Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Dallas County, Texas, funds by Interior, Department of

Listing $929,424.96 in stimulus funds from Interior, Department of for Dallas

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
Commercial Metals Company $332,239 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
SOUTHERN METHODIST UNIVERSITY INC $249,949 Volcano Hazards Program Research and Monitoring. Infrastructure and Support for Monitoring Volcanoes of the Commonwealth of the Northern Mariana Islands Volcanic eruptions within the Commonwealth of the Northern Mariana Islands (CNMI) threaten commercial and military aviation and local economies, an... Show more Geological Survey 12/31/2009
Commercial Metals Company $81,643 8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP.
This spending item is part of a $17,480,694 allocation. See details
Bureau of Reclamation 3/27/2010
VOYAGER EXPANDED LEARNING, INC $71,920 Education Indian Affairs (Assistant Secretary) 8/17/2010
VOYAGER EXPANDED LEARNING, INC $69,334 Education Indian Affairs (Assistant Secretary) 8/04/2010
GEOTECH INSTRUMENTS LLC $46,410 Geotech Model PA-23 Accelerometer, 15 units Geological Survey 3/29/2010
Hart, Gaugler & Associates Inc $26,200 On 11/10/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the Hagerman National
This spending item is part of a $361,199 allocation. See details
U.S. Fish and Wildlife Service 11/10/2009
FACILITY ENGINEERING ASSOCIATES, P.C. $20,600 This work consists of performing energy audit/evaluations. The purpose is to assist the service in ensuring the effective energy management at the facilities. The work shall include: pre-site analysis, onsite surveys, assessments, evaluations, post site U.S. Fish and Wildlife Service 7/02/2010
FACILITY ENGINEERING ASSOCIATES, P.C. $20,600 This work consists of performing energy audit/evaluations. The purpose is to assist the service in ensuring the effective energy management at the facilities. The work shall include: pre-site analysis, onsite surveys, assessments, evaluations, post site U.S. Fish and Wildlife Service 7/02/2010
ELMBROOK CORPORATE SERVICES INC $5,536 7 EB9SHKXVQ REFRIGERATORS U.S. Fish and Wildlife Service 11/20/2009
PROFESSIONAL SERVICE INDUSTRIES, INC. $4,994 Geotechnical Investigaion and Soils Report: Hagerman NWR-Visitor Center/Administration Building Sites, Grayson County, Texas U.S. Fish and Wildlife Service 10/13/2009