Clark County, Wash., funds by Interior, Department of
Listing $2,223,167.71 in stimulus funds from Interior, Department of for Clark
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NH ENGINEERING, PLLC | $355,940 | Engineering Project Manager - assist engineering staff in managing construction projects under the American Recovery and Reinvestment Act of 2009. | U.S. Fish and Wildlife Service | 5/29/2009 |
VALENTINE SURFACING CO. | $350,050 |
Provide Cold Inplace Recycling of 10 miles of Park roads. Cold Inplace Recycling consists of roto-milling the existing asphalt pavements, processing the milled material through a mobile processing plant, adding oil and windrowing the recycled material ba
This spending item is part of a $1,197,363 allocation.
See details
|
National Park Service | 6/04/2009 |
BRYAN GEOPHYSICAL LLC | $258,833 | research supporting and development of algorithms for computation of magnitudes of and determination of the physics of faulting in large earthquakes | Geological Survey | 1/29/2010 |
PUMP DYNAMICS, LLC | $255,820 |
Scope of work at the Spring Creek National Fish Hatchery is replacement of 14 pumps and motors along with upgrade of new service switchgear to include ATS (automatic transfer switch) and motor control center. All motors for pumps will be high efficient w
This spending item is part of a $1,272,058 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/24/2009 |
COLF LANDSCAPE CONSTRUCTION | $227,256 | The project is for a contractor to resurface the Spruce Mill Trail within Fort Vancouver National Historic Site in accordance with the Project Specificaitons incorporated herein. Contractor shall provide all supervision, labor, materials, tools, equipmen | National Park Service | 5/14/2010 |
COMBINED EFFORT, INC. | $174,214 | design build of new storage barn at Steigerwald National Wildlife Refuge. Project also includes new gravel road and demo of old storage building. Award amount increased due to change order. | U.S. Fish and Wildlife Service | 8/31/2009 |
SCHLECHT CONSTRUCTION, INC | $142,719 | Tier 1 Energy Upgrades at Ridgefield Wildlife Refuge Complex in Ridgefield, WA. | U.S. Fish and Wildlife Service | 6/07/2010 |
SMITH-ROOT, INC. | $90,916 |
Design, Fabricate and deliver SR-18H Electrofishing Boat with 7.5GPP Plus Evinrude Outboard Engine Plus Matching Tandem Axle Trailer.
This spending item is part of a $98,217 allocation.
See details
|
Bureau of Reclamation | 3/31/2010 |
SMITH-ROOT, INC. | $80,824 |
Design, Fabricate ad Install an new Electro-Anthesia Unit at Lt White Salmon Fish Hatchery. Deliverables include an EA-1000A systems, A refurbished Basket system and interial buidling improvements - Electrical and mechanical to support the new system.
This spending item is part of a $99,999 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/23/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $56,381 | Steigerwald Tier 1 Energy Updates | U.S. Fish and Wildlife Service | 10/07/2009 |
MCDONALD EXCAVATING, INC. A WASHINGTON CORPORATION | $55,585 |
Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/24/2009 |
NORTHWEST UNDERWATER CONSTRUCTION, LLC | $48,886 |
Roza Diversion Dam Roller Gate Replacement
This spending item is part of a $1,054,477 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
MCNEALY EXCAVATING INC | $46,100 | Construct Entrance Road Safety Improvements @ Conboy Lake Nat. Wildlife Refuge. | U.S. Fish and Wildlife Service | 10/06/2009 |
COLUMBIA CASCADE COMPANY | $44,267 | Heavy duty benches for Fort Dupont Park, Washington, DC | National Park Service | 9/27/2010 |
PUMP DYNAMICS, LLC | $28,938 |
Scope of work at the Spring Creek National Fish Hatchery is replacement of 14 pumps and motors along with upgrade of new service switchgear to include ATS (automatic transfer switch) and motor control center. All motors for pumps will be high efficient w
This spending item is part of a $1,272,058 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/24/2009 |
MHW SAVAGE ENTERPRISES LLC | $2,800 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
Builder Services Group, Inc. | $2,440 |
The purpose of this project is to install Tier I energy upgrade to various buildings at the Tualatin River NWR> The scope of the work includes: installing new entrance doors, windows and insulation to two residence quarters and installing high efficiency
This spending item is part of a $36,550 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/30/2010 |
Ford Vancouver Inc | $1,200 |
Design, Fabricate and deliver SR-18H Electrofishing Boat with 7.5GPP Plus Evinrude Outboard Engine Plus Matching Tandem Axle Trailer.
This spending item is part of a $98,217 allocation.
See details
|
Bureau of Reclamation | 3/31/2010 |