Riverside County, Calif., funds by Interior, Department of
Listing $49,901,355.74 in stimulus funds from Interior, Department of for Riverside
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
EASTERN MUNICIPAL WATER DISTRICT | $10,793,000 | Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Longfellow Road | Bureau of Reclamation | 12/31/2009 |
EASTERN MUNICIPAL WATER DISTRICT | $8,075,372 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
FLINTCO, LLC | $6,573,676 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
PACIFIC HYDROTECH CORPORATION | $6,077,600 |
Water Reclamation and Reuse Program Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project
This spending item is part of a $11,265,000 allocation.
See details
|
Bureau of Reclamation | 12/11/2009 |
RANCHO CALIFORNIA WATER DISTRICT | $4,129,000 | Water Reclamation and Reuse Program The Vail Lake Water Storage Pipeline and Pump Station Project is a component of the Rancho California Water District's (RCWD) Demineralization and Non-Potable Water Conversion Project, which when completed will increase water storage by 10,000 acre feet p | Bureau of Reclamation | 12/11/2009 |
RESERVATION TRANSPORTATION AUTHORITY | $2,777,325 | Recovery Act of 2009: Capital Improvement and Maintenance Invest in Public Transportation | Interior, Department of | 9/28/2010 |
PACIFIC HYDROTECH CORPORATION | $2,100,057 |
Water 2025 Construction of the Oro Grande Wash Recharge Project
This spending item is part of a $3,609,079 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
ELSINORE VALLEY MUNICIPAL WATER DISTRICT | $1,847,000 | Water Reclamation and Reuse Program This Agreement covers the construction of Phase I of the Wildomar Recycled Water System, a component of the Elsinore Valley Municipal Water District Projects. The project is located in Riverside County, California. | Bureau of Reclamation | 9/14/2010 |
IAW CONSTRUCTION, INC. | $1,708,602 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
AGUA CALIENTE BAND OF CAHUILLA INDIANS | $1,669,324 | Highway Planning and Construction Reconstruction of 0.7 miles on Bob Hope Drive between Ramon Road and Dinah Shore Drive, Route R110 (City Road) Project No. J54-584-R110 (54421) 2&3, located in Rancho Mirage, California, Riverside County. | Indian Affairs (Assistant Secretary) | 1/15/2010 |
GEOVISION, INC. | $498,909 | Geotechnical (Vs30) site measurements at 189 sites | Geological Survey | 3/31/2010 |
DYRON V. MURPHY ARCHITECTS, PC | $329,175 | Construction Administration Services for Sherman I.S. | Indian Affairs (Assistant Secretary) | 1/07/2010 |
K.C. EQUIPMENT, INC. | $326,110 | Amboy Access Road & Parking Lot | Bureau of Land Management | 5/18/2010 |
FOOTHILL ENGINEERING AND DEWATERING, INC. | $291,776 |
CONSTRUCT INLET CANAL AT TOPOCK MARSH AT HAVASU NWR
This spending item is part of a $2,771,016 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/29/2010 |
INLAND FOUNDATION ENGINEERING INC | $288,534 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
SOBOBA BAND OF LUISENO INDIANS | $251,000 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic acheivement standards. | Indian Affairs (Assistant Secretary) | 11/09/2009 |
SOBOBA BAND OF LUISENO INDIANS | $251,000 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk for failing to meet state academic achivement standards.ARRA funds providing new computers,instructional books,library books and Smart Interactive Whiteboards. | Indian Affairs (Assistant Secretary) | 11/09/2009 |
SHP ENGINEERING & ARCHITECTURE | $220,731 | on-site inspection services at the Sherman Indian High School renovation | Indian Affairs (Assistant Secretary) | 1/22/2010 |
INLAND EMPIRE ARCHITECTURAL SPECIALTIES, INC. | $144,571 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
ENGINEERING RESOURCES OF SO CALIFORNIA | $141,290 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
GREAT BASIN INSTITUTE | $141,081 | Forests and Woodlands Resource Management These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Bureau of Land Management | 2/12/2010 |
GREAT BASIN INSTITUTE | $133,212 | Forests and Woodlands Resource Management These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Bureau of Land Management | 2/12/2010 |
SUMMITT FORESTS INC | $124,334 | DOS PALMAS PROJECT | Bureau of Land Management | 3/08/2010 |
EDJE-ENTERPRISES! | $114,000 |
This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation.
See details
|
National Park Service | 2/18/2010 |
MORONGO BAND OF MISSION INDIANS INC | $100,789 | Highway Planning and Construction Operation and Administration of the Indian Reservation Roads Program | Indian Affairs (Assistant Secretary) | 9/15/2010 |
NATURAL RESOURCES CONSULTING, INC. | $98,983 | BLM is planning a vegetation modification (fuels) project to achieve fire and fuels-related goals such as providing an area along roads to allow for safe passage of personnel during fires and providing areas along roads that can be used as control lines o | Bureau of Land Management | 2/26/2010 |
SWEAT, ROBERT | $95,850 | RECOVERY ARRA ROAD BRUSHING | Bureau of Land Management | 8/19/2010 |
SWEAT, ROBERT | $80,500 | HAUSER MTN ROAD BRUSHING CHIP & REMOVE BIOMASS | Bureau of Land Management | 6/23/2010 |
SWEAT, ROBERT | $80,100 | HAND CUT, SPRAY, AND REMOVE TAMARISK | Bureau of Land Management | 10/23/2009 |
SWEAT, ROBERT | $80,000 | HAND CUT AND APPLY HERBICIDE | Bureau of Land Management | 12/03/2009 |
K.C. EQUIPMENT, INC. | $77,770 | RECOVERY: EL MIRAGE VISITOR CENTER ACCESS ROAD | Bureau of Land Management | 11/19/2009 |
SWEAT, ROBERT | $61,000 | DESERT RESTORATION CUT AND SPOT APPLICATION OF HERBICIDE | Bureau of Land Management | 6/15/2010 |
PATRIOT AEROSPACE | $39,024 | MOVING SERVICE FOR SHERMAN INDIAN HIGH SCHOOL, BUILDING 60., INCLUDING TEMPORARY STORAGE. | Indian Affairs (Assistant Secretary) | 5/05/2010 |
SOBOBA BAND OF LUISENO INDIANS | $35,640 | Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards | Indian Affairs (Assistant Secretary) | 8/01/2011 |
FIRESTORM WILDLAND FIRE SUPPRESSION INC | $35,325 | HAND CUT, CHIP AND BIOAMSS REMOVAL | Bureau of Land Management | 10/28/2009 |
SUMMITT FORESTS INC. | $29,885 | Hand cut, spray, and remove citrus trees BLM CA | Bureau of Land Management | 3/17/2010 |
CABAZON BAND OF MISSION INDIANS | $23,495 | Indian Reservation Roads Construction | Interior, Department of | 9/18/2010 |
ENGINEERING RESOURCES OF SO CALIFORNIA | $23,216 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
ASM AFFILIATES INC | $14,707 | Archaeological Monitoring for the Dos Palmas Tamarisk Removal Project. | Bureau of Land Management | 2/18/2010 |
ASM AFFILIATES INC | $9,440 | Conduct record searches and surveys for and complete inventories of cultural resources and independently provide project-related cultural assessments/reports and impact analyses. We shall screen individual tamarisk removal treatments to determine the lev | Bureau of Land Management | 12/18/2009 |
SWEAT LLC | $8,954 | PURCHASE ORDER L10PX03285 FOR THE REMOVAL OF BLACK MUSTARD AND SHORT-POD MUSTARD. | Bureau of Land Management | 6/04/2010 |