San Diego County, Calif., funds by Interior, Department of
Listing $60,433,452.85 in stimulus funds from Interior, Department of for San Diego
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
J.R. FILANC CONSTRUCTION COMPANY, INC. | $44,775,535 | Water Reclamation and Reuse Program Cooperative Agreement between the United States Bureau of Reclamation (USBR) and the Santa Clara Valley Water District (SCVWD) to construct the South Bay Advanced Recycled Water Treatment Facility (ARWTF) to treat secondary effluent from the San Jose/Sant | Bureau of Reclamation | 5/17/2010 |
PCL CONSTRUCTION SERVICES, INC | $4,823,606 | Construction of Fish & Wildlife Complex. Project includes an administration/visitor center, service building, resource room, an underground sanitary tank, and landscaping for a site trail. A parking lot is also being constructed. Number of subcontracts i | U.S. Fish and Wildlife Service | 5/26/2010 |
YSI INCORPORATED | $1,074,199 | Acoustic Doppler instruments used to measure water flow: 4 Flowtrackers, 32 RiverSurveyor M9 and power communication modules, 1 RiverSurveyor S5 and power communication module | Geological Survey | 3/30/2010 |
SONTEK/YSI INC | $732,251 | Acoustic Doppler Hand-held Portable Water Velocity / Flow Measurement System. 81 Handheld Flowtrackers; 15 Shallow Water Acoustic Dopplers; 3 Acoustic Doppler Profilers; Side Looking Doppler Current Meter 17 pcs + 4 pcs + 6 pcs= 27 pcs with different samp | Geological Survey | 6/05/2009 |
TELEDYNE R D INSTRUMENTS INC | $658,070 | Acoustic Doppler Current Profiler, Streampro and Workhorse Rio | Geological Survey | 6/05/2009 |
MEDSPHERE SYSTEMS CORPORATION | $621,240 |
The primary objective of this contract is to enable I/T/U healthcare facilities to meet the performance measure reporting requirement for Phase 1 Meaningful Use by developing software that produces new performance reports that includes all clinical qualit
This spending item is part of a $1,835,188 allocation.
See details
|
Office of Policy, Management and Budget/Chief Financial Officer | 9/29/2010 |
ENVIRONMENTAL SCIENCE ASSOCIATES | $600,000 | Water Reclamation and Reuse Program Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document | Bureau of Reclamation | 9/29/2009 |
BLACK & VEATCH CORPORATION | $528,000 | Water Reclamation and Reuse Program Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document | Bureau of Reclamation | 9/29/2009 |
TELEDYNE RD INSTRUMENTS, INC. | $500,540 | Purchase of Discharge Measurement Systems wth Flotation Devices, Acoustic Doppler Current Profilers (ADCP). | Geological Survey | 3/30/2010 |
YSI INCORPORATED | $498,833 | Acoustic doppler instruments used to measure water flow: 45 Flowtrackers, 6 Shallow Water (SW's), 30 Side Looking Argonauts (ASL) | Geological Survey | 3/29/2010 |
YSI INCORPORATED | $452,285 | Acoustic doppler instruments used to measure water flow: 37 Flowtrackers, 10 Shallow Water (SW's), 21 Side Looking Argonauts (ASL), 5 Extended Range Argonauts (AXR) | Geological Survey | 3/31/2010 |
ATI INTERNATIONAL | $347,358 |
The USGS Northern California Seismic Network (NCSN) and Southern California Seismic Network (SCSN) have issued a comprehensive contract to LGS to provide all of the equipment and services needed to make these sites operational as part of the microwave net
This spending item is part of a $1,478,971 allocation.
See details
|
Geological Survey | 6/30/2010 |
PADRE DAM MUNICIPAL WATER DISTRICT | $330,000 | Water Reclamation and Reuse Program Complete the preliminary and design phase of the expansion of the Padre Dam Water Recycling Facility and obtaining permits. | Bureau of Reclamation | 9/29/2009 |
AGRARIAN RESEARCH AND MANAGEMENT COMPANY LTD. | $315,865 | Fuels Management Monitoring project to support BLM Palm Springs - South Coast Field Office fuels management program for community protection and habitat improvement. Note: BLM modified award amt from original $313,364.00 to $315,865.00 with Mod 1. | Bureau of Land Management | 2/06/2009 |
AMERICAN BUILD & DESIGN, INC | $283,276 |
REPLACE AN OLD MAINTENANCE SHOP MODOC WITH A NEW 60' X 120' PRE-ENGINEERED STEEL MAINTENANCE SHOP AT THE MODOC NATIONAL WILDLIFE REFUGE P.O. BOX 1610 ALTURAS, CA 96101
This spending item is part of a $556,167 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/22/2009 |
PORTER NOVELLI INC | $265,000 |
Water Reclamation and Reuse Program Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document
This spending item is part of a $335,713 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
Rgb | $241,994 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
A&P DEVELOPMENT & CONSTRUCTION, INC. | $233,899 | Survey Boundry and fencing | U.S. Fish and Wildlife Service | 12/30/2009 |
A&P DEVELOPMENT & CONSTRUCTION, INC. | $233,899 | San Diego Wildlife & Refuge Perimiter Fencing | U.S. Fish and Wildlife Service | 12/30/2009 |
EWIIAAPAAYP BAND OF KUMEYAAY INDIANS | $211,785 | Highway Planning and Construction American Recovery and Reconstruction Act (ARRA) Indian Reservation Road (IRR) | Indian Affairs (Assistant Secretary) | 9/30/2010 |
AMERICAN BUILD & DESIGN, INC | $206,096 |
Replace old Maintenance Shop Ruby Lake with a new 50' x 150' Maintenance Shop at the Ruby Lake National Wildlife Refuge HC 60, Box 860 Ruby Valley, Nevada 89833
This spending item is part of a $591,757 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/23/2009 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $190,000 | Earthquake Hazards Reduction Program The program announcement 10HQPA0008 through the United States Geological Survey's (USGS) National Earthquake Hazards Reduction Program (NEHRP) entitled, Proposals for Upgrades to Crustal Deformation Monitoring Systems under the American Recovery and Reinv | Geological Survey | 2/25/2010 |
AMEC E&I, INC | $188,297 | Resident Engineer/inspection services for construction of the ARRA funded San Diego National Wildlife Refuge Complex Visitor Contact/Administration Headquarters and Service Building. | U.S. Fish and Wildlife Service | 6/21/2010 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $182,733 | Earthquake Hazards Reduction Program The specific operational objective of this proposal consists of one critical element of replacing data acquisition systems at all ANZA non-Q330 equipped stations. The components of this element are: 1. Upgrade of existing Toro Peak Telemetry 2. Upgrade | Geological Survey | 7/07/2009 |
OCEANSCIENCE GROUP LTD., THE | $135,583 | Riverboat for Stream Pro ADCP Riverboat w/GPS for Rio Grande ADCP Riverboat w/o GPS for Rio Grande | Geological Survey | 9/29/2009 |
LA JOLLA BAND OF LUISENO INDIANS | $125,147 | Highway Planning and Construction OPERATION AND ADMINISTRATION OF THE ARRA INDIAN RESERVATION ROADS PROGRAM LISTED UNDER THE ATTACHED SUBPART J CONTRACT | Indian Affairs (Assistant Secretary) | 9/15/2010 |
Ferandell Tennis Courts Inc | $125,116 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
SJA, INC. | $119,685 |
Yuma Desalting Plant and Area Office, Seismic Rehabilitation Modification-Project No. 30.000-TAS::14 0681 TAS
This spending item is part of a $1,081,496 allocation.
See details
|
Bureau of Reclamation | 6/30/2010 |
SONTEK/YSI INC | $116,050 | Floating platforms for use with Acoustic Doppler Profilers: 17 Riverboat for M9/S5; 28 Hydroboard for S5/M9 Small | Geological Survey | 9/29/2009 |
IIPAY NATION OF SANTA YSABEL | $113,545 | Road Maintenance_Indian Roads road repair | Indian Affairs (Assistant Secretary) | 9/28/2011 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $110,808 | GDIT to provide Bureau of Land Management -Sacramento CA with Master Title Plats clipping and geo-referencing to include 1) project administration and application development 2)clipping and geo-referencing: MTP Image Reg. and Clipping; 3) Clipping and Geo | Bureau of Land Management | 3/31/2010 |
CAMPO BAND OF MISSIONS INDIANS | $105,756 | Road Maintenance_Indian Roads Bureau of Indian Affairs Road Repair and Restoration Project pusuant to the American Recovery and Reinvestment Act 2009 (ARRA). The project seeks to enhance the level of service of a major transportation artery, BIA Route 10 through vegetation management | Indian Affairs (Assistant Secretary) | 3/30/2010 |
RECON ENVIRONMENTAL | $69,659 | Habitat Restoration at Little Morongo Canyon Desert. Assessment of current conditions of the site, identifying existing plant species and seed sources for revegetation efforts, and monitoring. | Bureau of Land Management | 3/30/2010 |
RECON ENVIRONMENTAL | $62,965 | Border Habitat Restoration which includes habitat assessment for Quino Checkerspot Butterfly (QCB) within the project area and preparation of a Site Conditions Report | Bureau of Land Management | 3/12/2010 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $62,200 | Earthquake Hazards Reduction Program Title: Infrastructure Upgrades and Repairs for Improved Monitoring of Crustal Deformation at Pinon Flat and Durmid Hill. Description: Efforts supported by this award are to improve the long-term reliability of the long baseline strainmeters l | Geological Survey | 1/27/2010 |
AMERICAN BUILD & DESIGN, INC | $61,706 |
UVALDE, TX 20x20x12 METAL BUILDING & 40x50x16 STEEL SHADE STRUCTURE
This spending item is part of a $90,056 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/31/2009 |
DREW GEORGE & PARTNERS, INC. | $60,900 | Provide LEED Project Management Services to facilitate LEED Gold Certification for the new San Diego NWRC Visitor Contact Station / Administration Headquarters and a LEED Silver Certification for the Service/Support Building. Work with the project team s | U.S. Fish and Wildlife Service | 12/07/2009 |
WORLD LIBERTY FOUNDATION | $58,560 | REMOVE, RECYCLE AND REPLACE FOUR WIRE STEEL POST FENCE | U.S. Fish and Wildlife Service | 8/12/2009 |
UNIVERSITY OF CALIFORNIA, SAN DIEGO | $56,208 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The award is to support direction and eradication of Zostera japonica, an invasive, non-native eelgrass found on intertidal mudflats of Humboldt Bay. | U.S. Fish and Wildlife Service | 12/09/2010 |
RPR ARCHITECTS | $54,381 | Value Engineering Study of the design devlopment documents, completed by Line and Space LLC of a new Visitors center and Administrative Facility at the San Diego National Wildlife Refuge Complex at Chula Vista California. | U.S. Fish and Wildlife Service | 11/12/2009 |
RICK, GLENN A ENGINEERING & DEVELOPMENT CO | $50,475 | Develop Design Solutions to the Drainage Channels and Surrounding Slopes along Millar Ranch Road at San Diego NWR, CA | U.S. Fish and Wildlife Service | 12/03/2009 |
MC PAINTING | $49,819 |
The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw
This spending item is part of a $11,623,675 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/29/2009 |
BRIDGETTE, INC | $48,906 | 48TB 4U SAS/SATA RAID Storage System -48 Bay SAS to SAS/SATA 4U Rackmount disk enclosure, with dual disk IO Module (3) 4x SAS External connections. Triple Integrated Fan Module and N 1 Power Supplies, Integrated Enclosure Services, and pre-assembled | Geological Survey | 4/01/2010 |
AMERICAN MAINTENANCE AND ENGINEERING, INC. | $44,380 | Millar Ranch Road Drainage Repair | U.S. Fish and Wildlife Service | 6/21/2010 |
WINZLER & KELLY | $42,788 | Design a new 25 space parking lot adjacent to the existing driveway access to the Visitor Center. Parking lot will provide ADA access from the Visitor Center parking lot and will have a trail head connection. | Bureau of Land Management | 7/30/2010 |
RECON ENVIRONMENTAL | $38,569 | Habitat Assessment of approximately 4000 acres including the development of a restoration plan, identifying existing plant/wildlife species, and seed collection. | Bureau of Land Management | 4/01/2010 |
Howard H Chang PHD | $30,000 |
Water Reclamation and Reuse Program Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document
This spending item is part of a $335,713 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
ROESLING NAKAMURA TERADA ARCHITECTS, INC | $28,317 | Death Valley National Park, California-Specialized Review of LEED Submittals and site visits for Replacement of Twelve Deteriorated Trailers at Grapevine Housing Area, Phase II-PMIS #121639 | National Park Service | 5/18/2010 |
EPSILON SYSTEMS SOLUTIONS, INC. | $26,430 |
Provide engineering services required for the development of construction plans, specification and estimate (PS&E) to facilitate new construction of 0.15 miles of BIA Route 2505-10 & 0.12 miles of BIA Route 6034-30 on the Wampanoag Indian Reservation.
This spending item is part of a $142,185 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 4/09/2010 |
UNDERGROUND SOLUTIONS, INC | $23,550 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
Diane D Schooler | $23,297 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
Diane D Schooler | $22,769 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
MCP COMPUTER PRODUCTS INC | $21,467 | DELL PRECISION M6400 | U.S. Fish and Wildlife Service | 8/24/2009 |
RECON ENVIRONMENTAL | $21,330 | Conduct archaeological survey of approximately 301 acres of BLM-managed land at Hauser Mountain, California | Bureau of Land Management | 6/15/2010 |
ASM AFFILIATES INC | $18,926 | South Coast Archaeological Surveys for Road Brushing. | Bureau of Land Management | 2/17/2010 |
UNDERGROUND SOLUTIONS, INC | $9,400 |
Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation.
See details
|
Bureau of Reclamation | 12/31/2009 |
HELIX WATER DISTRICT | $0 |
Water Reclamation and Reuse Program Complete the environmental documentation for the El Monte Valley Groundwater Recharge, Mining, and Reclamation Project. Environmental documentation includes California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) document
This spending item is part of a $335,713 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |