Mecklenburg County, N.C., funds by Interior, Department of
Listing $373,903.14 in stimulus funds from Interior, Department of for Mecklenburg
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
TEAM HENRY ENTERPRISES, LLC | $86,627 |
Demolition of streamgages and cableways.
This spending item is part of a $123,753 allocation.
See details
|
Geological Survey | 3/29/2010 |
APPLIED ENERGY MANAGEMENT, INC. | $80,884 | Field Station Energy Audits for 28 sites (147 buildings) approximately 349,000 sq ft. preliminary analysis to be performed | U.S. Fish and Wildlife Service | 1/21/2010 |
SC SOLAR, INC. | $73,523 | The Bureau of Reclamation-LC is purchasing seven solar pond aeration systems for various aquatic applications. These are complete systems that include solar modules, battery backup, battery box, pole mount, etc. | Bureau of Reclamation | 3/29/2010 |
Marmon/Keystone Corporation | $49,031 |
AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA
This spending item is part of a $6,963,398 allocation.
See details
|
Bureau of Reclamation | 1/16/2010 |
THUNDER DISASTER SERVICES, INC. | $37,126 |
Demolition of streamgages and cableways.
This spending item is part of a $123,753 allocation.
See details
|
Geological Survey | 3/29/2010 |
AKZO NOBEL PAINTS LLC | $25,612 |
AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA
This spending item is part of a $6,963,398 allocation.
See details
|
Bureau of Reclamation | 1/16/2010 |
KLEINFELDER SOUTHEAST, INC. | $21,100 |
1. Planning, Surveying, and Mapping for the design of Rivercrest Road Phase II. 2. Superstructure and Pier Design. 3. Additional Plan Preparation for Separate Plan Set. 4. Additional Geotechnical Investigations required for the pier.
This spending item is part of a $125,594 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/09/2010 |