Yellowstone County, Mont., funds by Interior, Department of
Listing $5,158,804.60 in stimulus funds from Interior, Department of for Yellowstone
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CTA INC. | $2,501,174 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
CTA INC. | $369,500 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
MORRISON-MAIERLE, INC. | $274,800 |
Under the American Recovery and Reinvestment Act (ARRA), the Bureau of Land Management (BLM) received funding to be used in Fiscal Years 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage infastructure investment
This spending item is part of a $653,869 allocation.
See details
|
Bureau of Land Management | 3/18/2010 |
QUARRY SERVICES LLC | $267,258 |
REMOVE ROCK OUTCROPPINGS
This spending item is part of a $843,056 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/01/2010 |
MOUNTAIN WEST HOLDING COMPANY | $234,879 | Complete | Indian Affairs (Assistant Secretary) | 5/23/2010 |
CTA INC. | $215,329 | Architectural Services - A/E Svcs. (Incl Landscaping Interior) | Geological Survey | 9/22/2009 |
CTA INC. | $207,899 | A/E Svcs. - A&E services facility options and site work | Geological Survey | 9/22/2009 |
MARCHANT CONSTRUCTION, LLC | $127,029 | Marchant Construction was awarded the Pompeys Pillar Road Reclamation & Paving Maintenance job on December 10 2009.Contract #L10PC00003 | Bureau of Land Management | 12/10/2009 |
JTL GROUP, INC | $126,630 | Asphalt supply | Indian Affairs (Assistant Secretary) | 6/17/2010 |
HKM ENGINEERING INC. | $121,332 | Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page 1 through 4) of the form may be completed on a computer, with the deliverable portion of the form | Bureau of Land Management | 7/23/2009 |
HKM ENGINEERING INC. | $121,332 | Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page 1 through 4) of the form may be completed on a computer, with the deliverable portion of the form | Bureau of Land Management | 6/29/2009 |
M.L.D.C., INC. | $74,188 | Description/overall purpose: Furnish labor, equipment, supplies, and materials, to install security fencing at BLM communications sites in Montana. There are 6 Sites in total with Approx 1012 linear feet of fence. Expected outcome: 6 fences will be b | Bureau of Land Management | 1/19/2010 |
CTA INC. | $52,400 |
WIDEN AND RESURFACE ROAD, REPLACE OLD CULVERTS AND INSTALL NEW CULVERTS AT FORT MEADE BYWAY NEAR STURGIS, SOUTH DAKOTA.
This spending item is part of a $327,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/01/2010 |
UNITED RENTALS, INC. | $50,400 | 6 ? 12 yd dump trucks 2 ? Sweepers 2- Skidsteers | Indian Affairs (Assistant Secretary) | 3/31/2010 |
AABERG CULTURAL RESOURCE CONSULTING SERVICE | $49,137 | archaeological and historical survey of tracts in the Upper Missouri Breaks National Monument | Bureau of Land Management | 1/06/2010 |
AABERG CULTURAL RESOURCE CONSULTING SERVICE | $49,137 | Cultural resource inventory of the Upper Missouri River Breaks National Monument | Bureau of Land Management | 1/06/2010 |
PRECISION PLUMBING AND HEATING, INC. | $46,012 | Furnish and install a LP gas fired condensing boiler and two ceiling mounted architectural ceiling fans into the existing building ground source heating loop. | Bureau of Land Management | 1/20/2010 |
SPECTRUM ENGINEERING, INC. | $45,000 | Inventory and assess hazards of underground phosphate mines in the Maiden Rock area of western Montana. The outcome will provide the Bureau of Land Management with the engineering evaluation necessary to made closure decisions. | Bureau of Land Management | 12/24/2009 |
COLORADO PAINT COMPANY II | $45,000 | Recovery-Waterborne Traffic Paint | Indian Affairs (Assistant Secretary) | 2/24/2010 |
CTA INC. | $41,924 | A & E SERVICES FOR DESIGN OF MECHANICAL FIRE SPRINKLER | Geological Survey | 12/08/2009 |
ROSCOE STEEL AND CULVERT CO. | $38,800 | Water Control Structures, Cokeville National Wildlife Refuge | U.S. Fish and Wildlife Service | 5/19/2010 |
HKM ENGINEERING INC. | $22,076 | Gysum Springs Crossing Repair Recovery Act Funded Project-Gary Elwell 1)Estimate quantities of materials and type of structure to be placed in low water area: a)Estimate quantities for cuts and fill to place appropriate structure. b)Design struc | Bureau of Land Management | 7/23/2009 |
CTA INC. | $19,113 | Engineering Drafting Services | Geological Survey | 9/30/2009 |
ROSCOE STEEL AND CULVERT CO. | $16,678 |
This project includes providing all materials, equipment, some minor design, and labor required to completely reconstruct four (4) permanent water pumping stations located on the Green River in Browns Park National Wildlife Refuge, Colorado for use in wet
This spending item is part of a $920,932 allocation.
See details
|
U.S. Fish and Wildlife Service | 1/29/2010 |
MONTANA CONSERVATION CORP | $12,000 | Fish, Wildlife and Plant Conservation Resource Management Montana Conservation Corps (MCC) crews will work with BLM personnel to restore riparian areas treated for russian olive control. Planting in these treated areas with native shrubs will help to control, reduce the spread of, and prevent the fufurther invasi... Show more | Bureau of Land Management | 3/16/2010 |
ARROW STRIPING & MANUFACTURING, INC. | $7,758 |
South Rim Drive-C1574105006. Rehabilatation of 1.4 miles of radway in Yellowstone National Park WY. The work includes 26,000sy asphalt milling, 26,000sy asphalt paving, 2.8 miles shoulder grading, traffic control, and striping.
This spending item is part of a $992,969 allocation.
See details
|
National Park Service | 4/19/2010 |
JOHNSON LANE MATERIALS LLC | $7,438 | DELIVERY OF GRAVEL | Bureau of Land Management | 7/14/2009 |
HKM ENGINEERING INC. | $6,427 | Pompey Pillar Energy Improvement Project. A)Task A. Prepare a conceptual design for the istallation of a boiler to be included in the ground source loop to provide the deficit in heating capacity. Design to include class C estimate for installation co | Bureau of Land Management | 6/29/2009 |
ARROW STRIPING & MANUFACTURING, INC. | $4,655 |
Lewistown Paving & Retardent Containment Construciton. Demolition, salvage, excavation, grading, culvert installation, parking lot construction, taxiway construction and retardent containment area construction. The work is located at the Lewistown Munic
This spending item is part of a $671,185 allocation.
See details
|
Bureau of Land Management | 4/07/2010 |
LAUREL SCHOOL DISTRICT 7-70 | $3,500 |
Forests and Woodlands Resource Management Montana Fuels for Schools has provided grants to assist with installation of woody biomass boiler systems in western Montana since 2003. This ARRA grant will provide a new influx of funding for the program at a critical time. By providing funding for fuel
This spending item is part of a $250,000 allocation.
See details
|
Bureau of Land Management | 1/22/2010 |