Dane County, Wis., funds by Interior, Department of
Listing $7,298,930.68 in stimulus funds from Interior, Department of for Dane
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $4,898,147 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
UNIVERSITY OF WISCONSIN SYSTEM | $300,000 | Volcano Hazards Program Research and Monitoring. We are carrying out a broad set of studies aimed at improving our understanding of the internal structure of two Alaskan volcanoes, Okmok and Mt. Augustine, and the seismogenic structures that lie within them, with the ultimate goal of improving seismimic m... Show more | Geological Survey | 11/17/2009 |
University of Wisconsin | $300,000 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 High-Resolution Analysis of Structure and Seismicity of Alaskan Volcanoes | Geological Survey | 11/17/2009 |
BLUESCOPE CONSTRUCTION, INC. | $256,119 | Provide new fire alarm and fire suppression system in the Maintenance/Garage located at National Wildlife Health Center, Madison, WI. In addition, connect the new fire alarm system to the Main Building's annuciator panel. Upgrade Tight Isolation Buildin | Geological Survey | 3/26/2010 |
VAN ERT ELECTRIC COMPANY, INC. | $230,000 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
MAC SOLUTIONS INC | $197,856 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
SUSTAINABLE ENGINEERING GROUP, LLC | $169,750 |
Perform Commissioning Services at Flandreau Indian School
This spending item is part of a $198,745 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/02/2010 |
PIEPER ELECTRIC, INC. | $159,654 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
DAIRYLAND ELECTRIC CO., INC. | $103,506 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
AFFILIATED ENGINEERS INC | $83,563 |
Preparation of contract documents for the rehabilitation of the Union Building Phase 2 Interior at Keweenaw National Historical Park, Calumet, Michigan
This spending item is part of a $294,870 allocation.
See details
|
National Park Service | 9/10/2009 |
PIONEER ROOFING, LLC | $59,963 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
McKinley's Corp | $53,500 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
PROFESSIONAL SYSTEM ANALYSIS, INC. | $50,919 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
Central Ceilings Systems, Inc. | $50,669 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
STRANG, INC. | $50,485 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
Labtech Midwest Inc | $49,770 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
CTA INC. | $46,860 | USGS National Wildlife Health Center Fire Alarm Fire Sprinkler Upgades - Madison, Wisconsin | Geological Survey | 9/17/2009 |
C3 LIMITED LIABILITY COMPANY | $44,500 | Provide Title III (Construction Managment) tasks for energy savings performance contract at National Wildlife Health Center, Madison, Wisconsin - $38,500. Modification 0001 - Add Title III Construction Management services in support of Phase 2 of the Ener | Geological Survey | 9/08/2010 |
KJWW, P.C | $38,135 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
Livesey Painting, Inc. | $36,521 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
BIG RED MACHINERY MOVERS, INC | $33,040 |
Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation.
See details
|
Geological Survey | 3/24/2010 |
BERNTSEN INTERNATIONAL, INC. | $31,688 | Survey monuments | Bureau of Land Management | 8/17/2010 |
BERNTSEN INTERNATIONAL, INC. | $30,360 | Survey Monuments | Bureau of Land Management | 9/12/2009 |
BERNTSEN INTERNATIONAL, INC. | $12,792 | Cadastral Monuments | Bureau of Land Management | 5/20/2010 |
CROP PRODUCTION SERVICES, INC. | $11,134 | Chemicals | U.S. Fish and Wildlife Service | 9/15/2009 |