Ada County, Idaho, funds by Interior, Department of
Listing $5,562,406.74 in stimulus funds from Interior, Department of for Ada
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CH2M HILL INC | $627,580 | Engineering Design Services- Planning and design of a water supply intake/fish screen structure, water supply intake conduit, water supply pumping plant, water supply line to the existing Hatchery Sand Settling Basin of the Leavenworth National Fish Hatch | Bureau of Reclamation | 7/15/2009 |
DYKMAN ELECTRICAL, INC. | $479,971 | Medium voltage electric motor and medium voltage variable frequency drive. | Bureau of Reclamation | 8/17/2010 |
AGRICULTURE, IDAHO DEPARTMENT OF | $347,337 |
Fish, Wildlife and Plant Conservation Resource Management The strategic emphasis of programs in all counties will be the removal of noxious weeds and invasive species determined to be negatively impacting the ecological stability of plant communities associated with BLM lands. The Department of Agriricultures wil... Show more
This spending item is part of a $1,322,500 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
METAL BENDERS, INC. | $335,337 | Building 105 Remediation | Bureau of Land Management | 3/17/2010 |
PERKINS CONSTRUCTION, INC. | $259,146 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
RECORD STEEL AND CONSTRUCTION, INC. | $256,262 |
Seismic Upgrades
This spending item is part of a $300,082 allocation.
See details
|
Bureau of Land Management | 11/16/2009 |
DYKMAN ELECTRICAL, INC. | $242,500 | One medium voltage electric motor and one medium voltage variable frequency drive. | Bureau of Reclamation | 9/14/2010 |
HOBSON FABRICATING CORP. | $232,688 | BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100 | Bureau of Land Management | 3/26/2010 |
ICON CONSULTING GROUP DEMOLITION SERVICES | $199,991 | Complete abatement, demolition and removal of building 105. Approximately 29,000 GSF. | Bureau of Land Management | 3/26/2010 |
SOUND SCIENCE LLC | $165,759 |
Rapid Ecoregional Assessment of the Central Basin and Range Ecoregion
This spending item is part of a $756,225 allocation.
See details
|
Bureau of Land Management | 6/25/2010 |
HOBSON FABRICATING CORP. | $158,556 |
BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100.
This spending item is part of a $232,688 allocation.
See details
|
Bureau of Land Management | 3/26/2010 |
SOUND SCIENCE LLC | $156,909 |
Rapid Ecoregional Assessment of the Mojave Basin and Range Ecoregion
This spending item is part of a $712,230 allocation.
See details
|
Bureau of Land Management | 6/25/2010 |
Boise State University | $134,195 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Real-Time Volcano Monitoring | Geological Survey | 11/30/2009 |
BOISE STATE UNIVERSITY | $134,195 | Volcano Hazards Program Research and Monitoring. The detection and evaluation of time-dependent changes at volcanoes forms the foundation upon which successful volcano monitoring is built. Time-dependent changes at volcanoes occur over all time scales and may be obvious or subtle. Some of the most c chal... Show more | Geological Survey | 12/01/2009 |
IDAHO SURVEY GROUP P C | $129,878 | GCDB-GPS survey for ID957 Area 6 for Township & Section Geographic Coordinate Data Base (GCDB) upgrade in State of Idaho for areas that have been identified by others to have alternative energy resource potential. | Bureau of Land Management | 4/01/2010 |
INTEGRA INFORMATION TECHNOLOGIES INC | $94,044 |
This proposed project is in support of renewable energy exploration and development of wind, solar, geothermal and electrical transmission line resources on Bureau of Land Management administered public land. It is an effort to upgrade and produce these r
This spending item is part of a $351,051 allocation.
See details
|
Bureau of Land Management | 3/29/2010 |
PRO TECH ROOFING INC. | $92,457 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
HDR ENGINEERING, INC. | $91,149 | This task order is for construction observation assistance during construction of improvements to facilities of the Methow Valley Irrigation District - East (MVID-E) in the Methow River Subbasin near Twisp, WA | Bureau of Reclamation | 8/03/2009 |
SOUND SCIENCE LLC | $87,514 |
Rapid Ecoregional Assessment for the Seward Peninsula, Nulato Hills, Kotzebue Lowlands, Alaska Ecoregion
This spending item is part of a $1,249,867 allocation.
See details
|
Bureau of Land Management | 9/16/2010 |
Renewable Energy Resources Inc | $86,900 |
The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a
This spending item is part of a $2,333,660 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/24/2009 |
ENGINEERING SCIENCE & CONSTRUCTION L.L.C. | $84,390 | This award is for the design of refurbishing of Page Springs Dam at Malheur NWR. This includes design of new automatic control gates, concrete cracking repair and addition of a cutoff wall at the toe of the dam. New rip rap will be added to prevent unde | U.S. Fish and Wildlife Service | 8/19/2009 |
PERSONNEL PLUS, INC | $84,182 | GIS Technician to complete the following: 1. Correct (where possible) the corporate Idaho geospatial surface management agency data against the Master Title Plats and LR2000 for 600 of the townships containing BLM land and there is a pending fast track tr | Bureau of Land Management | 12/14/2009 |
JOHNSON CONTROLS, INC. | $74,132 |
BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100.
This spending item is part of a $232,688 allocation.
See details
|
Bureau of Land Management | 3/26/2010 |
CTA INC. | $70,934 | ENGINEERING DRAFTING SERVICES-A & e SERVICES FOR IDAHO WATER SCIENCE CENTER, BLDG #3 | Geological Survey | 12/01/2009 |
CH2M HILL, INC. | $61,735 |
Contractor will prepare and perform an Alternative Evaluation Report engineering study for a portion of the Preston Reach on the Entiat River in Washington. The purpose of the study is to develop and evaluate potential habitat improvement projects for ana
This spending item is part of a $285,714 allocation.
See details
|
Bureau of Reclamation | 8/27/2009 |
ALERT INC | $53,975 | Replace windows and doors at the Willow Beach National Fish Hatchery | U.S. Fish and Wildlife Service | 2/04/2010 |
MCMILLEN, LLC | $52,219 |
The work effort included design and preparation of construction documents for a new, appropriately sized chiller dedicated to egg incubation at the Kooskia Hatchery. Additional work elements included the rehabilitation of other system components includin
This spending item is part of a $71,219 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/08/2009 |
TRI-STATE ELECTRIC, INC. | $48,900 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
Hawkeye Builders Inc | $47,400 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
PERSONNEL PLUS, INC | $44,889 | Identify and document electronic images not meeting quality standards of the Statement of Work that has been executed by the unassociated CDI scanning contractor. Preparation of aperture cards for return shipment back to the un-scanned CDI scanning contr | Bureau of Land Management | 1/07/2010 |
CONSTRUCTION SERVICE CORPORATION | $43,820 |
Seismic Upgrades
This spending item is part of a $300,082 allocation.
See details
|
Bureau of Land Management | 11/16/2009 |
ENGINEERING SCIENCE & CONSTRUCTION L.L.C. | $42,550 | This award is for the design of refurbishing of Page Springs Dam at Malheur NWR. The refurbishment includes design of new automatic control panels. | U.S. Fish and Wildlife Service | 8/19/2009 |
EXECUTIVE OFFICE OF THE STATE OF IDAHO | $38,000 | Fish, Wildlife and Plant Conservation Resource Management Implement Boise District travel management plan utilizing dissadvantaged youth. | Bureau of Land Management | 9/17/2009 |
ACTION GARAGE DOOR INC | $36,718 |
Remove and replace overhead doors at the BLM Shoshone and Burley FO.
This spending item is part of a $41,373 allocation.
See details
|
Bureau of Land Management | 9/19/2009 |
ANDERSON & WOOD CONSTRUCTION CO., INC. | $36,469 | Bldg 100 Electrical Upgrade | Bureau of Land Management | 9/22/2009 |
D&A GLASS COMPANY, INC. | $35,529 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
PERINI MANAGEMENT SERVICES INC | $35,483 | Construction Services for the upgrade,repair,and replacement at Building 5 | Geological Survey | 3/24/2010 |
HASCO LLC | $35,311 | Remove and replace doors, frames, hardware, and windows at the Burley, Idaho FO. | Bureau of Land Management | 9/19/2009 |
TEAM HENRY ENTERPRISES, LLC | $32,086 |
Demolition of streamgages and cableways.
This spending item is part of a $45,451 allocation.
See details
|
Geological Survey | 3/22/2010 |
CTA INC. | $27,716 |
This project is to provide a solicitation ready package for constructing a Radio Shop building at the Boise District Office Complex located in Boise, ID. The project will include architectural, civil, structural, mechanical & electrical plans as well as
This spending item is part of a $61,402 allocation.
See details
|
Bureau of Land Management | 6/29/2009 |
Brownco Mechanical, Inc. | $27,262 |
Bureau of Land Management Radio Facility & Tower Construction
This spending item is part of a $510,694 allocation.
See details
|
Bureau of Land Management | 4/21/2010 |
J-U-B ENGINEERS, INC. | $27,151 |
This project is to provide a solicitation ready package for constructing a Radio Shop building at the Boise District Office Complex located in Boise, ID. The project will include architectural, civil, structural, mechanical & electrical plans as well as
This spending item is part of a $61,402 allocation.
See details
|
Bureau of Land Management | 6/29/2009 |
YTUARTE CONCRETE, INC. | $23,205 | Boise District Lighting Sensors | Bureau of Land Management | 6/03/2010 |
Z STEEL, L.L.C. | $22,240 | Erection of Pre-Engineered government furnished 30'x50' building Rome, Oregon. | Bureau of Land Management | 10/13/2010 |
CTA INC. | $18,224 |
This project is to provide a solicitation ready package for HVAC system upgrades and replacement for an existing office building. The work to be performed includes on site verification of the existing systems, final design, drawings, specifications, and
This spending item is part of a $19,947 allocation.
See details
|
Bureau of Land Management | 9/21/2009 |
CXT INCORPORATED | $17,689 | RECOVERY-SILVER CITY COMFORT STATION RJ TAS::14 1112::TAS | Bureau of Land Management | 4/15/2010 |
S P F WATER ENGINEERING | $16,000 |
The work effort included design and preparation of construction documents for a new, appropriately sized chiller dedicated to egg incubation at the Kooskia Hatchery. Additional work elements included the rehabilitation of other system components includin
This spending item is part of a $71,219 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/08/2009 |
Power Electric Inc | $14,070 |
The purpose of this project is ton construct Tier I energy upgrades to various buildings of the Deer Flat NWR (National Wildlife Refuge). The scope of work includes installing insulation in six buildings, provide and install energy efficient lighting syst
This spending item is part of a $81,859 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/24/2010 |
Systems Painters, Inc. | $13,365 |
Demolition of streamgages and cableways.
This spending item is part of a $45,451 allocation.
See details
|
Geological Survey | 3/22/2010 |
MOUNTAIN VIEW CONTRACTING, INC. | $13,110 | TRAVEL PLAN GRAVELING | Bureau of Land Management | 9/01/2009 |
OVERHEAD DOOR, INC | $11,096 |
Provide Little Pend Orielle National Wildlife Refuge a series of Tier 1 energy upgrades to several buildings at the Refuge.
This spending item is part of a $53,326 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/10/2010 |
DC Engineering | $9,900 |
There were four major parts to this contracat: 1.) Provide the best alternate technology for reducing energy usage / \improving efficiencies for ambient air-heating of the domestic residences and main office building. 2.)Provide the best alternate technol
This spending item is part of a $431,200 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/30/2010 |
M R PRIEST, INC | $7,475 | Wilderness Signs and Decals | Bureau of Land Management | 9/11/2009 |
TERRACON CONSULTANTS, INC. | $7,240 |
This project was to provide a geotechnical investigation and report at Slate Creek Recreation Site. Five test holes were drilled and a geotechnical report was provided based on findings.
This spending item is part of a $8,192 allocation.
See details
|
Bureau of Land Management | 5/25/2010 |
TERRACON CONSULTANTS, INC. | $6,535 |
This project is to provide a solicitation ready package for constructing a Radio Shop building at the Boise District Office Complex located in Boise, ID. The project will include architectural, civil, structural, mechanical & electrical plans as well as
This spending item is part of a $61,402 allocation.
See details
|
Bureau of Land Management | 6/29/2009 |
United Subcontractors, Inc. | $5,054 |
The purpose of this project is ton construct Tier I energy upgrades to various buildings of the Deer Flat NWR (National Wildlife Refuge). The scope of work includes installing insulation in six buildings, provide and install energy efficient lighting syst
This spending item is part of a $81,859 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/24/2010 |
HODGSON & SONS INC | $4,850 |
Manufacture, deliver and install 1 prefabricated, precast concrete restroom building at the North Fork Owyhee River Recreation Site.
This spending item is part of a $27,031 allocation.
See details
|
Bureau of Land Management | 9/11/2009 |
HASCO LLC | $4,655 |
Remove and replace overhead doors at the BLM Shoshone and Burley FO.
This spending item is part of a $41,373 allocation.
See details
|
Bureau of Land Management | 9/19/2009 |
J-U-B ENGINEERS, INC. | $3,352 |
This project was to update a solicitation ready package for rehabing and existing building for seismic deficiencies. The buiding is located at the National Interagency Fire Center in Boise, Idaho.
This spending item is part of a $4,728 allocation.
See details
|
Bureau of Land Management | 7/06/2009 |
DC Engineering | $3,000 |
The work effort included design and preparation of construction documents for a new, appropriately sized chiller dedicated to egg incubation at the Kooskia Hatchery. Additional work elements included the rehabilitation of other system components includin
This spending item is part of a $71,219 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/08/2009 |
CTA INC. | $1,728 |
This project was to provide an electrical site design for the Ramsey Mountain Communications site, near Salmon Idaho. Work performed included sizing conductor, conduit and transformers for a branch line from the power providers transformer to the communi
This spending item is part of a $2,411 allocation.
See details
|
Bureau of Land Management | 8/17/2009 |
J-U-B ENGINEERS, INC. | $1,723 |
This project is to provide a solicitation ready package for HVAC system upgrades and replacement for an existing office building. The work to be performed includes on site verification of the existing systems, final design, drawings, specifications, and
This spending item is part of a $19,947 allocation.
See details
|
Bureau of Land Management | 9/21/2009 |
CTA INC. | $1,376 |
This project was to update a solicitation ready package for rehabing and existing building for seismic deficiencies. The buiding is located at the National Interagency Fire Center in Boise, Idaho.
This spending item is part of a $4,728 allocation.
See details
|
Bureau of Land Management | 7/06/2009 |
Bhm Assoc Inc | $1,000 |
The purpose of this project is ton construct Tier I energy upgrades to various buildings of the Deer Flat NWR (National Wildlife Refuge). The scope of work includes installing insulation in six buildings, provide and install energy efficient lighting syst
This spending item is part of a $81,859 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/24/2010 |
J-U-B ENGINEERS, INC. | $951 |
This project was to provide a geotechnical investigation and report at Slate Creek Recreation Site. Five test holes were drilled and a geotechnical report was provided based on findings.
This spending item is part of a $8,192 allocation.
See details
|
Bureau of Land Management | 5/25/2010 |
J-U-B ENGINEERS, INC. | $683 |
This project was to provide an electrical site design for the Ramsey Mountain Communications site, near Salmon Idaho. Work performed included sizing conductor, conduit and transformers for a branch line from the power providers transformer to the communi
This spending item is part of a $2,411 allocation.
See details
|
Bureau of Land Management | 8/17/2009 |
J-U-B ENGINEERS, INC. | $667 | This project was to provide technical assistance to address construction issues encounted during construction of Building 410-A (Information Systems) at the National Interagency Fire Center. | Bureau of Land Management | 1/22/2010 |