Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Mecklenburg County, N.C., funds by Interior, Department of

Listing $373,903.14 in stimulus funds from Interior, Department of for Mecklenburg

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
TEAM HENRY ENTERPRISES, LLC $86,627 Demolition of streamgages and cableways.
This spending item is part of a $123,753 allocation. See details
Geological Survey 3/29/2010
APPLIED ENERGY MANAGEMENT, INC. $80,884 Field Station Energy Audits for 28 sites (147 buildings) approximately 349,000 sq ft. preliminary analysis to be performed U.S. Fish and Wildlife Service 1/21/2010
SC SOLAR, INC. $73,523 The Bureau of Reclamation-LC is purchasing seven solar pond aeration systems for various aquatic applications. These are complete systems that include solar modules, battery backup, battery box, pole mount, etc. Bureau of Reclamation 3/29/2010
Marmon/Keystone Corporation $49,031 AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA
This spending item is part of a $6,963,398 allocation. See details
Bureau of Reclamation 1/16/2010
THUNDER DISASTER SERVICES, INC. $37,126 Demolition of streamgages and cableways.
This spending item is part of a $123,753 allocation. See details
Geological Survey 3/29/2010
AKZO NOBEL PAINTS LLC $25,612 AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA
This spending item is part of a $6,963,398 allocation. See details
Bureau of Reclamation 1/16/2010
KLEINFELDER SOUTHEAST, INC. $21,100 1. Planning, Surveying, and Mapping for the design of Rivercrest Road Phase II. 2. Superstructure and Pier Design. 3. Additional Plan Preparation for Separate Plan Set. 4. Additional Geotechnical Investigations required for the pier.
This spending item is part of a $125,594 allocation. See details
Indian Affairs (Assistant Secretary) 4/09/2010