Lane County, Ore., funds by Interior, Department of
Listing $3,099,829.17 in stimulus funds from Interior, Department of for Lane
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JENSEN DRILLING COMPANY | $1,639,200 |
8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP.
This spending item is part of a $17,480,694 allocation.
See details
|
Bureau of Reclamation | 3/27/2010 |
ADVANCED ENERGY SYSTEMS | $420,030 |
This contract will design, engineer, procure, and construct a Solar Photovoltaic Parking Canopy of approximately 50kW DC. The parking canopy will cover an area of existing spaces and provide a degree of protection from the eliments. The electricity prod
This spending item is part of a $447,490 allocation.
See details
|
Bureau of Land Management | 8/17/2010 |
CELIK ENGINEERING CORP | $312,000 | Removal and replacement of the existing water main with a new one at Shotgun Creek Recreation Site. | Bureau of Land Management | 5/20/2010 |
F.M. SHEET METAL, INC. | $249,756 | HVAC upgrades in 3 park buildings in Crater Lake National Park, OR | National Park Service | 5/12/2010 |
UNIVERSITY OF OREGON | $103,435 | Earthquake Hazards Reduction Program The University of Oregon (UO) proposes to update Pacific Northwest Siesmic Network (PNSN) stations as well as 2 EarthWorm systems and their related network infrastructure. This proposal is for a portion of the PNSN proposed work included in the separate p | Geological Survey | 9/15/2009 |
PURGATORY FENCE COMPANY LLC | $98,409 | Whites Creek fence replacement | Bureau of Land Management | 6/30/2010 |
CKI CONSTRUCTION | $71,185 | Huckleberry Communications Building | Bureau of Land Management | 7/28/2009 |
LESTER L BROCK CONSTRUCTION CO. | $56,680 | Eugene Roof replacement | Bureau of Land Management | 8/04/2010 |
Steiner Locus | $40,000 |
Keweenaw Interactive Kiosk: all labor, equipment, materials and services necessary to compile, design and produce an interactive kiosk program for Keweenaw National Historical Site
This spending item is part of a $104,060 allocation.
See details
|
National Park Service | 5/11/2010 |
CASEY JONES WELL DRILLING CO | $34,706 | supplied labor, equipment, supplies and materials to construct and develop a potable water well to approximately 400 feet and to produce 3 gallons per minute. Drilling went to 385 feet and only supplied 1.3 gallons per minute with high salinity. A second | Bureau of Land Management | 2/17/2010 |
CASEY JONES WELL DRILLING CO | $26,580 | Water well pump system install and filtration | Bureau of Land Management | 5/24/2010 |
BUSINESS WORLD CONTRACTORS | $26,450 | Eugene Maintanence Shop Fence Repairs | Bureau of Land Management | 4/30/2010 |
S BROOKS & ASSOCIATES INC | $11,958 | Engineering Services | Bureau of Land Management | 2/04/2010 |
HALL, W E CO (INC) | $9,440 | Corrugated galvanized steel pipe products and accessories, fabricated flashboard riser 4' high, and Waterman C-10 canal gate w/4' high painted frame. | U.S. Fish and Wildlife Service | 12/30/2009 |