Los Angeles County, Calif., funds by Interior, Department of
Listing $30,070,691.75 in stimulus funds from Interior, Department of for Los Angeles
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CENTRAL BASIN MUNICIPAL WATER DISTRICT FINANCING CORPORATION | $5,545,000 | Water Reclamation and Reuse Program The Southeast Water Reliability Project Phase 1 consists of the following three phases: 30-inch Pipeline, Pico Rivera Recycled Water Pipeline, and Pico Rivera Recycled Water Pipeline. | Bureau of Reclamation | 12/23/2009 |
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT | $4,969,000 | Water Reclamation and Reuse Program The Recipient shall design and construct the following facilities: * The Project includes about 12.4 miles of recycled water distribution pipelines, varying from 6 to 24 inches in diameter, installed in existing streets. The proposed alignment will cross | Bureau of Reclamation | 12/11/2009 |
KINEMETRICS, INC. | $1,961,763 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/09/2010 |
LAS VIRGENES MUNICIPAL WATER DIST | $1,879,173 | Water 2025 The Mulholland Highway recycled water transmission main consists of the construction and operation of a new 24-inch recycled water paperline. | Bureau of Reclamation | 9/29/2009 |
KINEMETRICS, INC. | $1,667,541 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/12/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,200,000 | Earthquake Hazards Reduction Program This proposal requests Government Furnished Equipment (GFE), funding for installing this equipment and other upgrades of the Southern California Seismographic Network (SCSN), a cooperative project of Caltech and the Pasadena office of the U. S. Geologic | Geological Survey | 9/15/2009 |
LONG BEACH, CITY OF | $1,184,000 | Water Reclamation and Reuse Program Complete four specific parts of the feasibility study for the Long Beach Desalination Research and Development Project. 1) Seawater Desalination Plant Optimization. This research includes the purchase of different types of NF membranes, which will be in | Bureau of Reclamation | 9/29/2009 |
KINEMETRICS, INC. | $1,147,862 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/12/2010 |
KINEMETRICS, INC. | $920,951 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 7/23/2009 |
CHESTER KING | $783,000 | Archaeological studies related to construction of a visitor center at King Gillette Ranch SMMNRA | National Park Service | 4/16/2010 |
CHESTER KING | $783,000 | archaeological studies related to construction of visitor center at King Gillette Ranch | National Park Service | 4/16/2010 |
KINEMETRICS, INC. | $760,733 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 6/29/2009 |
HUR FLOORING CO | $759,485 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
KINEMETRICS, INC. | $651,199 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 6/29/2009 |
KINEMETRICS, INC. | $626,850 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 9/18/2009 |
BUS SERVICES CORPORATION | $585,318 | Mesa Verde National Park RECOVERY Biodiesel Trams MEVL | National Park Service | 3/26/2010 |
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT | $481,000 | Water Reclamation and Reuse Program This work includes the design and construction of recycled water pipelines varying from 4 to 16 inches in diameter extending west from the Whittier Narrows Water Reclamation Facility. The project facilities to be constructed are: - The main pipeli | Bureau of Reclamation | 12/11/2009 |
G & C EQUIPMENT CORPORATION | $403,463 |
Construction award for Construction award for emergency repairs for settlement at the Jefferson Memorial Seawall. Scope of work includes removal of historic granite pieces at the seawall, to be cleaned and reinstalled at the completion of the contract.
This spending item is part of a $13,516,484 allocation.
See details
|
National Park Service | 9/17/2009 |
ATKINS NORTH AMERICA, INC | $367,504 | Interagency Visitor Center at King Gillette Ranch at Santa Monica Mountains NRA, Thousand Oaks, CA | National Park Service | 8/09/2010 |
KINEMETRICS, INC. | $243,508 | Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/31/2010 |
WATER REPLENISHMENT DISTRICT OF SOUTHERN CALIFORNIA | $238,803 | Water Reclamation and Reuse Program The preparation of preliminary designs, preparation of a Title 22 engineering report, compliance with CEQA and NEPA, permitting support, and final design for the Alamitos Barrier Recycled Water Project Expansion. | Bureau of Reclamation | 12/23/2009 |
VIRCO MFG. CORPORATION | $236,289 | Classroom furniture & equipment | Indian Affairs (Assistant Secretary) | 5/19/2010 |
Morrow Meadows Corporation | $212,012 |
Lighting upgrades to the main classroom building, auditorium, gymnasium and installation of exterior lighting at Chemawa Indian School.
This spending item is part of a $308,228 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/21/2009 |
SANTA CATALINA ISLAND CONSERVANCY | $211,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. This project offsets the loss and alteration of important habitats in California and provides jobs as required by ARRA. The project objective is to improve habitat values for wildlife and plants, both in quantity and quality, thrhrough restoration, enhance... Show more | U.S. Fish and Wildlife Service | 8/11/2009 |
KRISTER OLMON, INC. | $201,734 | Continuation of exhibit planning and design services for the Union Building Interpretive Facilitry at Keweenaw National Historical Park. Scope of work includes planning and design of exhibits, research , text writing, audio-visual treatments, artifact and | National Park Service | 9/23/2009 |
PARAMOUNT SCAFFOLD, INC. | $200,755 |
Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu
This spending item is part of a $1,289,000 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
KINEMETRICS, INC. | $191,509 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/18/2010 |
ABBA DISTRIBUTORS, INC. | $184,863 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
KINEMETRICS, INC. | $158,204 | Supply accelerometer and other eqrthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/31/2010 |
TARA MOORE & ASSOCIATES INC | $125,000 |
Replace the Student Intern Center Destroyed by Fire at the Santa Monica Mountains Recreation Area, Los Angles County, California. This is a Design / Build project that includes the construction of a 2,700 square foot building to replace the facilities de
This spending item is part of a $2,392,542 allocation.
See details
|
National Park Service | 8/26/2009 |
LOS ANGELES CONSERVATION CORPS | $114,135 | Conservation Activities by Youth Service Organizations The purpose of this project is to rehabilitate a 1.4 mile section of the Backbone Trail System. | National Park Service | 5/04/2010 |
INTERSCAN CORPORATION | $111,536 | Environmental measurement devices for measuring toxic gases related to volcanic activity. Ultimate delivery schedule pending payment in accordance with our N30 day terms as invoiced. Tentative delivery schedule as follows: SO2 and H2S Analyzers: Week o | Geological Survey | 3/29/2010 |
ALLSTATE ENGINEERING | $109,000 | RECOVERY - North Shore Marina RV Park Cleanup, Riverside County, CA | Bureau of Reclamation | 12/29/2009 |
KINEMETRICS, INC. | $105,473 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/18/2010 |
KINEMETRICS, INC. | $89,880 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/16/2010 |
KINEMETRICS, INC. | $76,247 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/29/2010 |
KINEMETRICS, INC. | $66,427 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 3/25/2010 |
RANCHO SANTA ANA BOTANIC GARDEN | $65,000 | Fish, Wildlife and Plant Conservation Resource Management The overall objective of this project is to further the conservation of sensitive public resources, through seed collecting and seed banking of Federally listed plant species on BLM lands. This will be achieved by establishing a mentoring prorogram at Ranc... Show more | Bureau of Land Management | 1/20/2010 |
ABBA DISTRIBUTORS, INC. | $51,302 |
22000sf metal building for civil maintenance
This spending item is part of a $6,753,706 allocation.
See details
|
Bureau of Reclamation | 8/03/2010 |
KRISTER OLMON, INC. | $48,201 | Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer | National Park Service | 5/14/2010 |
EN POINTE GOV INC | $48,133 | Award for HP Switches | National Park Service | 4/14/2010 |
KRISTER OLMON, INC. | $48,021 | Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer | National Park Service | 5/14/2010 |
EXBON DEVELOPMENT, INC. | $46,129 | Complete demolition of two existing 5 ton HVAC systems, and replace with upgrades of energy star units | National Park Service | 8/26/2009 |
AC PROS, INC. | $30,980 |
Maint, rep/alter/all other, replacement of 2 HVAC units with air ducts
This spending item is part of a $46,129 allocation.
See details
|
National Park Service | 8/26/2009 |
DATALED TECHNOLOGIES, INC. | $29,000 | T-8 LED TUBES | National Park Service | 2/04/2010 |
DATALED TECHNOLOGIES, INC. | $29,000 | ARRA-Light BULB REPLACE, LED T-8 TYPE LAMPS | National Park Service | 2/04/2010 |
SURIRAT DEVELOPMENT, INC. | $26,005 | Roan plateau travel management | Bureau of Land Management | 6/01/2010 |
KINEMETRICS, INC. | $24,581 | Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | Geological Survey | 1/04/2009 |
SURIRAT DEVELOPMENT, INC. | $18,897 | Eqipment w/operator | Bureau of Land Management | 3/03/2010 |
MOD ELECTRONICS INC | $17,894 | GPS Clocks | Geological Survey | 12/08/2009 |
Morrow Meadows Corporation | $16,073 |
Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/24/2009 |
EXBON DEVELOPMENT, INC. | $15,149 |
Maint, rep/alter/all other, replacement of 2 HVAC units with air ducts
This spending item is part of a $46,129 allocation.
See details
|
National Park Service | 8/26/2009 |
KRISTER OLMON, INC. | $3,114 |
AE DESIGN SERVICES FOR SCHEMATIC DESIGN DEVELOPMENT AND CONSTRUCTION FOR FURNACE CREEK VISITORS CENTER AT DEATH VALLEY NATIONAL PARK.
This spending item is part of a $291,741 allocation.
See details
|
National Park Service | 8/06/2009 |