Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Los Angeles County, Calif., funds by Interior, Department of

Listing $30,070,691.75 in stimulus funds from Interior, Department of for Los Angeles

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CENTRAL BASIN MUNICIPAL WATER DISTRICT FINANCING CORPORATION $5,545,000 Water Reclamation and Reuse Program The Southeast Water Reliability Project Phase 1 consists of the following three phases: 30-inch Pipeline, Pico Rivera Recycled Water Pipeline, and Pico Rivera Recycled Water Pipeline. Bureau of Reclamation 12/23/2009
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT $4,969,000 Water Reclamation and Reuse Program The Recipient shall design and construct the following facilities: * The Project includes about 12.4 miles of recycled water distribution pipelines, varying from 6 to 24 inches in diameter, installed in existing streets. The proposed alignment will cross Bureau of Reclamation 12/11/2009
KINEMETRICS, INC. $1,961,763 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/09/2010
LAS VIRGENES MUNICIPAL WATER DIST $1,879,173 Water 2025 The Mulholland Highway recycled water transmission main consists of the construction and operation of a new 24-inch recycled water paperline. Bureau of Reclamation 9/29/2009
KINEMETRICS, INC. $1,667,541 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/12/2010
CALIFORNIA INSTITUTE OF TECHNOLOGY $1,200,000 Earthquake Hazards Reduction Program This proposal requests Government Furnished Equipment (GFE), funding for installing this equipment and other upgrades of the Southern California Seismographic Network (SCSN), a cooperative project of Caltech and the Pasadena office of the U. S. Geologic Geological Survey 9/15/2009
LONG BEACH, CITY OF $1,184,000 Water Reclamation and Reuse Program Complete four specific parts of the feasibility study for the Long Beach Desalination Research and Development Project. 1) Seawater Desalination Plant Optimization. This research includes the purchase of different types of NF membranes, which will be in Bureau of Reclamation 9/29/2009
KINEMETRICS, INC. $1,147,862 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/12/2010
KINEMETRICS, INC. $920,951 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 7/23/2009
CHESTER KING $783,000 Archaeological studies related to construction of a visitor center at King Gillette Ranch SMMNRA National Park Service 4/16/2010
CHESTER KING $783,000 archaeological studies related to construction of visitor center at King Gillette Ranch National Park Service 4/16/2010
KINEMETRICS, INC. $760,733 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 6/29/2009
HUR FLOORING CO $759,485 The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation. See details
Indian Affairs (Assistant Secretary) 9/29/2009
KINEMETRICS, INC. $651,199 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 6/29/2009
KINEMETRICS, INC. $626,850 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 9/18/2009
BUS SERVICES CORPORATION $585,318 Mesa Verde National Park RECOVERY Biodiesel Trams MEVL National Park Service 3/26/2010
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT $481,000 Water Reclamation and Reuse Program This work includes the design and construction of recycled water pipelines varying from 4 to 16 inches in diameter extending west from the Whittier Narrows Water Reclamation Facility. The project facilities to be constructed are: - The main pipeli Bureau of Reclamation 12/11/2009
G & C EQUIPMENT CORPORATION $403,463 Construction award for Construction award for emergency repairs for settlement at the Jefferson Memorial Seawall. Scope of work includes removal of historic granite pieces at the seawall, to be cleaned and reinstalled at the completion of the contract.
This spending item is part of a $13,516,484 allocation. See details
National Park Service 9/17/2009
ATKINS NORTH AMERICA, INC $367,504 Interagency Visitor Center at King Gillette Ranch at Santa Monica Mountains NRA, Thousand Oaks, CA National Park Service 8/09/2010
KINEMETRICS, INC. $243,508 Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/31/2010
WATER REPLENISHMENT DISTRICT OF SOUTHERN CALIFORNIA $238,803 Water Reclamation and Reuse Program The preparation of preliminary designs, preparation of a Title 22 engineering report, compliance with CEQA and NEPA, permitting support, and final design for the Alamitos Barrier Recycled Water Project Expansion. Bureau of Reclamation 12/23/2009
VIRCO MFG. CORPORATION $236,289 Classroom furniture & equipment Indian Affairs (Assistant Secretary) 5/19/2010
Morrow Meadows Corporation $212,012 Lighting upgrades to the main classroom building, auditorium, gymnasium and installation of exterior lighting at Chemawa Indian School.
This spending item is part of a $308,228 allocation. See details
Indian Affairs (Assistant Secretary) 9/21/2009
SANTA CATALINA ISLAND CONSERVANCY $211,000 Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. This project offsets the loss and alteration of important habitats in California and provides jobs as required by ARRA. The project objective is to improve habitat values for wildlife and plants, both in quantity and quality, thr... Show more U.S. Fish and Wildlife Service 8/11/2009
KRISTER OLMON, INC. $201,734 Continuation of exhibit planning and design services for the Union Building Interpretive Facilitry at Keweenaw National Historical Park. Scope of work includes planning and design of exhibits, research , text writing, audio-visual treatments, artifact and National Park Service 9/23/2009
PARAMOUNT SCAFFOLD, INC. $200,755 Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu
This spending item is part of a $1,289,000 allocation. See details
Bureau of Reclamation 4/30/2010
KINEMETRICS, INC. $191,509 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/18/2010
ABBA DISTRIBUTORS, INC. $184,863 The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation. See details
Indian Affairs (Assistant Secretary) 9/29/2009
KINEMETRICS, INC. $158,204 Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/31/2010
TARA MOORE & ASSOCIATES INC $125,000 Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation. See details
National Park Service 8/26/2009
LOS ANGELES CONSERVATION CORPS $114,135 Conservation Activities by Youth Service Organizations The purpose of this project is to rehabilitate a 1.4 mile section of the Backbone Trail System. National Park Service 5/04/2010
INTERSCAN CORPORATION $111,536 Environmental measurement devices for measuring toxic gases related to volcanic activity. Ultimate delivery schedule pending payment in accordance with our N30 day terms as invoiced. Tentative delivery schedule as follows: SO2 and H2S Analyzers: Week o Geological Survey 3/29/2010
ALLSTATE ENGINEERING $109,000 RECOVERY - North Shore Marina RV Park Cleanup, Riverside County, CA Bureau of Reclamation 12/29/2009
KINEMETRICS, INC. $105,473 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/18/2010
KINEMETRICS, INC. $89,880 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/16/2010
KINEMETRICS, INC. $76,247 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/29/2010
KINEMETRICS, INC. $66,427 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 3/25/2010
RANCHO SANTA ANA BOTANIC GARDEN $65,000 Fish, Wildlife and Plant Conservation Resource Management The overall objective of this project is to further the conservation of sensitive public resources, through seed collecting and seed banking of Federally listed plant species on BLM lands. This will be achieved by establishing a mentoring pro... Show more Bureau of Land Management 1/20/2010
ABBA DISTRIBUTORS, INC. $51,302 22000sf metal building for civil maintenance
This spending item is part of a $6,753,706 allocation. See details
Bureau of Reclamation 8/03/2010
KRISTER OLMON, INC. $48,201 Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer National Park Service 5/14/2010
EN POINTE GOV INC $48,133 Award for HP Switches National Park Service 4/14/2010
KRISTER OLMON, INC. $48,021 Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer National Park Service 5/14/2010
EXBON DEVELOPMENT, INC. $46,129 Complete demolition of two existing 5 ton HVAC systems, and replace with upgrades of energy star units National Park Service 8/26/2009
AC PROS, INC. $30,980 Maint, rep/alter/all other, replacement of 2 HVAC units with air ducts
This spending item is part of a $46,129 allocation. See details
National Park Service 8/26/2009
DATALED TECHNOLOGIES, INC. $29,000 T-8 LED TUBES National Park Service 2/04/2010
DATALED TECHNOLOGIES, INC. $29,000 ARRA-Light BULB REPLACE, LED T-8 TYPE LAMPS National Park Service 2/04/2010
SURIRAT DEVELOPMENT, INC. $26,005 Roan plateau travel management Bureau of Land Management 6/01/2010
KINEMETRICS, INC. $24,581 Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). Geological Survey 1/04/2009
SURIRAT DEVELOPMENT, INC. $18,897 Eqipment w/operator Bureau of Land Management 3/03/2010
MOD ELECTRONICS INC $17,894 GPS Clocks Geological Survey 12/08/2009
Morrow Meadows Corporation $16,073 Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation. See details
Indian Affairs (Assistant Secretary) 9/24/2009
EXBON DEVELOPMENT, INC. $15,149 Maint, rep/alter/all other, replacement of 2 HVAC units with air ducts
This spending item is part of a $46,129 allocation. See details
National Park Service 8/26/2009
KRISTER OLMON, INC. $3,114 AE DESIGN SERVICES FOR SCHEMATIC DESIGN DEVELOPMENT AND CONSTRUCTION FOR FURNACE CREEK VISITORS CENTER AT DEATH VALLEY NATIONAL PARK.
This spending item is part of a $291,741 allocation. See details
National Park Service 8/06/2009