Spokane County, Wash., funds by Interior, Department of
Listing $3,206,404.79 in stimulus funds from Interior, Department of for Spokane
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NORTHERN MANAGEMENT SERVICES, INC. | $948,000 | This award report was submitted in error. the award number is a General Services Administration number and the Order number is a Fish and Wildlife number. there is no report. | U.S. Fish and Wildlife Service | 6/30/2010 |
NORTHERN MANAGEMENT SERVICES, INC. | $449,186 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
C X T INCORPORATED | $256,358 |
Manufacture, deliver and install 18 prefabricated, precast concrete restroom buildings at South Dune in Moreno Valley, CA.
This spending item is part of a $412,658 allocation.
See details
|
Bureau of Land Management | 11/18/2009 |
Holliday Heating Refrigeration & Appliance Repair | $198,042 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
KNIGHT CONST. & SUPPLY, INC. | $179,671 |
Services Provided: Screen chamber remediation, piping and design including wall reconstruction.
This spending item is part of a $431,700 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/16/2009 |
ECO DEPOT, INC. | $142,194 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $82,000 | Recreation Resource Management The jobs created by this award are Washington Conservation Corps (WCC) Crew Supervisor positions that oversee a crew of 5 AmeriCorps members working in general labor positions aimed at providing the necessary resources for trail and trailhead maintenance | Bureau of Land Management | 3/12/2010 |
BERRIGAN FORESTRY INC | $71,250 | Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. | Bureau of Land Management | 6/28/2010 |
CXT INCORPORATED | $63,466 | WH&B FLUSH BUILDING | Bureau of Land Management | 2/03/2010 |
FIRE CONTROL SPRINKLER SYSTEMS COMPANY | $62,971 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
CTA INC. | $52,595 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
CXT INCORPORATED | $52,566 |
CASPER VAULT TOILETS
This spending item is part of a $74,236 allocation.
See details
|
Bureau of Land Management | 2/19/2010 |
Electric Smith Inc | $50,250 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
BERRIGAN FORESTRY INC | $47,500 | Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devestating wild fires. | Bureau of Land Management | 4/13/2010 |
BRUBAKKEN AND REINBOLD INC | $45,100 | Grass Seed for Tuscarora Sage Brush Restoration | Bureau of Land Management | 2/11/2010 |
NORTHWEST STEEL FABRICATION,INC. | $43,256 |
The overall purpose of this award is to perform High-Pressure Gate Modifications at Pinto Dam, located on the Columbia Basin Project in the State of Washington. AUS (Associated Underwater Services, Inc.) expects to successfully complete this project usin
This spending item is part of a $1,093,850 allocation.
See details
|
Bureau of Reclamation | 4/19/2010 |
CXT INCORPORATED | $42,729 | PRECAST CONCRETE FLUSH TOILET BUILDING LAKE MEREDITH. | National Park Service | 2/01/2010 |
Excell Drywall Inc | $40,226 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
PORTER W. YETT COMPANY | $39,241 |
Amount of Award was modified to reflect Modifications 1 and 2. Construction of roadway including grade, drain, removal and disposal of existing bituminous pavement and drainage structures; construct placement of new storm drain system, placement of aggre
This spending item is part of a $1,757,435 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/14/2010 |
BERRIGAN FORESTRY INC | $38,900 | Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. | Bureau of Land Management | 9/21/2010 |
NOISE CONTROL OF WASHINGTON INC | $35,414 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
CXT INCORPORATED | $29,134 |
Manufacture, deliver and install prefabricated, precast concrete building at the Henry Mountains Field Station in Hanksville, UT.
This spending item is part of a $34,834 allocation.
See details
|
Bureau of Land Management | 8/18/2009 |
ASSOCIATED UNDERWATER SERVICES, INC. | $28,912 |
Roza Diversion Dam Roller Gate Replacement
This spending item is part of a $1,054,477 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
BERRIGAN FORESTRY INC | $27,900 | Lambert Cr. Fuels Reduction | Bureau of Land Management | 4/15/2010 |
CXT INCORPORATED | $27,720 |
MAPLE GROVE VAULT TOILETS
This spending item is part of a $38,310 allocation.
See details
|
Bureau of Land Management | 1/06/2010 |
CXT INCORPORATED | $25,714 | BLUTCHER CREEK SAFETY STRUCTURES | Bureau of Land Management | 2/16/2010 |
CXT INCORPORATED | $22,181 |
Manufacture, deliver and install 1 prefabricated, precast concrete restroom building at the North Fork Owyhee River Recreation Site.
This spending item is part of a $27,031 allocation.
See details
|
Bureau of Land Management | 9/11/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $20,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The award funds services to the Turnbull National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation seservice projects. Under the... Show more | U.S. Fish and Wildlife Service | 6/17/2009 |
C X T INCORPORATED | $16,823 | Manufacture, deliver and install prefabricated, precast concrete storage building at the Huckleberry Campground in St. Maries, ID. | Bureau of Land Management | 8/18/2009 |
Wayne-Dalton Corp. | $15,507 |
The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate
This spending item is part of a $948,000 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/15/2009 |
CLEARWATER SEED LLC | $13,300 | Grass seed for Recovery Tuscarora Sage Brush Restoration Seed | Bureau of Land Management | 2/11/2010 |
BERRIGAN FORESTRY INC | $9,500 | Lambert Cr. Fuels Reduction | Bureau of Land Management | 6/11/2010 |
BERRIGAN FORESTRY INC | $9,500 | Lambert Cr. Fuel Reduction | Bureau of Land Management | 6/11/2010 |
Specialty Insulation Inc | $7,087 |
The scope of this requirement is specifically listed in the project manual and generally described here: a. Provide sealants and caulking, as specified, at the building exterior envelope to provide a watertight and weather tight building. Provide weathe
This spending item is part of a $43,752 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/29/2009 |
Landau Associates, Inc. | $4,500 |
Folsom Powerplant Transformers K1A and K2A Replacements
This spending item is part of a $4,739,713 allocation.
See details
|
Bureau of Reclamation | 8/04/2009 |
CT DRYWALL & INTERIORS | $3,936 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |
LESLIE ENTERPRISES, INC. | $3,777 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
BERRIGAN FORESTRY INC | $0 | no jobs due to weather | Bureau of Land Management | 10/29/2009 |
C X T INCORPORATED | $0 |
Manufacture, deliver and install precast concrete restroom at the Point Reyes National Seashore.
This spending item is part of a $25,968 allocation.
See details
|
National Park Service | 9/10/2009 |