Pierce County, Wash., funds by Interior, Department of
Listing $7,946,432.59 in stimulus funds from Interior, Department of for Pierce
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CHIEF LESCHI SCHOOLS | $1,400,000 | School Improvement Grants, Recovery Act ARRA School Improvement Grant funds to develop and implement a phased restructuring of Chief Leschi Schools. | Indian Affairs (Assistant Secretary) | 5/15/2012 |
Hhj Construction Inc | $1,375,929 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
CHIEF LESCHI SCHOOLS | $1,014,600 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching & learning for students most at risk of failing to meet state academic standards. This award is further broken down into four priorities: 1. Priority 1 - To adopt rigorous college and career ready standards and high quality y assessments. ... Show more | Indian Affairs (Assistant Secretary) | 1/01/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $847,000 | locate or decommission monitor wells in Washington State no longer in use | Geological Survey | 3/19/2010 |
COUNTY OF PIERCE | $355,575 | National Geospatial Program: Building The National Map 2010-2011 Lidar Update for Pierce County, Washington | Geological Survey | 2/16/2010 |
Pierce County | $355,575 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 2010-2011 Lidar Update for Pierce County Washington | Geological Survey | 2/16/2010 |
JERRY NYBO CONSTRUCTION, INC. | $236,000 | PROVIDE ALL MATERIALS, TRANSPORTATION AND LABOR TO SUPPLY APPROXIMATELY 2,000 CU. YDS. OF PUMPABLE/FLOWABLE MIX CONCRETE (5 SK. 7/8 50/50 BLEND)AND ONE (1) CONCRETE PUMP TRUCK WITH 100 FOOT OF REACH WITH OPERATOR FOR SLURRY WALL ALONG THE NIQUALLY RIVER, | National Park Service | 8/20/2009 |
SAYBR CONTRACTORS, INC. | $235,712 | Tenant improvements at Sunrise Visitor Center | National Park Service | 5/10/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $220,340 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
AMEC E&I, INC | $217,406 |
Seismic upgrade/retrofit of USGS (United States Geological Survey) warehouse and storage facility. DM0031.
This spending item is part of a $1,235,614 allocation.
See details
|
Geological Survey | 6/28/2010 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $200,000 | Conservation Activities by Youth Service Organizations This is an agreement entered into between the Department of Ecology-Washington Conservation Corps (WCC) and the US Department of Interior, National Park Service. The purpose of the agreement is to complete trail construction and maintenance and d restorati... Show more | National Park Service | 5/12/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $192,500 | locate or decommission monitor wells in Washington State no longer in use | Geological Survey | 3/24/2010 |
FLEX-A-LITE CONSOLIDATED, INC. | $170,000 | Provide commercial Atlantic salmon egg incubation systems to include purchase and delivery of 80 ea. 16-Tray V-incubation with front isolation panels and 12 ea. 8-Tray V-Incubation with front isolation panels. | U.S. Fish and Wildlife Service | 9/19/2009 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $168,709 | Conservation Activities by Youth Service Organizations This is an agreement entered into between the Department of Ecology - Washington Conservation Corps (WCC) and the US Department of Interior, National Park Service. The purpose of the agreement is to complete maintenance and restoration projects o on Park Se... Show more | National Park Service | 7/23/2009 |
BARGREEN-ELLINGSON INC | $104,610 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
BCRA, INC. | $80,661 |
Construction of new administration/visitor center and repair work to the the Fish Hatchery facility in Tupelo, Mississippi
This spending item is part of a $1,262,191 allocation.
See details
|
U.S. Fish and Wildlife Service | 2/18/2010 |
SANDERS, ERIC J | $65,874 |
Install safety closures at abandoned mines to protect visitors and preserve resources.
This spending item is part of a $77,938 allocation.
See details
|
National Park Service | 4/08/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $59,500 | locate or decommission monitor wells in Washington State no longer in use | Geological Survey | 3/31/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $56,500 | locate wells in washington to be decommissioned | Geological Survey | 3/31/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $51,542 | Conservation Activities by Youth Service Organizations The award provided funding for services to the Mount Rainier National Park from the Student Conservation Association (SCA) youth conservation service program, to work in partnership with NPS repairing storm-damaged trails following flooding in NoNovember 20... Show more | National Park Service | 7/20/2009 |
LYNCH CREEK QUARRY LLC | $40,492 | Gravel backfill for trench being dug for the installation of utility line in Mt Rainier National Park | National Park Service | 4/19/2010 |
AA ASPHALTING INC. | $38,582 | Paving at Paradise, Mount Rainier National Park | National Park Service | 5/13/2010 |
TACOMA PUMP AND DRILLING CO. INC. | $38,500 | locate or decommission monitor wells in Washington State no longer in use | Geological Survey | 3/31/2010 |
NORTHWEST YOUTH CORPS | $38,405 | Conservation Activities by Youth Service Organizations NYC programs use an outdoor lifestyle and challenging projects to teach problem solving and positive living skills, promote a strong and productive work ethic, encourage learning, and build self-esteem. Youth in the program learn essential job b skills an... Show more | National Park Service | 8/06/2009 |
EARTHCORPS | $37,005 | EarthCorps and the National Park Service have a mutual interest in accomplishing needed conservation and environmental restoration projects in park units withing the State of Washington. This work will provide the young EarthCorps Members recruited by Ea | National Park Service | 8/06/2009 |
URS GROUP, INC. | $36,100 | Inspection services during the construction of seismic upgrades to three existing buildings; # 20 Warehouse Building; # 21 Old Service Station Building and; # 22 Locomotive Repair / Fab. Shop | Geological Survey | 9/20/2010 |
Acoustic Northwest Inc | $35,990 |
General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i
This spending item is part of a $8,140,651 allocation.
See details
|
National Park Service | 5/12/2010 |
CHIEF LESCHI SCHOOLS | $35,640 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching & learning for students most at risk of failing to meet state academic standards. | Indian Affairs (Assistant Secretary) | 8/01/2011 |
EVERGREEN TRACTOR LLC | $32,457 | Rent Hitachi ZX450LC Hydraulic Excavator w/ Thumb and Biodegradable Hydraulic Fluid, Hitachi/Komatsu 350 Hydraulic Excavator w/ Thumb and Biodegradable Hydraulic Fluid, Delivery and Pick up Fees for Both Units | National Park Service | 8/03/2009 |
LABORATORY DESIGN & CONSTRUCTION, INC. | $31,820 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
CHIEF LESCHI SCHOOLS | $31,600 | Education Technology State Grants, Recovery Act Educational Technology State Grants to States to improve student academic achievement through the innovative use and the effective integration of new and emerging technology with teacher training, curriculum development, and successful research-based ininst... Show more | Indian Affairs (Assistant Secretary) | 5/13/2010 |
Cascade Construction Company, Inc | $27,300 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
TACOMA PUMP AND DRILLING CO. INC. | $27,000 | locate or decommission monitor wells in Washington State no longer in use | Geological Survey | 3/24/2010 |
COUNTY OF PIERCE | $25,000 | 2010-2011 LiDAR update for Pierce County, Washington-Increased resolution for the Tacoma Fault and White River Fault System. | Geological Survey | 4/14/2011 |
CDT UNDERGROUND, L.L.C. | $15,795 | RECOVERY-Carsonite Posts-LDTDF0690000 | Bureau of Land Management | 9/01/2009 |
PUYALLUP TRIBE OF INDIANS | $13,063 |
Highway Planning and Construction Monies to go toward the road improvement of R St. and Grandview Stormwater Conveyance.
This spending item is part of a $1,810,616 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/26/2010 |
CDT UNDERGROUND, L.L.C. | $10,409 | RECOVERY -MT - Dillon HDPE PIPE | Bureau of Land Management | 8/10/2009 |
PIN FOUNDATIONS INC | $7,529 |
Delivery of Concrete Piers, Pins and Caps to: PWR - LEWI Lewis and Clark NHP
This spending item is part of a $7,981 allocation.
See details
|
National Park Service | 5/06/2010 |
FDS ENTERPRISES LLC | $7,075 | 15KV High Voltage underground distribution cable 2500.00 ft with 1/0 Aluminum conductor with jacketed concentric nuetrals. Cable is to be Okoguard URO-J full neutral Catalog#163-23-3072. Okoguard insulation: 220 mils; 133% insulation level delivery to L- | National Park Service | 7/21/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $5,630 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
CAMPBELL COX FLOOR COVERING INC | $3,008 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |