big Horn Gas Station Task II scope of services. | Bureau of Land Management | 1/27/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $38,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mine openings within the area of the BLM field office. These openings pose the threat of injury or death to visitors on public land. | Bureau of Land Management | 1/04/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $36,177 | Environmental Quality and Protection Resource Management Construction activities to close harardous mine openings within the area of the BLM field office. These openings pose the treat of injury or death to visitors on public land. | Bureau of Land Management | 1/04/2010 |
ERO RESOURCES CORPORATION | $31,621 | Environmental assessment of or near Veterans Lake Trail, in the Chickasaw National Recreation Area. | National Park Service | 8/18/2009 |
YEH AND ASSOCIATES, INC | $31,129 | Structural Analysis of the Big Horn Gas Station Structure. | Bureau of Land Management | 12/03/2009 |
Steve Stock & Associates, Inc. | $30,345 |
The overall purpose of this award is to perform High-Pressure Gate Modifications at Pinto Dam, located on the Columbia Basin Project in the State of Washington. AUS (Associated Underwater Services, Inc.) expects to successfully complete this project usin
This spending item is part of a $1,093,850 allocation.
See details
|
Bureau of Reclamation | 4/19/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $30,000 | Environmental Quality and Protection Resource Management Construction activites to close hazardous mine openings within the area of the BLM Gunnison field office. These openings pose the threat of injury or death to visitors on public land. | Bureau of Land Management | 8/13/2009 |
R & R ENGINEERS AND SURVEYORS, INC. | $30,000 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $30,000 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover t the opening.... Show more | Bureau of Land Management | 9/15/2009 |
SHORT AND BRENNAN ARCHITECTS | $28,209 |
Ruby Mountain hot Shot CA Title III Services
This spending item is part of a $260,764 allocation.
See details
|
Bureau of Land Management | 6/30/2010 |
LANDMARK ENVIROMENTAL, INC | $27,099 |
This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park
This spending item is part of a $227,533 allocation.
See details
|
National Park Service | 11/24/2009 |
DHM DESIGN CORPORATION | $26,708 |
This project consisted of an onsite Design Charette for Juniper Campground at Bandelier National Monument in New Mexico. Members from the A/E team travelled to the site to conduct the meeting in which discussions were held and to provide analysis of the
This spending item is part of a $41,043 allocation.
See details
|
National Park Service | 9/04/2009 |
LANDMARK ENVIROMENTAL, INC | $21,473 |
This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. This specific Task Order is concerned with developing the Schematic Design drawings t
This spending item is part of a $116,929 allocation.
See details
|
National Park Service | 9/04/2009 |
DHM DESIGN CORPORATION | $20,542 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
BARKER, RINKER, SEACAT ARCHITECTURE, P.C. | $20,017 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $382,648 allocation.
See details
|
National Park Service | 7/20/2009 |
GROUP14 ENGINEERING, INC. | $19,570 |
Total building commissioning for Denali ESFMB
This spending item is part of a $48,857 allocation.
See details
|
National Park Service | 5/10/2010 |
AMBIENT ENERGY, INC. | $16,563 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
COLORADO PAINT COMPANY II | $12,203 | Waterborne Traffic Paint | Indian Affairs (Assistant Secretary) | 7/01/2010 |
J R HARRIS AND COMPANY | $11,296 |
Project for developing bid documents for future construction of wastewater treatment plant at Madison Junction, Yellowstone National Park. This is a shovel-ready project which has been bid and be awarded fall 2009.
This spending item is part of a $69,328 allocation.
See details
|
National Park Service | 5/19/2009 |
LANDMARK ENVIROMENTAL, INC | $8,967 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $382,648 allocation.
See details
|
National Park Service | 7/20/2009 |
COLORADO PAINT COMPANY II | $8,539 | Waterborne Traffic Paint | Indian Affairs (Assistant Secretary) | 7/01/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $7,500 | Environmental Quality and Protection Resource Management Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover t the opening.... Show more | Bureau of Land Management | 9/15/2009 |
BARKER, RINKER, SEACAT ARCHITECTURE, P.C. | $6,952 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $80,280 allocation.
See details
|
National Park Service | 5/06/2010 |
DHM DESIGN CORPORATION | $4,183 |
This project will serve to rehabilitate the Many Glacier Hotel in Glacier National Park, MT. The hotel is in an advanced state of deterioration and requires immediate rehabilitation to address critical health and life-safety needs and comply with buildin
This spending item is part of a $251,003 allocation.
See details
|
National Park Service | 6/30/2010 |
YEH AND ASSOCIATES, INC | $4,149 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
LANDMARK ENVIROMENTAL, INC | $1,865 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $80,280 allocation.
See details
|
National Park Service | 5/06/2010 |
Avenue L Architect LLC | $1,107 |
Project for developing bid documents for future construction of wastewater treatment plant at Madison Junction, Yellowstone National Park. This is a shovel-ready project which has been bid and be awarded fall 2009.
This spending item is part of a $69,328 allocation.
See details
|
National Park Service | 5/19/2009 |
DHM DESIGN CORPORATION | $0 |
Architectural and Engineering Services - Stablization of Ellis Island Baggage and Dormitory Building - Construction Management Services
This spending item is part of a $135,701 allocation.
See details
|
National Park Service | 5/11/2010 |