Maricopa County, Ariz., funds by Interior, Department of
Listing $78,953,925.44 in stimulus funds from Interior, Department of for Maricopa
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
INTERNATIONAL SURFACING SYSTEMS, INC. | $23,897,911 | agenciesFurnish all labor, materials, and equipment necessary for the placement of asphalt rubberized surface treatment, fog seal, pavement markings, and miscellaneous construction in various agencies throughout the Navajo Nation in Arizona and New Mexico | Indian Affairs (Assistant Secretary) | 3/30/2010 |
GRANITE CONSTRUCTION COMPANY | $6,274,134 |
Road/Bridge, Repair & Restoration, Consolidated No. 1. Project ID #s H6867405, H6360203, H6369603, H636960J, H5460903
This spending item is part of a $12,357,323 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 8/26/2010 |
INTERNATIONAL SURFACING SYSTEMS, INC. | $4,792,550 | rubberized surfacing treatment, fog seal, pavement markings,and miscellaneous construction in various agencies. | Indian Affairs (Assistant Secretary) | 6/17/2010 |
CACTUS TRANSPORT, INC. | $4,689,062 |
Road/Bridge, Repair & Restoration, Consolidated No. 1. Project ID #s H6867405, H6360203, H6369603, H636960J, H5460903
This spending item is part of a $12,357,323 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 8/26/2010 |
Miller Bonded, Inc. | $3,633,390 |
Construction project to abate, demolition and renovate/rehabilitate High School Heating & Cooling system.
This spending item is part of a $6,491,291 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/28/2010 |
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY SOCIAL SERVICE, TH | $2,727,503 | Highway Planning and Construction Purpose of the project is to resurface existing roadways in order to extend their life. And to widen Pima Road from 2 to 4 lanes, H55A0700. | Indian Affairs (Assistant Secretary) | 6/15/2010 |
Haci Mechanical Contractors, Inc. | $2,661,162 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
AGATE, INC. | $2,503,505 |
Extend utilities to and within the site and to construct an Administrative Facility including an Administrative Building, Crew Quarters, and Storage Building along with miscellaneous site improvements including utilities, trash pad, decks, drives, walks,
This spending item is part of a $2,899,845 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/02/2010 |
Buesing Corp | $2,370,217 |
CONSTRUCT INLET CANAL AT TOPOCK MARSH AT HAVASU NWR
This spending item is part of a $2,771,016 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/29/2010 |
AGATE, INC. | $1,623,207 |
Extend utilities into the new building and construct a Hotshots Fire Facility along with the specified site improvements of landscaping.
This spending item is part of a $1,915,817 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/22/2010 |
PIERSON CONSTRUCTION CORPORATION | $1,169,687 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
Red River Contracting Inc | $1,157,300 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
MODULAR SOLUTIONS, LTD. | $1,105,918 | 3 Supai Camp Duplexes at Grand Canyon National Park in AZ, site prep, foundations, freight & installation | National Park Service | 11/23/2009 |
QUEST CIVIL CONSTRUCTORS, INC. | $1,100,176 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
AGATE, INC. | $1,040,388 |
Design and construct solar wildlife water collection system including water well pumps and booster stations, numerous tanks, localized fencing. Over 33 miles of small-diameter (1.5) water line and tanks for multiple systems in various locations.
This spending item is part of a $1,202,335 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/19/2010 |
RUMMEL CONSTRUCTION, INC. | $1,021,016 |
Provide all labor, equipment and material necessary to re-construct 2.8 miles of road BIA Route 232 on the Tohono O'odham Nation, Pima County, Arizona. The primary scopes of work include roadway grading, drainage improvements, place aggregate base course,
This spending item is part of a $1,414,457 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/30/2010 |
PIERSON CONSTRUCTION CORPORATION | $949,995 |
Road Maintenance_Indian Roads Project ID Number H5861602: To perform tribal project management, equipment purchase (i.e., Peterbilt Dump Truck (7 yard), Caterpillar Backhoe (420E) and Caterpillar Grader (140MO; route assessments on 669.5 miles of roadways; pavement preservation and sa
This spending item is part of a $2,419,882 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/26/2010 |
FELIX CONSTRUCTION COMPANY | $806,808 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
PAVEMENT MARKING INC | $732,150 |
Road/Bridge, Repair & Restoration, Consolidated No. 1. Project ID #s H6867405, H6360203, H6369603, H636960J, H5460903
This spending item is part of a $12,357,323 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 8/26/2010 |
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY SOCIAL SERVICE, TH | $727,503 | Road Construction Project - Asphalt overlay located on various IRR routes. | Interior, Department of | 5/07/2009 |
EDUCATION, ARIZONA DEPT OF | $593,500 | Title I Grants to Local Educational Agencies, Recovery Act To improve teaching and learning for students most at risk of failing to meet state academic achievement standards by providing early childhood education to preschool aged children. To hire for and develop Preschool teachings and paraprofessisionals that wi... Show more | Indian Affairs (Assistant Secretary) | 10/23/2009 |
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY | $569,400 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students at risk of failing to meet State academic achievement standards. Increase teacher effectiveness through the Mentor/Protege program, additional core curriculum materials, supplemental curriculum matererials, interve... Show more | Indian Affairs (Assistant Secretary) | 10/23/2009 |
MORSE COMMUNICATIONS, INC. | $543,521 | Data Network Solution | Office of Policy, Management and Budget/Chief Financial Officer | 9/24/2010 |
6K SWPPP, LLC | $526,730 | Demolition and removal of discontinued streamgages and cableways from various locations throughout the State of Arizona. | Geological Survey | 1/29/2010 |
NEXUS STEEL, LLC | $516,500 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
NAGAKI DESIGN - BUILD ASSOCIATES, INC. | $479,861 | Nagaki Design Build Associates, Inc. has been selected to remodel 5 existing cabins located at the South Rim of the Grand Canyon National Park. | National Park Service | 5/04/2010 |
Re-Creations, LLC | $404,805 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
6K SWPPP, LLC | $377,420 | Demolition and removal of discontinued streamgages and cableways from various locations throughout the state of Arizona. | Geological Survey | 3/10/2010 |
ARIZONA MINE RECLAMATION L.L.C. | $369,000 |
INSTALL SAFETY CLOSURES AT ABANDONED MINE LOCATIONS TO PROTECT VISITORS AND PRESERVE RESOURCE HABITAT AT THE JOSHUA TREE NATIONAL PARK.
This spending item is part of a $525,000 allocation.
See details
|
National Park Service | 4/02/2010 |
C3 LIMITED LIABILITY COMPANY | $367,149 |
CONSTRUCTION OF MOHAVE DESERT FIRE STATION
This spending item is part of a $718,769 allocation.
See details
|
Bureau of Land Management | 6/28/2010 |
Pine River Construction, Inc. | $352,907 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
CACTUS TRANSPORT, INC. | $283,041 |
Provide all labor, equipment and material necessary to re-construct 2.8 miles of road BIA Route 232 on the Tohono O'odham Nation, Pima County, Arizona. The primary scopes of work include roadway grading, drainage improvements, place aggregate base course,
This spending item is part of a $1,414,457 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/30/2010 |
RBF CONSULTING FOUNDATION | $279,900 |
Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo
This spending item is part of a $1,073,044 allocation.
See details
|
Bureau of Land Management | 12/22/2009 |
ECOPLAN ASSOCIATES INC | $250,000 | Lower Colorado River Multi-Species Conservation Program. The purpose of this contract is to determine hydraulic conditions such as soil moisture, depth to ground water, and amount of standing water needed beneath habitat for the willow flycatcher and yellow-billed cuckoos in order to duplicate condititions at hab... Show more | Bureau of Reclamation | 11/30/2009 |
IRONCO ENTERPRISES LLC | $247,575 |
CONSTRUCT INLET CANAL AT TOPOCK MARSH AT HAVASU NWR
This spending item is part of a $2,771,016 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/29/2010 |
Sunset Acoustics Inc | $241,650 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
PROGRESSIVE SERVICES, INC. | $241,570 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
Four Stars Mechanical, L.L.C. | $233,572 |
Remove, refurbish and reinstall boiler heating system throughout the administrative offices, residences and visitor center at the Painted Desert/ Petrified Forest National Park.
This spending item is part of a $360,324 allocation.
See details
|
National Park Service | 9/01/2009 |
WHPACIFIC, INC. | $230,991 | To perform Planning Phase Services for replacement of a boarding school. | Indian Affairs (Assistant Secretary) | 10/28/2009 |
SYBRANT CONSTRUCTION, LLC | $223,820 |
100% design of the Historic Bighorn Station Site Stabilization
This spending item is part of a $247,800 allocation.
See details
|
Bureau of Land Management | 6/30/2010 |
QUEST CIVIL CONSTRUCTORS, INC. | $222,395 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY SOCIAL SERVICE, TH | $219,169 | Road Maintenance_Indian Roads Project ID H5561505 - Purpose of the project is to bring roads operating at an unacceptable level of service (LOS 3) into acceptable levels (LOS 1 or 2). We expect all roads selected will move from a LOS 3 to a LOS 2. | Indian Affairs (Assistant Secretary) | 3/05/2010 |
SYBRANT CONSTRUCTION, LLC | $205,809 | Replace the wood shake roofs on 11 historic buildings in Yosemite National Park | National Park Service | 4/22/2010 |
WHPACIFIC, INC. | $205,479 | To perform Project Management and Administrative Services for Western BIA. | Indian Affairs (Assistant Secretary) | 3/31/2010 |
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY SOCIAL SERVICE, TH | $201,000 | SRIR Road Repair and Restoration | Interior, Department of | 10/01/2009 |
AGATE, INC. | $196,426 |
Design and construct an existing campground facility at the Rhyolite Recreation Site including modifying existing recreational vehicle (RV) pad, sewage system, potable water system, electrical system and telephone lines to RV pads.
This spending item is part of a $267,487 allocation.
See details
|
U.S. Fish and Wildlife Service | 7/28/2010 |
A TEAM PROFESSIONAL ASSOCIATES INC | $188,100 |
Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo
This spending item is part of a $1,073,044 allocation.
See details
|
Bureau of Land Management | 12/22/2009 |
Mmi Tank, Inc. | $185,590 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
PIERSON CONSTRUCTION CORPORATION | $173,696 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
MODULAR SOLUTIONS, LTD. | $153,021 | PROVIDE ONE PORTABLE CLASSROOM BUILDING AND SITE WORK FORM MODULAR SOLTUIONS TO BLACKWATER COMMUNITY SCHOOL. PORTABLE FOR SCHOOL WILL USE THE IDIQ RATES FOR THE TRANSPORATION AND SETUP. SITE WORK COST WILL INDCLUDE ALL COST ASSOCIATED WITH UTILITY INFRAST | Indian Affairs (Assistant Secretary) | 4/01/2010 |
GAME AND FISH, ARIZONA DEPT OF | $139,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The Recipient will use this funding to condnet recovery work for Gila trout, a federally threatened species, on three streams (Frye, Ash, and Marijilda creeks) in the Pinaleno Mountains on the Safford Ranger District of Coronado N National Forest. Funding w... Show more | U.S. Fish and Wildlife Service | 3/23/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $132,000 | Construct exterior shell of 2,800 Sf administration building with no interior finish. All framing was completed. | National Park Service | 10/08/2009 |
Vision Grading & Concrete, LLC | $130,896 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
GAME AND FISH, ARIZONA DEPT OF | $121,675 | WILDLIFE SURVEY AND REMOVAL AND POST-CLOSURE AT ABONDONED MINES IN CORONADO MATIONAL MEMORIAL | National Park Service | 9/16/2010 |
GAME AND FISH, ARIZONA DEPT OF | $121,675 | WILDLIFE SURVEY AND REMOVAL AND POST-CLOSURE AT ABONDONED MINES IN CORONADO MATIONAL MEMORIAL | National Park Service | 9/16/2010 |
WESTON SOLUTIONS, INC | $121,516 | The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm | Bureau of Land Management | 1/04/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $118,638 | Re-roofing residences in three different parks. Ft. Bowie, Chiricahua, and Saguaro East. | National Park Service | 9/09/2009 |
Imperial West Inc | $114,000 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
ARIZONA MINE RECLAMATION L.L.C. | $112,000 |
INSTALL SAFETY CLOSURES AT 12 EACH ABANDONED MINE LOCATIONS TO PROTECT VISITORS AND PRESERVE RESOURCE HABITAT AT THE YOSEMITE NATIONAL PARK.
This spending item is part of a $137,000 allocation.
See details
|
National Park Service | 5/03/2010 |
FELIX CONSTRUCTION COMPANY | $108,400 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
CONTINENTAL FLOORING COMPANY | $103,498 | Installation Carpet Tile and Vinyl Cove Base | Indian Affairs (Assistant Secretary) | 8/30/2010 |
FT MC DOWELL YAVAPAI NATION | $101,296 | Highway Planning and Construction Project ID H55A04 Road re-construction of Wasaja Road FMIR 102.4 IRR Road | Indian Affairs (Assistant Secretary) | 1/29/2010 |
WESTON SOLUTIONS, INC | $99,048 |
The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm
This spending item is part of a $134,798 allocation.
See details
|
Bureau of Land Management | 1/04/2010 |
SYBRANT CONSTRUCTION, LLC | $95,241 | Solar Water Wells@ Stone Lakes NWR, Elk Grove CA | U.S. Fish and Wildlife Service | 12/30/2009 |
Temcon Concrete Construction Co. | $92,400 |
Provide all labor, equipment and material necessary to re-construct 2.8 miles of road BIA Route 232 on the Tohono O'odham Nation, Pima County, Arizona. The primary scopes of work include roadway grading, drainage improvements, place aggregate base course,
This spending item is part of a $1,414,457 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/30/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $90,922 | Rehabilitate Maintenance Building - Coronado National Memorial | National Park Service | 9/14/2008 |
BEAR CAT MFG., INC | $90,000 | Rental of Chip Spreader for 6 months | Indian Affairs (Assistant Secretary) | 3/30/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $85,808 | Remodle of existing resisdence to law enforcement office. | National Park Service | 5/01/2009 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $81,892 | Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Creek consisting of approx. 157 acres. | Bureau of Land Management | 9/14/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $79,260 | LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Rabbit Treatment Unit | Bureau of Land Management | 8/21/2010 |
PHOENIX HIGHWAY SERVICES, INC. | $78,990 | This award covers electronic components, assemblies and hands-on technical support for the initial effort to install and 'turn on' traffic signal-related systems on roadways/intersections maintained by the Division of Transportation - Fort Defiance on th | Indian Affairs (Assistant Secretary) | 5/07/2010 |
EMPOWER EDUCATIONAL CONSULTING L.L.C. | $78,252 | Empower has been awarded the opportunity to consult Teachers in Tuba City Boarding School. We also have been given the opportunity to provide these teachers with our Literacy Work Stations our company has created and published!! | Indian Affairs (Assistant Secretary) | 3/16/2010 |
EMPOWER EDUCATIONAL CONSULTING L.L.C. | $78,252 | Professional Development | Indian Affairs (Assistant Secretary) | 3/16/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $76,917 | Las Cienegas National Conservation Area Recovery Award Restoration Stewardship project to perform mechanical Mesquite reduction to treatment unit Bear consisting of approx 147 acres | Bureau of Land Management | 9/14/2010 |
Artcraft Granite, Marble & Tile Company | $76,660 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
HUNTER GUARD RAIL & FENCE CO | $75,400 |
Road/Bridge, Repair & Restoration, Consolidated No. 1. Project ID #s H6867405, H6360203, H6369603, H636960J, H5460903
This spending item is part of a $12,357,323 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 8/26/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $73,984 | Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Cottonwood consisting of approx. 139 acres | Bureau of Land Management | 9/14/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $73,940 | LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Elk Treatment Unit | Bureau of Land Management | 8/21/2010 |
KENYON PLASTERING, INC. | $73,230 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $71,580 | LCGR Grasslands Restoration Project,Mechanical Mesquite Reduction, Middle Treatment Unit | Bureau of Land Management | 6/08/2010 |
JERRY MORRISON, INC. | $71,280 | Contract to repair and construct 13.5 miles of The Black Canyon National Recreation Trail. | Bureau of Land Management | 3/18/2010 |
GAME AND FISH, ARIZONA DEPT OF | $70,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. To provide technical and financial assistance to identify, protect, conserve, manage, enhance or restore habitat or species on private lands. | U.S. Fish and Wildlife Service | 7/29/2009 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $67,860 | LCNCA Grassland Restoration Project-Mechanical Mesquite Reduction, Hackberry Treatment Unit | Bureau of Land Management | 8/21/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $66,600 | LCGR Grassland Restoration Project Mechanical Mesquite Reduction, Eagle Treatment Unit | Bureau of Land Management | 6/14/2010 |
CSC ELECTRIC LLC | $65,969 | Greenwood Communications sites improvement including electrical, fencing and concrete work. | Bureau of Land Management | 3/25/2010 |
CSC ELECTRIC LLC | $65,969 | Greenwood Communications sites improvement including electical, fencing and concrete work. | Bureau of Land Management | 3/25/2010 |
PHOENIX HIGHWAY SERVICES, INC. | $65,676 | This award covers electronic components, assemblies and hands-on technical support for the initial effort to install and 'turn on' traffic signal-related systems on roadways/intersections maintained by the Division of Transportation - Fort Defiance on th | Indian Affairs (Assistant Secretary) | 5/07/2010 |
Atlas Fire Protection L.L.C. | $65,000 |
KANAB OFFICE BUILDING
This spending item is part of a $7,069,529 allocation.
See details
|
Bureau of Land Management | 9/16/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $64,913 | To remove existing unsafe concrete and concrete paver sidewalks in front plaza of the visitor center and replace it with new concrete and compliant ADA ramp. Also upgrade drainage of stormwater from rooftop and add light bollards to help visibility for f | National Park Service | 10/08/2009 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $64,820 | LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Lion Treatment Unit | Bureau of Land Management | 8/20/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $62,080 | LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Jaguar Treatment Unit | Bureau of Land Management | 8/20/2010 |
FT MC DOWELL YAVAPAI NATION | $56,653 | Road Maintenance_Indian Roads Project ID H5561306 FMIR R&R Repair 3.5 miles of road on the reservation. | Indian Affairs (Assistant Secretary) | 3/29/2010 |
Quest Energy Group LLC | $55,800 |
On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W
This spending item is part of a $1,315,784 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/30/2009 |
SPRAY SYSTEMS OF ARIZONA INC. | $47,560 |
Construction project to abate, demolition and renovate/rehabilitate High School Heating & Cooling system.
This spending item is part of a $6,491,291 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/28/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $43,460 | LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Javelina Treatment Unit | Bureau of Land Management | 8/20/2010 |
SKY CONSTRUCTION AND ENGINEERING, INC. | $43,136 | Install 800Lf of electrical wire to corrals | National Park Service | 10/13/2009 |
Conn Matthew Architect | $42,278 |
On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W
This spending item is part of a $1,315,784 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/30/2009 |
RELIANCE STEEL & ALUMINUM CO. | $41,920 | 1. grip strut # 32012 12 ga x 7 x 144 2. grip strut # 42012 12 ga x 9-1/2 x 144 3. grip strut # 52012 12 ga x 11-3/4 x 144 4.grip strut # 22012 12 ga x 4-3/4 x 144 5. processing fuel surcharge | Indian Affairs (Assistant Secretary) | 7/13/2010 |
Accel Fire Systems, LLC | $41,481 |
Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation.
See details
|
National Park Service | 8/26/2009 |
ERM-WEST, INC | $40,179 | ERM to perform environmental investigation of the BLM Octave Mill Site in Yavapai County, Arizona. The investigation will include environmental sampling to determine the nature and extent of suspected soil contamination from the abandoned gold mine activ | Bureau of Land Management | 1/06/2010 |
GAME AND FISH, ARIZONA DEPT OF | $40,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. To provide technical and financial assistance to identify, protect, conserve, manage, enhance or restore habitat or species on private lands. | U.S. Fish and Wildlife Service | 7/30/2009 |
GOLD HORIZON CONTRACTING, LLC | $38,747 | Project in Prescott - Congressional District 01. Contractor shall provide labor, materials, equipment and services to provide construction activities to crack cleaning and sealing and applying a preservative seal on 2.200 miles of Route 101 (Mescal Court, | Indian Affairs (Assistant Secretary) | 6/30/2010 |
Ardc Demolition LLC | $35,900 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
YELLOW JACKET DRILLING SERVICES, LLC | $35,750 |
The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm
This spending item is part of a $134,798 allocation.
See details
|
Bureau of Land Management | 1/04/2010 |
Real Property Painting, Inc. | $35,000 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
KLEINFELDER WEST, INC. | $34,508 |
Highway Planning and Construction Tribal Mgt and pre-construction activities (planning, survey, design, archeology, environmental, right-of-way) to develop PS&E documents for the reconstruction of Hulet Road, H51A0200, and to develop PS&E documents for reconstruction of California Village
This spending item is part of a $464,980 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 1/28/2010 |
SITETEK FINANCIAL ARTS INC | $30,492 |
Design Services for T'iis Naz Bas B.I.A. Community School, Facility Improvements and Repairs in Teec Nos Bas, Arizona Development: Plan of Record (Scope of Work), Value Engineering Analysis, Environmental Assessment Evaluation, Construction Estimate, Sch
This spending item is part of a $604,500 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/15/2009 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $29,100 | LCNCA Grassland Restoratioon Project - Mechanical Mesquite Reduction, Goulds Treatment Unit | Bureau of Land Management | 8/27/2010 |
EMPOWER EDUCATIONAL CONSULTING L.L.C. | $28,800 | Professional Development | Indian Affairs (Assistant Secretary) | 1/31/2011 |
WILSON ELECTRIC SERVICES CORP. | $28,500 |
BOQUILLAS ADMIN SITE MAINTENANCE BUILDING
This spending item is part of a $352,317 allocation.
See details
|
Bureau of Land Management | 6/28/2010 |
Roosevelt Irrigation District | $27,461 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
Arizona Glass Specialists | $27,220 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
NASH BUILDING CONSOLIDATED LLC | $27,200 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
Little Enterprises Inc | $26,528 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
SPRAY SYSTEMS OF ARIZONA INC. | $25,754 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
Certified Health and Safety Consulting Inc | $23,884 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
FELIX CONSTRUCTION COMPANY | $22,982 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
PIERSON CONSTRUCTION CORPORATION | $15,521 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
WESTERN FENCE CO, INC. | $14,500 |
100% design of the Historic Bighorn Station Site Stabilization
This spending item is part of a $247,800 allocation.
See details
|
Bureau of Land Management | 6/30/2010 |
EAGLE PASS CONSTRUCTION LLC | $14,300 | RECOVERY SOLICITATION | Bureau of Land Management | 12/09/2009 |
AMERI-FAB, LLC | $14,035 |
DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ
This spending item is part of a $41,224,703 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/25/2010 |
GALE CONTR PHOENIX CONVENTION CTR EXPANSION CCIP | $10,398 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
PALEOWEST, L.L.C. | $10,101 | Cultural assessment services to occur within the Las Cienegas National Conservation Area. | Bureau of Land Management | 9/22/2009 |
CACTUS TRANSPORT, INC. | $9,480 |
100% design of the Historic Bighorn Station Site Stabilization
This spending item is part of a $247,800 allocation.
See details
|
Bureau of Land Management | 6/30/2010 |
SPRAY SYSTEMS OF ARIZONA INC. | $7,820 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
APA INDUSTRIES, INC. | $7,000 |
Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/24/2010 |
North Sight Land Survey Consulting | $6,500 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
Starr Painting | $5,750 |
CONSTRUCTION OF MOHAVE DESERT FIRE STATION
This spending item is part of a $718,769 allocation.
See details
|
Bureau of Land Management | 6/28/2010 |
SPEEDIE & ASSOCIATES, INC. | $5,550 |
Roads Project FAIR 4(2) Preservation of existing roadway, curb, gutter and sidewalk - Project ID H52A0100
This spending item is part of a $667,829 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/30/2010 |
ROCKART SIGNS & MARKERS | $4,056 | Tree Huggers and weathering edge tape | Bureau of Land Management | 9/12/2009 |
ROCKART SIGNS & MARKERS INC | $3,243 | Water Level Staff Gauges | Bureau of Reclamation | 9/14/2009 |
EPG, INC. | $1,665 |
Revised and answered questions on the cultural resources report and analysis.
This spending item is part of a $1,420,440 allocation.
See details
|
Bureau of Land Management | 6/17/2010 |
PEORIA, CITY OF (INC) | $0 |
Water 2025 The award will fund three projects. 1. Peoria Sports Complex Well Modification - this project will convert the well system at the City of Peoria Sports Complex from potable to non-potable water, which is an interim step until the CityG??s reclaimed water
This spending item is part of a $1,793,291 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |